Loading...
5.7. SR 08-21-2006 City of Elk River REQUEST FOR COUNCIL ACTION Agenda Section Meeting Date En ineerin Au ust 21, 2006 Item Description TH 169 Geometric and Environmental Study Item Number 5.7. Prepared by Terr i Ivlaurer, Ci Reviewed by Introduction TIlls is a follo\v-up to tlle se"veral previous discussions staff llas had \v-idl tlle City Council regarding potentially funding the I:vlnDOT Geometric and En\rironmental Study on TH 169 tlltough Elk River. Discussion I\{nDOT has committed to \vriting responses to our questions regarding the potential funding of tlle TH 169 Study. In general, tile Wee main points are as follo\vs: 1. Tile estimated cost of tlle study is approximately $1 million dollars, llo\vever, if tile study requires an En\Tironmental Ilnpact Statement .versus an En\Tll:onmental.L\ssessment, the cost could rise substantially. _A.ltllougll :i\lnDOT belie'ves dlat an En'rllonmental .t\ssessment \vill be sufficient, the final determination cannot be made until the study is \vell under\vay. The only safety net pro\Tided relative to tlle $1 million dollar cost is tllat tlle City can cancel tile contract at any time \vitll 30 days notice. So, if in fact an Environmental Ilnpact Statelnent is required, tlle City could decide to cease funding of the study so as not to incur substantially lligller costs. 2. IvInDOT llas determined tllat tile funding of tlle study by tlle City can utilize ivIuni<;ipal State Aid dollars. Ho\ve\Ter, it sIlould be noted that \vitll the \Vaco Street and Highland Road projects in 2006, the City's NIunicipal State Aid fund is essentially depleted. In the near future, tile City \v.ill be expending ~lunicipal State Funds for land acquisition and partial funding for tlle 193rd Avenue corridor extension. If the City'\vishes to commit $1 lnillion dollars from 1:furucipal State ..L'\id Funds for tile TH 169 Study, they \vill be committing approximately 1 1/2 years allottnent into tile future for tlus study. 3. IvlnDOT 11as no \vay internally of prov'iding assurances tllat a credit \vould be given for tlle City's expenditure in the future \vllen cost participation is asked of tlle City for construction along TH 169. ...Also attached is information from Craig Robinson, 1JnDOT's Project tvfanager for TH 169 tllat summarizes tlle project schedule and steps for conducting the study, and a sUlnmary of tlle deli'Terables required by tile contract '\Vitll SRF. S:\EnbrinecrImprovProj\2006 Improvement Projccts\TH 169 Study\07 31 06 CC memo. doc Financial Impact The financial impact to the City is estllnated at $11nillion dollars. It is proposed to be funded \vidl 1vrunicipal State Aid dollars, \vhicI1 \vould conunit approximately 1 Yz years' annual allotment to the TH 169 Study. Attachments . July 11, 2006 Letter from Craig Robinson . July 28, 2006 Letter from Craig Robinson \vitl1 attachments relati\Te to project sclledule and deliverables Action Requested Discussion by tlle City Council and direction to staff as to ho\v~ to proceed \vith this issue. Council Action }\lotion by Second by _ 'lote Follow Up S:\EngincerImprovProj\2006 Improvement Projects\TH 169 Study\07 31 06 CC memo.doc il'~~ ~1 ff1t:? 1. \~Ldu[j (~\l\NESo,;_"1 Minnesota Department of Transportation ~ ~ l ~ ~ ~ District 3 ... Transportation ~ ~~<P 3725-12th St. North OF Tfl.~ St. Cloud, MN 56303 Office Tel: 1/800/657-3961/320-223-6526 Fax: 320-223-6580 July 11, 2006 Mr. Terry Mauer, City Engineer City of Elk River 13065 Orono Parkway Elk River, MN 55330 Re: TH 169 Study Dear Mr. Mauer: As you know, Mn/DOT had intended to begin a study this Spring of TH 169 Corridor from TH 10 in Elk River to TH 95 in Princeton. Unfortunately, before the study began funding was pulled and the study was reduced in scope to looking at the Zimmerman area as Federal HPP monies were available for the portion of the study. In meetings with City Staff, the question of the City funding the portion of the study through Elk River was discussed. I have done some investigating and here is what I found: 1. From Mn/DOT's standpoint, it is certainly possible. 2. The estimated cost of this portion of the study is $1 Million. 3. This estimated cost is assuming an Environmental Assessment will suffice. If an Environmental Impact Statement is required, the cost will be higher. 4. Mn/DOT will not front-end any monies, so the City must be prepared to pay the bills as they arrive. The Study will most likely be completed by the end of 2007. 5. State Aid monies may be used for the study. 6. A grant from State Aid is possible, but the request must be made and must compete with other requests. 7. Mn/DOT will not allow future credits for any monies expended by the City. 8. If the City decides to fund this, Mn/DOT1s existing contract with SRF covers this area so work could begin immediately. 9. The Contract can be cancelled at any time with 30 days notice, so if the study was getting too expensive, the City could withdraw. As we discussed previously, the anticipated outcome of the Study would be an approved Environmental Document and a Mn/DOT Staff Approved Layout ready for approval by the City. Unfortunately, there is still no time table for construction. I hope this answers the questions you had. If you want to discuss this more, please call me at 320-223-6526. Sin/!cereIY, d1:2 ' .' ... I u' '/ /' L-:t/v--c:; /-<',' .. .,.. Craig ~s'on, PE Project' Development Engineer - 03 CR:cas c: Jim Povich - 81. Cloud DOT Kelvin Howieson - Baxter DOT File O(~\~N.EISo14 "k Minnesota Department of Transportation ~ 9- li ~ \ I District 3 - Transportation 4-}-o~ 11\~~c; 3725-12th 81. North Office Tel: 1/800/657- 3961 /320-255-4181 81. Cloud, MN 56303 Fax: 320-255-3257 July 28, 2006 Terry Maurer, P.E. Elk River City Engineer 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: Trunk Highway 169 (TH 169) Interchange Study - Elk River to Princeton Dear Mr. Maurer: Per your request to Dave Montebello at SRF, I am sending background information for the TH 169 Interchange Study from Elk River to Princeton. This packet is intended to provide additional information for the City Council as they deliberate their major financial contribution to this study. The latter portion of this letter includes problem and study purpose statements. A copy of the original study schedule and the original list of deliverables are also enclosed with this letter. Please share these materials with your City Council. As you share and review these materials, note the following: · Schedule and deliverable dates will be revised if the Elk River City Council chooses to move forward with this study. · The schedule includes planned meetings and stakeholder and public involvement opportunities. The study would include participation in a Local Advisory Committee (Le., City Engineer and/or Planner, others may be appointed if needed) that serves as the study steering committee, along with a number of agency and pu blic meetings. · A portion of the original study, the portion in the Zimmerman area (TH 169 from County State Aid Highway 25/19 to 273rd Avenue), has been underway since March 2006. If the Elk River City Council chooses to move forward with this study, the added portions of the study will need to be brought together with the Zimmerman piece so that the study produces one environmental document for the entire study area. This synthesizing process can be accomplished but will require some additional effort and resources. The remainder of this letter provides key background information for the TH 169 Interchange Study from Elk River to Princeton. STUDY PROBLEM STATEMENT The TH 169 corridor is an important north-south principal arterial route in central Minnesota. This route connects Minnesota's central lakes region with the greater Twin Terry Maurer, P.E. -Page 2- July 28, 2006 Cities metropolitan area as well as the growing trade centers of Princeton, Zimmerman, and Elk River. Currently this facility is a four-lane divided expressway with signals at major intersections and some limited frontage and backage road systems. As growth has extended out from the Twin Cities into Sherburne County, commuter traffic has significantly increased. This has caused safety and congestion issues on TH 169 and at many local road intersections. In addition, because the corridor is one of the primary recreational links to the central lakes region, it has significant recreational volumes and a greater percentage of vehicles pulling trailers, which affects roadway operations. Furthermore, Sherburne County has significant aggregate resources, and many of these resources are located along TH 169 between Elk River and Zimmerman. These facilities generate a significant amount of truck traffic on TH 169. The use of these aggregate resources is likely to increase as aggregate sources in and around the Twin Cities area become depleted. These large trucks affect the operations of TH 169 and create safety concerns. STUDY PURPOSE The purpose of the TH 169 Interchange Study from Elk River to Princeton is to develop a detailed, long-term access strategy for TH 169 that transitions TH 169 from an 8t- grade expressway facility to 8 limited access, grade-separated freeway facility. The study will produce staff approved layouts and environmental documentation that include the following three components: 1. Future TH 169 interchange locations 2. Preferred Alternatives for interchange designs 3. Frontage and backage road system that replaces direct access eliminated as part of the freeway conversion. The study will analyze the need for the transition to a limited access, grade-separated freeway facility and propose a roadway system that meets current and future transportation needs in the TH 169 corridor. The selection of a preferred TH 169 alternative will provide greater clarity for Elk River in planning future infrastructure and land use in the T H 169 corridor. Please contact me at (320) 223-6526 if you or the Counci I have any questions. Sincerely, a-,~ (' /tr Craig Robinson, P.E. Project Development Engineer Cc: Dave Montebello, SRF Enclosures H:\Projects\5669\TP\Admin\Elk River Mat'ls\Cover letter.doc Project Schedule 2008 J 2007 F 2006 A M F D N o May 2007 - Nov 2008 EA/EAW or EIS s A J J M A M o N o s A J J M Apr Mar Feb Jal C:, ,c: 0: ~ ... -.. I.. I C.J:\ t I I n' jn --- : -PH1- I " I- ... I -M; -c: .C;{-. .C:'J C2\ A .c, c Clf. -c August 2006 Project Evaluation Mar - Apr 2006 Preliminary Scoping/ Alternative Identification Innovations -C,( Jan - Feb 2006 Project Mobilization & Preliminary Analysis C ED FJ. t( CoordinDt ion Meetings* Meetings Web Updates M,; .w~ Me ME ...W'. M:: 5 = Scoping Meeting >I< Final number of meetings to be determined in scoping process w. M H = Open 1.louse PH = Public Hearing F = Field Wall{s K = Kickof TH 169 Elk River to Princeton Estimated SRF Deliverable Dates ~ Project Management deliverables as identified in include meeting agendas, meeting minutes, project status reports, presentation materials, handouts and follow-up correspondence to coordinate work activities. (These will be delivered on an ongoing basis throughout the study process). ~ Assembly of background information for corridor, development of GIS base map showing existing issues, constraints and opportunities in the study area, assembly of historic traffic and crash information, water resources overview map, water resources regulatory matrix. Estimated deliverable date (April 2006). 62- SRF to document changes in layouts and rationale for changes; conduct traffic analysis of alternatives, and document transportation purpose and need. Information to be developed throughout 2006 with final traffic memorandum delivered by December 2006. 2.3 Alternatives evaluation report documenting process, analysis, alternative modifications, evaluation matrix and recommendations (January 2007). Seoping meeting materials and follow-up meeting documentation (February 2007). Benefit-cost memorandum (December 2006). 3.0 Draft/Final Noise Analysis, Tech Memo (September 2007), Noise Exemption Request (October 2007), Draft /Final Wetlands Tech Memo (September 2007); AD 1006 form, draft EA/EAW (November 2007), Final EA/EAW, draft/final responses to comments (December 2007), Draft/Final FONSI (May 2008). 4.0 Hydraulics letter, formulating ponding stage, locations and special water quality treatment requirements (June 2007). 5.0 Coordination through meetings, emails, phone-calls and/or drawings for preliminary design task (These to be delivered on an ongoing basis throughout the study process). Final geometric staff approved layouts for entire corridor (August 2007). Assistance and attendance at meetings with local agencies to obtain municipal consent (September to December 2007). 6.0 Documentation of utility correspondence and contact list, placement of utility information on geometric layouts (August 2006). 7.0 Public Involvement deliverables include meeting notices, materials, boards, presentation materials, and meeting summaries for up to 22 LAC meetings and one open house meeting. It also includes establishment of web site with up to six web updates (These to be delivered on an ongoing basis throughout the study process). 9.0 Design memorandum (Estimated delivery date January 2008) 10.0 Document traffic and safety analysis methodology and results for TH 169 corridor from Elk River to Princeton. Analysis to include LOS at key intersections, travel time comparisons in the Elk River area) Merge/Diverge analysis of ramp locations for freeway alternatives. Results to be documented in technical memorandum (December 2006).