Loading...
4.4. SR 04-21-1994 .MS ~ CONSULTING ENGINEERS CIVil ENGINEERING: ENVIRONMENTAl MUNICIPAl PlANNING STRUCTURAl _URVEYING TRAFFIC TRANSPORTATION 1326 Energy Park Drive St. Paul, MN 55108 612-644-.4389 Fax: 612-644-9.4.46 .800 Shelard Parkway Minneapolis, MN 55441 612- 5.46-0.432 Fax: 612-544-6398 ITEM 4.4. April 15, 1994 File: 230-151-30 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: WWTP INTERIM UPGRADE Dear Council Members: On April 14, 1994, we opened the bids for the Wastewater Treatment Plant Interim Upgrade. The results of the bids are tabulated as follows: Gridor Construction, Inc. ABE Construction Company Rice Lake Contracting Madsen Johnson Corporation Lametti & Sons, Inc. $ 918,500 924,000 960,000 997,600 1,013,670 Our engineering estimate for the project was $1,000,000. The lowest bidder was Gridor Construction, Inc. , whose bid was about 8 % lower than our estimate. Gridor Construction, Inc., has completed more than 20 wastewater treatment facility construction projects in the past 10 years. The references we checked indicated that the Contractor is competent to do the work and their performance has been satisfactory. The intent of the wastewater interim upgrade is to build part of the planned major upgrading of the treatment plant this year in order to compensate the failure of one of the main treatment facilities at the existing plant. This construction is necessary to bring the plant in compliance with the effluent discharge standards required by the Minnesota Pollution Control Agency. 151-1502.apr e Honorable Mayor and City Council April 15, 1994 Page Two We recommend award of the contract to Gridor Construction, Inc., as the lowest responsible bidder. Attached is a draft resolution for the City Council's consideration. If you have any questions, please call. Sincerely, MSA, CONSULTING ENGINEERS iJdP~ Bill Chang, P.E. 0- BC:tp Attachment e e 151-1502.apr e e e RESOLUTION 94 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE WWTP INTERIM UPGRADE OF 1994 WHEREAS pursuant to Resolution 94-23, competitive bids were solicited and received for the WWTP Interim Upgrade as set forth in the bid tabulation attached hereto and incorporated herein by this reference; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined that Gridor Construction, Inc., is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with Gridor Construction, Inc., as is approved by the City Attorney for the completion of the WWTP Interim Upgrade according to the approved plans and specifications designated in Resolution 94-23. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract above specified. Passed and adopted this 21st day of April, 1994. Henry Duitsman, Mayor ATTEST: Sandra Thackeray, City Clerk 151-1502.apr