Loading...
5.11. SR 08-21-2006 City of Elk River REQUEST FOR COUNCIL ACTION Agenda Section Meeting Date En · eerin Au st 21, 2006 Item Description HigWand Road Sanitaty Sewer and Water Assessment Item Number Introduction The Highland Road Project is proceeding and will be substantially complete this fall. As you are aware, sanitaty sewer and water are part of the construction. We have received a number of inquiries about the cost to hook up to the City sanitaty sewer and water system. Discussion We have reviewed the costs for sanitaty sewer installation and the costs for the modifications to the existing water system with the current bid. In addition, we have taken a look at the investment the Elk River Mnnicipal Utilities have made in the trunk line connecting the two high pressure zones via the Highland Road corridor. We have measured that against the number of properties that could be served by it, keeping in mind that some of the properties will be able to be subdivided in the future with sanitaty sewer and water available. Also, there is a larger area included in the City's Urban Service District which will be someday be served through these facilities. With this analysis as a backdrop, we are recommending that existing properties that want to hook up to sanitaty sewer and water be charged a $15,000 assessment. This would be in addition to the already levied street assessment. Properties wanting to hook to sanitaty sewer and water would have to sign a Petition and Waiver, accepting the $15,000 assessment. The assessment would be charged against their property at 5.50/0 interest, which was the interest rate used on the street assessment. In an effort to recover the City's time value of the money expended to place these facilities in 2006, we are recommending that each subsequent year, the $15,000 assessment value be increased by 30/0. This is the same inflation factor that has been utilized for several years in the trunk sewer and water assessment rates. In addition to accepting the assessment, anyone wishing to hook up to sewer and water will need to pay a Sewer Availability Charge (SAC) and Water Availability Charge \WAC), as well as physically make the connection from the property line to their home. It would be staff's recommendation that once the City Council has had an opportunity to discuss and review this issue, that an informational mailing detailing all of these issues be sent to each of the property owners along Highland Road. Financial Impact There is no financial impact as the City Council and Elk River Municipal Utilities have made the decision to expend the monies to extend sanitary sewer and modify the existing water systems along Highland Road. Any financial impact would be in a positive direction if residents decide to hook up and agree to begin paying an assessment for the sanitary sewer and water system. Attachments - None Action Requested Discussion of this issue at a Council level and direction to staff to send an informational mailing to Highland Road residents. Council Action Motion by _ Second by _ Vote Follow Up S:\EngineerImprovProj\2006 Improvement Projects\Highland Road\08 21 06 cc memo. doc