Loading...
8.7. SR 05-02-1994 ~ ~ _ MS'l COlS[LTI~G R~mEEltS CIVil ENGINEERING: ENVIRONMENTAL MUNICIPAL PLANNING STRUCTURAL _ SURVEYING TRAFFIC TRANSPORT A nON 1326 Energy Pork Drive 51. Paul, MN 55108 612-644-4389 Fox: 612-644-9446 9800 Shelard Parkway _MinneapoliS, MN 55441 612-546-0432 Fax: 612-544-6398 AGENDA ITEM 8.7 April 27, 1994 File: 230-219-10 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: PETERSON ADDITION/GREENHEAD ACRES 2ND ADDmON BITUMINOUS OVERLAY Dear Mr. Klaers: As directed by the City Council, we have prepared the attached feasibility study for the bituminous overIayment of the existing streets in the Peterson Addition and the Greenhead Acres 2nd Addition. As you are aware, this was a project initiated by the City Council based upon the recommendation of Phil Hals, the City Street Superintendent. The proposed improvement consists of providing a bituminous overIayment of the existing streets within .these two developments. According to the City's assessment policy, the entire cost is proposed to be assessed against the benefitting properties on a per lot basis. The estimated assessment rate is $1,557 per lot. In order to proceed with this project, the City Council would need to consider the attached resolution which accepts the feasibility study and orders the public hearing. Since this project was initiated by the City Cou.ncil an~ not by petition of the affected property owners, the attached resolution requires a 4/5 vote for the project to proceed. We have tentatively scheduled the public hearing for the June 6, 1994, City Council meeting. If you have any questions regarding this information, please call. Sincerely, MSA, CONSULTING ENGINEERS T5~~ TJM:tp Attachment 219-2703.apr RESOLUTION 94 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC HEARING ON THE IMPROVEMENT IN THE MA TIER OF THE BITUMINOUS OVERLAY IMPROVEMENT OF 1994 WHEREAS the Feasibility Report ordered by the Council in Resolution 94-17 has been prepared with reference to the Bituminous Overlay Improvement of 1994 and was received by the City on May 2, 1994; and WHEREAS the Feasibility Report recommends that the proposed improvement is feasible; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The City Council will consider the Bituminous Overlay improvement as described in the Feasibility Report and the assessment of the property abutting this proposed improvement for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Section 429 at an estimated total cost for the improvement of $85,700. 2. A public hearing shall be held before the City Council on the proposed improvement on the 6th day of June, 1994, at 7:00 o'clock p.m. at Elk River City Hall. 3. The City Administrator shall provide two published notices (one week apart) in the official newspaper with at least three days between the last publication date and the hearing, and mailed notice ten days prior to the hearing as required by law. Passed and adopted this 2nd day of May, 1994. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk 219-2703.apr ,. I., e e e e e e , , " FEASIBILITY STUDY FOR PETERSON ADDmON AND GREENHEAD ACRES 2ND ADDmON BITUMINOUS OVERLAY I hereby certify that this Feasibility Study was written by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Minnesota. I~I ;Pi ~~p.w.a<) Terry J. Mau , P .E. Reg. No. 15316 FEAS-230.219 Date Prepared for City of Elk River File No. 230-219-10 e INTRODUCTION On February 28th, 1994, the Elk River City Council, adopted Resolution 94-17 authorizing a feasibility study to analyze proposed bituminous overlayment of selected city streets. The streets included in this recommendation are found in the Peterson Addition and the Greenhead Acres 2nd Addition. The streets recommended for improvements within the Peterson Addition are: Ogden Street, 196th Avenue, and Queen Street shown in Exhibit 1. Proposed street improvements within the Greenhead Acres 2nd Addition are: York Street, 208th Avenue, and Watson Street shown in Exhibit 2. These street improvements were initiated based on a recommendation from Phil Hals, Street Supervisor, in which he noted "significant signs of deterioration" as the reason for the improvements. It is the City's opinion that it is not economically feasible to continue patching these streets and that a bituminous overlay would be more economical than total reconstruction. e EXISTING CONDmONS The streets involved with this feasibility study are between 14 and 16 years old. They show significant signs of wear, such as cracks and pot holes, and required significant amount of repairs in recent years. PROPOSED IMPROVEMENTS The proposed improvements consist of a two inch bituminous overlay on the existing streets shown in Exhibit 1 and 2. It is recommended that a 2-inch bituminous overlay be placed to add structural strength, provide a smooth driving surface, and prolong the life of the existing streets. If these improvements are not implemented soon, the City's only alternative will be total reconstruction. COST The following table outlines the cost of the proposed improvements. The city's Assessment Manual has established the estimated overhead to 28% of the total construction costs. Because there is a e limited amount of preliminary and administrative work associated with an overlay project, the estimated overhead cost has been reduced to 10 % of the construction costs. FEAS-230.219 e there is a limited amount of preliminary and administrative work associated with an overlay project, the estimated overhead cost has been reduced to 10 % of the construction costs. Table 1. Estimated Project Cost Peterson Addition Estimated Construction Cost $ 41,380.00 Engineering, Administration Fiscal and Legal costs ( 10 % ) 4, BR 00 $ 45,518.00 Greenhead Acres 2nd Addition Estimated Construction Cost $ 36,465.00 Engineering, Administration, Fiscal and Legal costs (10%) 1,04n 00 $ 40,111.00 e TOTAL ESTIMATED PROJECT COST $ 85,629.00.00 FINANCING In accordance with the Elk River city's Assessment Manual, the cost of a bituminous overlay will be assessed on a lot unit basis, to the benefiting properties. Therefore, the costs of the improvements would be divided equally among all of the adjoining properties. In the Peterson Addition, there are 29 properties that would benefit from the proposed improvements. These properties would each be assessed $1,570.00 per unit. In the Greenhead Acres 2nd Addition, 26 parcels would be assessed $1,543.00 per unit. Since there is only a 1.7 percent difference in the costs of the two projects, it may be beneficial to combine the costs and assess each property owner $1,557.00. It is difficult to predict with exact accuracy the amount of material each street will require, and since this overlay project involves two different areas in the city, it may impossible to separate the cost of each street's improvements, depending on the Contractor's method. e Assessing each of the properties the same amount for the same improvement is likely to be the most equitable method. FEAS-230.219 e e e PROJECT SCHEDULE Item Receive Feasibility Study Hold Public Hearing Order Project and Plans Approve Plans and Specifications Receive Bids / Set Assessment Hearing Hold Assessment Hearing / A ward Contract Begin Construction Complete Project First Payment on Real Estate Taxes Date May 2, 1994 June 6, 1994 June 6, 1994 June 20, 1994 July 5, 1994 August 1, 1994 August 1994 September 1994 1995 CONCLUSION The proposed overlay project would increase the strength and life of the existing streets in the Peterson and Greenhead Acres 2nd Additions. The estimated cost of the project is $85,629.00, with each benefitting parcel being assessed $1,577.00. This project is feasible from ari engineering standpoint and will benefit the properties proposed to fund them. FEAS-230.219 e e s .' COKSULTlKC DCImIS I lIBJIi.- ---rr--- I I I PETERSON ADDITION I I I ~ PROPOSED OVERLAY~PROVEMENTS ~i:[lXlu~nir · ver ~ ... ... " .Ii, e . MS COKSULTIRC DCImIS ~ GREENHEAD 2ND ADDITION IR!1!>f<<IlIl INI I'QG ac PROPOSED OVERLAY IMPROVEMENTS ~~[}:{JD~OiI ~