Consider Contribution far Library Project
Introduction
Callncilillelnber Ivlotin fOl\\larded to tlle city an offer froln Econar to contribute geotllermal pumps to
tlle library project. TIle City Council has asked staff to e"valuate the 'Tiability of accepting dus offer frotn
Econar.
Discussion
During tlle past \veek staff Ilas been \varking \vidl Jennifer ,[\nderson- Tutde, I<l<E _A.rchitects, project
lnecIlanical engineers from I<FI, and Econar to \vark tl1tOUgll tlle details of tlle proposed donation. On
TIlursday, October 5, I<I<E receiv'ed specifications froln Econar on dle pmnps it proposes to donate.
TIle arclutects and lnecIlanical engineers are no"\v \'7orking on re\Tie\ving the information pro\Tided and
requesting additional information as needed. Jennifer _A..nderson-Tuttle does not belie'Te dle mecl1anical
engineers \vill be able to complete tlleir re\Tie\v until sOlnetime next \veek because tllere are questions tllat
require additional inforlnation frolTI and discussions \vitll Econar. Please see tlle attaclled email from rv1s.
Tuttle.
For tllat reason, tIllS item may need to be delayed until October 16. That delay \v~ill not preclude tile city
from accepting Econar's offer. It \vill, 110\Ve"V"er, allo\v time to address design and specification questions.
Representatives froln I<I<E and I<FI \vill be at I\'1onday's meeting only if tlle revie\\i is complete. If tlle
Council \vants tlleln present on Nlonday ev'en if tlle e\Taluation is not cOlnplete.. please let me kno"\v as
soon as possible. TIley \vill be at tile October 16 meeting if dlls iteln is delayed.
Action Requested
If tlle evaluation inforlnation is a\Tailable for lvlonday's meeting, Council is asked to consider the donation
froln Econar follo\ving input from tlle arclutects on design and tlle city attorney on tlle bidding process.
If the information is not a\Tailable on rvIonday, tllls iteln sllould be delayed until October 16.
Council Action
J\Iotion by
Second by
\eTote
Follow Up
s: \ Council \Lori \ 2006 \Library Econar Donation.doc
Johnson, Lori
From:
Sent:
To:
Cc:
Subject:
Jennifer Anderson-Tuttle [JTUTTLE@kke.com]
Thursday, October 05, 2006 2:26 PM
Johnson, Lori
Maertz, Bill; cdnelson@kfi-eng.com; rpchristenson@kfi-eng.com; Mohammed Lawal
Fwd: Elk River Library (Request for additional information)
Attachments:
061005 23 81 21 - Water To Water Heat Pumps.pdf
'm'W'~~>
Z:':_;,,::'
,>"~:k
061005 23 81 21 -
Water To Wat...
Lori,
As per our earlier conversation, I am writing you to request we be moved to the council
agenda on the 16th of October. We have just received information from Econar a few hours
ago. Our engineers with Karges-Faulconbridge, Inc. are currently reviewing the
information. They have already developed a partial list of questions that are unanswered
with the information sent. See the following list or requested inrormation:
1. Was the selection based on 30% propylene glycol?
2. Please provide equipment efficiency (COP & EER) data.
3. What warranties are standard?
4. What controls come with heat pumps?
5. Please provide standard ARI selections?
I have also attached the mechanical specifications.
This is not a complete review. A more comprehensive list will be developed in the next
few days. It is my belief that it is unlikely that we will know if the proposed system
meets the criteria established for the Library by the proposed council meeting on October
9th. The deadline for substitution request, as stated in the AlA A701 Instruction to
Bidders has also passed, and the last addendum has been issued. Which means that at this
point the best way to deal with this issue will be in the rorm of a change order, should
the product prove to be acceptable, once a General Contractor has been awarded the
contract. I would propose we reschedule the meeting with Council to the October 16th
meeting when our engineers have had adequate time to review information and Econar has
also had adequate time to provide the missing information.
Our commitment is to you and to providing a high quality building and systems that we have
both confidence and a successful history with.
Thank you for respecting our professional commitment,
Jennifer Anderson-Tuttle, Associate
KKE Architects, Inc.
612-596-4860 direct