Loading...
5.12. SR 08-21-2006 City of Elk River REQUEST FOR COUNCIL ACTION Agenda Section Meeting Date En · eerin Au st 21, 2006 Item Description School Street/] ackson Avenue Intersection Analysis Item Number 5.12. Prepared by Te Maurer, Ci Reviewed by Introduction This spring, the City Council authorized the analysis of the School Street/] ackson Avenue . . . mtersectlon operation. Discussion The analysis centered on the improvement to the intersection operation that could be achieved by adding left turn lanes to the southbound and eastbound legs, which currently do not have left turn arrows. To facilitate the analysis, turning movement volumes were counted on May 23rd and May 24th from 7 - 9 a.m. and 2 - 6 p.m. As is to be expected, there was a morning peak hour from 7:15 - 8:15 a.m. associated with the beginning of school. The same is true of a p.m. peak from 2:15 - 3:15 p.m. Also, there was a secondaty peak from 4:30 - 5:30 p.m. As has been previously discussed, adding left turn arrows for southbound and eastbound movements would require restriping of J ackson Avenue. The proposal would be to restripe Jackson Avenue from School Street to TH 10 as a three-lane facility with a center left turn lane. This would serve two putposes; 1) it would add a long left turn lane at School Street for the morning a.m. school rush, 2) it would add a left turn lane for the proposed Jackson Villa T ownhome development on the west side of J ackson Avenue. This restriping would require a restriping of a portion of J ackson Avenue north of School Street to make the geometries work properly. The analysis of the existing traffic and future considerations at this intersection indicated that the restriping and modification to the signal to provide left turn arrows on all four legs would improve the overall operation of the intersection. The one exception to this, given the current configuration, was the southbound a.m. peak hour through and right turn lane which would be combined movements, had a relatively long queue length of 230 feet. Further analysis was done to determine whether or not the addition of a separate right turn lane for the southbound leg only would help the situation. The conclusion of this further analysis was a separate right turn lane approximately 200 feet in length including taper would significantly reduce the queue length for the southbound traffic in the a.m. peak. Adding this right turn lane to the southbound leg brings several other issues into play. First, additional right of way would need to be secured from the School District, since the existing right of way of J ackson Avenue would not allow sufficient room for adding a right turn lane. Second, adding the southbound right turn lane would require more significant modifications to the existing signal system. The signal controller which is located in this quadrant would need to be relocated. The signal pole in this quadrant would also need to be relocated, along with an extension to the mast arm. Financial Impact Simply adding the left turn arrows to the two remaining legs of the intersection is a relatively simple modification. The signal mast arms would need to be slightly lengthened and new heads added to facilitate the left turn arrow. All total, the estimated cost to modify the signal would be approximately $35,000. In addition, there would be the cost of sealcoating and restriping Jackson A venue. The second option which includes adding a right turn lane to the southbound leg of the intersection would have much more significant impacts to the signal system. In addition to adding left turn arrows, the controller and the signal pole in the northwest quadrant would need to be relocated and a more significant extension made to the mast arm. These modifications to the signal system are estimated to cost approximately $75,000. In addition, more right of way would need to be secured from the School District. Assuming this could be done at no cost, the construction of the right turn lane is estimated at an additional $75,000. Therefore, this option, which would provide for better intersection operation, has a price tag of approximately $150,000 plus the cost of sealcoating and restriping of J ackson Avenue. Both School Street and J ackson Avenue are eligible for the use of Municipal State Aid funds. Attachments . None, however graphics will be available at Monday evening's meeting to further discuss this issue. Action Requested Discussion of the preliminary intersection analysis and direction to staff on how to proceed with this issue. Council Action Motion by _ Second by _ Vote Follow Up S:\EngineerImprovProj\2006 Improvement Projects\School St.Jackson Intersection\08 21 06 cc memo.doc