Loading...
6.0. SR 04-21-1994 A./ -\.( ( II rl~ River ITEM 6. MEMORANDUM TO: MAYOR & CITY COUNCIL FROM: PAT KLAERS, CITY ADMINISTRATOR DATE: APRIL 21, 1994 SUBJECT: ELK PARK CENTER DEVELOPER'S AGREEMENT e Attached for your review is the draft Developer's Agreement as prepared by our City Attorney Peter Beck. Peter will be in attendance at this meeting to address any issues or concerns from the City Council. This draft Agreement has been forwarded to the developers for their review. A number of meetings were held with the developers prior to this Agreement being put together and, as a City, we do not anticipate many requests for changes in this Agreement from the developers. The Developer's Agreement covers issues that need to be addressed before a proposal can move forward. These issues include the necessary improvements for the project as outlined in the Feasibility Study, the financing for these improvements, and the security to ensure that the improvements are paid off. Agenda Item #7, the PUD Agreement, along with the plat and site plan reviews, cover other essential elements in the development project. From a City financial point of view, there are two items that should be brought to the City Council's attention where there is a deviation between the Developer's Agreement and the Feasibility Study. First, on Page 8 of the Developer's Agreement, the percentage of the improvements that is to be paid by the developer is outlined. Item G and H were originally estimated at 50% and are now recommended to the City Council to be at 25% for the developer. As the Council is aware, G and H relate to improvements at the School Street and Jackson Avenue intersection which was previously planned by the City. Based on our cost estimates, the changes in G and H result in the developer paying approximately $1.378 million for off site street improvements versus the original proposal of $1.478 million. e The second item relates to the request for the developer to finance a portion of the northeast area water tower. The basis of this original request was founded on the fact that this is the only redevelopment commercial area in the vicinity that requires the water pressure and volume of a larger water tower. The other reason for this request was the need for funds to finance the water tower. Since there is other commercial property in this water district P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 e e e on the east side of Highway 169 that may need the same size of water tower, and since the water connection fees have increased, there is less justification to request this contribution to the water tower from the developers. Therefore, this requested $100,000 contribution is no longer in the proposed Developer's Agreement. This information has been passed on to the Utilities Superintendent and some of the Commission members, and they concur with this situation. Other than the above noted items, everything in the Developer's Agreement is consistent with the Feasibility Study. Some off site street improvements in and around the Jackson Avenue and School Street intersection are the City's financial responsibility. These expenses were outlined in the Feasibility Study. The City money for these improvements will come from state turnback funds. The security from the developer for these public improvements are outlined in the Developer's Agreement and are based on our understanding of how these type of projects are handled in similar communities. RECOMMENDATION Staff recommends approval of the Developer's Agreement as presented by the City Attorney. FROM LRRKIN HOFFMRN DRLV LINDGREN 612-8963265 04.18.1994 15: 21 P. 2 e e e MEMQRANDUM TO: FROM: DATE: LARKIN, HOFFMAN, DALY" LINDGREN, LTD. Auome)'s at Law 1500 Norwest Pinanclal Center 7900 Xerxes Avenuo South Bloomington, Minnesota 55431 Te1epnone: (612) 835-3800 PAX: (612) 896-3333 Mayor Henry A. Duitsman and Council Members Peter K. Beck, City Attorney April 18, 1994 Elk Park Center: Executive Summary of Developers Agreement and Planned Unit Development Agreement RE: This memorandum is an executive summary of the draft Elk Park Center Developers and PUD Agreements, to assist you in your review of these documents. Negotiations with Kraus Anderson on these documents are continuing and there will be some changes before Thursday. I will update the Council on those changes at the City Council meeting. I will be at the Council Meeting on Thursday to answer any questions, but would be happy to answer your questions during the week also, either at the office (896-3220) or at home (929-8877). Developers Agreement o Requires the Developer to install and pay directly for all Improvements located on the lots within the PUD, including grading, stormwater drainage, sanitary sewer and water lines, driveways, parking areas and landscaping. The Developer will also rough grade the public streets within the PUD. o Requires that the Developer Installed Improvements be done before certificates of occupancy will be issued, unless they cannot be fully completed due to weather conditions (for instance, landscape p1antings). In this case, the City Engineer can approve the issuance of a certificate of occupancy provided the conditions listed on page 4 are met. Requires the City to install all public streets within the PUD and all stormwater drainage, sanitary sewer, and water lines to be located within public rights-of-way. The City will also install the storm drainage line to be constructed across School Board property from the pond to School Street. o FROM LRRKIN HOFFMRN DRLY LINDGREN 612-8963265 04.18.1994 15: 21 P. 3 e e . o Provides that the City will also install necessary street improvements outside of the PUD ("Off-Site Improvements"), including the extension of Freeport Avenue through the School Board property and the improvements to Highway 169, School Street and Jackson Avenue. o Requires the Developer to pay: o For all Improvements within the PUD For Off-Site Street Improvements as shown on page 8 For trunk facilities and lateral benefit at normal City rates o o o The City's costs to be repaid by the Developer will be assessed to the lots within the PUD on a square footage basis and paid back: o o Over a ten year period for the shopping center itself Over a five year period for the other lots in the PUD Assessments on the Target property will be paid upfront Requires the Developer to provide security for paYment of the City's costs as follows: o o o During the construction period Developer will post a letter of credit in the amount of $2,600,000, which is the current estimate of the amounts to be assessed to Developer. This letter of credit will be released when certificates of occupancy are issued for sot of the shopping center and Developer has provided a guarantee for paYment of the assessments. A second element of security is the guarantee to be provided by the Developer's parent company, Kraus Anderson Incorporated. This guarantee will remain in effect until all assessments are paid, but may be reduced from time to time to the amount of the then outstanding assessments. Developer is required to combine the lot which contains the pond with the lot on which its sign will be located, to ensure that the pond does not go tax forfeit. o o o Developer is required to install street lights as directed by Elk River Municipal Utilities. All other conditions of the City Council's resolution approving a Conditional Use Permit for the PUD are incorporated into the Developers Agreement. o 2. FROM LRRKIN HOFFMRN DRLY LINDGREN 612-8963265 04.18.1994 15: 22 P. 4 Planned Unit Development Agreement It o Requires the Developer to develop the PUD in accordance with the plans approved by the City Council. Identifies the permitted and conditional uses within the PUD. o o Requires site plan review and approval for each building to be constructed within the PUD, and anytime a building is expanded or remodeled on the exterior, or a site plan is revised. o Requires that common areas be maintained and subject to reciprocal parking and access easements. Incorporates the conditions set forth in the City Council'S resolution approving the Conditional Use Permit for the PUD. o The intent of these documents is to put into contractual language the conditions which the Council established for the development of this PUD in its resolution approving the Conditional Use Permit for the PUD. If these contracts are approved by the City Council, they will be finalized, executed and recorded before construction proceeds on the shopping center. ~ Please feel free to call me if you do have any questions. . 3. PKB:IX8s ., . UtJELOPClZ1i. A-ci,.e~~MW 7 A-Ut. S~0) f1) iJ 1(u 7t t-f. ~, IfJ1PlLaV~~~.r 'ist:fi,J~z~ ...u ~ --iJ l)~ lfe<...otptijL. z..) KiS ID'UJ-rf ,___ 3.) SC~-.D.J~~lC. '7 '--' __iJ Celt' of' _~___.__.._.~_.___<__.~____._.___._--_~.____~.~"___"~"._~_..~'_"_~n_'.',',__,_~_'_____ ____.__m~-2N "~to&-f_~~____t.-_Q~.':6.,f~ 1'~_ oJ~_~~___~(( L___~__,_S'?1'("9 !..--.-~------ (\h f'vlt-lt.M.L- c..<...i n (-v'lt ..IN"1/ L (I\J "EJ.i7~ c.--.I' (.~?'f . ._-~_...--._-"-----------_.._-------_._.-..._._-.~,-_.,.---'"'"....,,-_._-~--->._~._~,--_.__._._---------_._---'-------..-.--"--'---'" - " .......... __.__J.)__t~~.__~~~ _,____~LL.__m.._n____n.____m_ .--.---------- _."~_~__'._.n.___________..'_.___,._._..___'____._._ ___._,.____,._____..,__._..._'__'...m.___.u_.____~._.__.-_._--".,_._..~._,._...._.- ,'",,, .....-.-.,-.---..-.- '.., .. .. . _,,___.........___._...._._.__(YjA:!J-t/I!tI,JfJ) ......__.~_f....'1~L._._...__n_.____..______..________.._,.__..---...... ,_~,_.~~..~.,_,__.__...__.~.._.__._._____~_.~_______~_,__~..___._v__,_...._.____.._.____..__~"_.._.._.~._.n~_....".-.-_____._,,_.__.._____.__.___.._~ __...____.......________.,~)._-WArf.~~L~lt{d.q.-.--.------._.._.____________,____.__..___ ""._.,.._"~_'.___.._._....,.,,,___."" 'T_..~.."~._,_~_____~..__~______._____"._.~____~__.,,,.~....~.___.__.."._.__.__~_.__.__~___.~,.._..~.__.~____________ ,,_._...,_~...~.._~_.._.___"_.._n.___._., . ___.__.______~ L{~I( ..,.,J~_____.______.____ .. _____._.<E~L NQ___l:3l:Li~/ZLLS~/!J~}l1._~Ls;~'YJ___._~J J:te;q-.. .J_-.AJ.L-l_f~",Xi:.~I~~-_ .-.~=_~!)cf~.- ==~~~==~;~=.~tf!Gy.=..==-_===_=..== .--- .----- -- .:_==_-. P1)-<i:v~~ -=~~==~~==-- . it) btivl4-?'~ ;!?Q)cS:?'/ZtM W...q l-Kw4:Y /1 ) ~ Ij/L( tA-A..{) kOo{.. /d4Ll . o v'i:A.. /6~