5.5. SR 10-02-2006 City of Elk River REQUEST FOR COUNCIL ACTION Agenda Section Meeting Date En . eerin October 2, 2006 Item Description 181 st Avenue Watermain Extension - Bid Award Item Number 5.5. Introduction The 181 st Avenue (CSAH 12) watermain extension is an Elk River Municipal Utilities improvement to loop watermain from the existing Kliever Lake Fields area to the new watermain being put in with the CR 40 Improvement. The project is being coordinated through the City of Elk River for funding purposes. Discussion Plans were prepared under the direction of Bryan Adams, General Manager of Elk River Municipal Utilities. The project was bid on Wednesday, September 13, 2006. There were a total of 6 bidders. Attached is a bid tabulation. The following table shows the 6 bidders and their total bid: Bid Amount $256,034.17 $257,975.50 $258,730.00 an $294,545.00 $305,134.82 $323,354.00 The engineer's estimate for the construction was $235,000. The low bid is approximately 9 percent over the engineer's estimate. Since this bid is for directional boring of the watermain pipe, we do not have direct experience with the low bidder of Ellingson Drainage, Inc. We have received a list of references and have verified that they have successfully completed similar type projects in other communities. Bryan Adams has been made aware of the bid results and concurs with awarding the contract to Ellingson Drainage, Inc. Therefore, we would recommend the City Council award the bid for the 181st Avenue Watermain Extension Project to Ellingson Drainage, Inc. in the amount of $256,034.17. Financial Impact The City will be funding this improvement and recovering their investment through future trunk assessments. Attachments · Bid Tabulation . Resolution No. 06-_ Accepting the Bid and Authorizing Execution of the Contract for the 181st Avenue Watermain Improvement Project Action Requested The City Council is asked to consider a resolution accepting the bid and authorizing execution of the contract for this project. Council Action Motion by _ Second by _ Vote Follow Up cc: Bryan Adams, Elk River Municipal Utilities S:\EngineerImprovProj\2006 Improvement Projects\181st Ave Watermain Extension\10 02 06 CCmemo.doc $12,000.00 $11,000.00 $11,000.00 $10,200.00 $213,775.50 $257,975.50 $12,000.00 $5,500.00 $5,500.00 $5,100.00 $79.50 $11,478.73 $14,256.62 $17,303.28 $11,320.54 $201,675.00 $256.034.17 BID TABULATION 181ST AVENUE W ATERMAIN EXTENSION SCHEDULE 1.0 . 181ST AVENUE WATERMAIN 1 2021.501 MOBILIZATION LS 1.00 $11,478.73 2 2504.602 INSTALL HYDRANT AND VALVE EA 2.00 $7,128.31 3 2504.602 CONNECT TO EXISTING WATERMAIN EA 2.00 $8,651.64 4 2504.602 16" BUTTERFLY VALVE EA 2.00 $5,660.27 5 2504.603 DIRECTIONAL DRILL 16" HDPE (DIPS) LF 2,689.00 $75.00 T BID SUMMARY. TOTAL Bid Tabulation-181st Ave Watermain Ext. September 13, 2006 $15,000.00 $10,93(}.00 $8,928.00 $9,610.00 $250,077.00 $294,545.00 2 BID TABULATION 181ST AVENUE W ATERMAIN EXTENSION SCHEDULE 1.0 . 181ST AVENUE WATERMAIN 1 2021.501 MOBILIZATION LS 1.00 $2,000.00 $2,000.00 $15,000.00 2 2504.602 INSTALL HYDRANT AND VALVE EA 2.00 $6,386.00 $12,772.00 $5,465.00 3 2504.602 CONNECT TO EXISTING WATERMAIN EA 2.00 $4,459.00 $8,918.00 $4,464.00 4 2504.60216" BUTTERFLY VALVE EA 2.00 $7,271.00 $14,542.00 $4,805.00 5 2504.603 DIRECTIONAL DRILL 16" HDPE (DIPS) LF 2,689.00 $82.00 $220,498.00 $93.00 T BID SUMMARY - TOTAL $258,730.00 Bid Tabulation-18Ist Ave Watermain Ext. September 13, 2006 BID TABULATION 181ST AVENUE W ATERMAIN EXTENSION SCHEDULE 1.0 . 181ST AVENUE WATERMAn'.. 1 2021.501 MOBILIZATION LS 1.00 $2,500.00 $2,500.00 $11,000.00 $11,000.00 2 2504.602 INSTALL HYDRANT AND VALVE EA 2.00 $5,501.00 $11,002.00 $5,420.00 $10,840.00 3 2504.602 CONNECT TO EXISTING WATERMAIN EA 2.00 $4,700.00 $9,400.00 $3,700.00 $7,400.00 4 2504.602 16" BUTTERFLY VALVE EA 2.00 $7,500.00 $15,000.00 $4,540.00 $9,080.00 5 2504.603 DIRECTIONAL DRILL 16" HDPE (DIPS) LF 2,689.00 $99.38 $267,232.82 $106.00 $285,034.00 T BID SUMMARY - TOTAL $305,134.82 $323,354.00 == = I HEREBY CERTIFY THAT TIllS IS AN ACCURATE TABULATION OF THE BIDS RECEIVED FOR THE ABOVE MENTIONED PROJECT. - NAME: Terry Maurer, City Engineer DATE: September 13,2006 MN REG NO.: 15316 Bid Tabulation-l 81st Ave Watermain Ext. September 13,2006 3 RESOLUTION 06- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE 181stAVENUE WATERMAIN EXTENSION IMPROVEMENT OF 2006 WHEREAS pursuant to a City Council direction, competitive bids were solicited and received for the 181st Avenue Watermain Extension; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined that Ellingson Drainage, Inc. is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with Ellingson Drainage, Inc., as is approved by the City Attorney, for the completion of the 181 st Avenue Watermain Extension according to the approved plans and specifications. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract specified above. Passed and adopted this 2nd day of October, 2006. Stephanie A. Klinzing, Mayor A1TEST: Joan M. Schmidt, City aerk S:\EngineerImprovProj\2006 Improvement Projects \ 181st Ave Watermain Extension \Resolution Accept bid authorize contract.doc