Loading...
11.0. SR 04-21-1994 .MS ~ CONSULTING &~G1NEERS ClVf1 ENGINEERING: ENVIRONMENTAl MUNICIPAl PlANNING STRUCTURAl e SURVEYING TRAFFIC TRANSPORTATION 1326 Energy Pork Drive St. Paul, MN 55108 612-644-4389 Fox: 612-644-9446 69800 Shelard Parkway . Minneapolis, MN 55441 612-546-0432 Fox: 612-544-6398 ITEM 11. April 18, 1994 File: 230-215-20 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: ELK PARK CENTER AREA TRUNK SANITARY SEWER AND WATER Dear Council Members: We have tabulated the bids opened on Wednesday, April 13, 1994, at 10:00 a.m. for the Elk Park Center Area Trunk Sanitary Sewer and Water Improvements. There were a total of 13 bids received. The following table lists each of the bidders and their total bid: Arcon Construction S. R. Weidema, Inc. Barbarossa & Sons Kadlex Excavating, Inc. LaTour Construction R. L. Larson Excavating Richard Knutson, Inc. Bonine Excavating S. J. Louis Construction Brown & Cns, Inc. Kenko, Inc. Lametti & Sons, Inc. Northdale Construction, Inc. $510,897.71 517,267.63 549,290.00 553,393.25 553,696.95 584,946.80 599,963.40 603,580.51 614,377.58 617,122.20 632,226.65 707,000.00 867,412.00 The feasibility study prepared in February 1994 for the Elk Park Center project estimated the construction cost for these trunk sanitary sewer and water improvements at $610,000.00. The low bid received from Arcon Construction is approximately 16% below this amount. Arcon Construction has previously completed similar projects. Most recently in the City of Elk River, they completed the Western Area Improvements, constructing trunk sanitary sewer and water out to the area of City Hall. . Honorable Mayor and City Council April 18, 1994 Page Two We would recommend award to Arcon Construction, Inc., in the amount of $510,897.71 as the lowest responsible bidder. Attached is a draft resolution for the City Council's consideration that authorizes the award and execution of a contract with Arcon Construction, Inc. Consideration of this resolution should be contingent upon the closing of the public hearing for these improvements and the approval of the Elk Park Center final plat, CUP, and developer's agreement. If you have any questions regarding this information, I will be in attendance at your special meeting on Thursday, April 21, 1994. Sincerely, MSA, CONSULTING ENGINEERS ~~ T~urer.~ e TJM:tp Attachment 21S-1701.apr e e RESOLUTION 94 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE NORTHEAST (ELK PARK CENTER) AREA TRUNK SANITARY SEWER AND WATER IMPROVEMENT OF 1994 WHEREAS pursuant to Resolution 94-22, competitive bids were solicited and received for the Northeast (Elk Park Center) Area Trunk Sanitary Sewer and Water Improvement as set forth in the bid tabulation attached hereto and incorporated herein by this reference; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined that Arcon Construction, Inc., is the lowest responsible bidder; e NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with Arcon Construction, Inc., as is approved by the City Attorney for the completion of the Northeast (Elk Park Center) Area Trunk Sanitary Sewer and Water Improvement according to the approved plans and specifications designated in Resolution 94-22. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract above specified. Passed and adopted this 21st day of April, 1994. Henry A. Deutsman, Mayor ATTEST: . Sandra A. Thackeray, City Clerk 215-1701.apr