Loading...
8.8. SR 05-02-1994 r\.! ~\ ( ;; Ilk River Agenda Item 8.8 MEMORANDUM TO: MAYOR & CITY COUNCIL FROM: PAT KLAERS, CITY ADMINISTRATOR DATE: APRIL 27, 1994 SUBJECT: COUNTY ROAD 12/13 DRAINAGE Work is continuing on the County Road 12/13 drainage improvement project. Attached for your review is some background material from our City engineering firm regarding this project. Consistent with City Council discussions, this project has been incorporated into the spring, 1994 bond issue. The estimated cost for this project is in the $400,000 range. e This project is somewhat related to the Highway 169/10 culvert project that the Council authorized a month ago. This Highway 169/10 project was estimated in the $413,000 range and is also included in the spring, 1994 bond issue. The Council should note that the actual bid approved by MnDOT was $490,000. In addition to these two projects, the City will also have to upgrade the culvert at the railroad crossing area. This project will be required due to the Earl Hohlen commercial development proposal as storm water associated with this project will have a dramatic effect on the drainage and storm water flow in this vicinity. If the City Council desires to move forward with this County Road 12/13 project, then approval of the attached resolution should take place. e P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 . MSJ - AGENDA ITEM #8.8 CONSULTING ENGINEERS April 21, 1994 File: 230-211-20 CIVil ENGINEERING: ENVIRONMENTAl MUNICIPAl PlANNING STRUCTURAl -SURVEYING TRAFFIC TRANSPORTATION 1326 Energy Park Drive 51. Paul, MN 55108 612-644-4389 Fax: 612-644-9446 _9800 Shelard Parkway Minneapolis, MN 55441 612-546-0432 Fax: 612-544-6398 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: COUNTY ROAD 12/13 DRAINAGE IMPROVEMENT PROJECT Dear Councilmembers: As directed by Resolution 94-11, dated February 7, 1994, MSA, Consulting Engineers has prepared plans and specifications for the County Road 12/13 Drainage Improvement Project. The project will alleviate flooding problems along 5th Street, west of County Road 13, and also eliminate the flooding problem on the Demars property south of 5th Street and west of County Road 13. The project also includes a new drainage pipe from the wetland area north of County Road 12 to County Ditch No. 10. Once the design.was finalized, we staked the alignment of the proposed storm sewer through the affected properties east of County Road 13 and north of County Road 12. We met with the affected property owners, including George Deschenes, Industrial Hardfacing, Ronald Guenther, and also Weldon Schultze. Enclosed are copies of letters they signed, indicating their concurrence with the proposed easements, and their willingness to provide these easements at no cost to the City of Elk River. Easement descriptions have been prepared for each of the above listed property owners, and easement documents could easily be prepared by the City attorney should the City Council want to proceed with the project. We are continuing to coordinate the project with Sherburne County and the U.S. Army Corps of Engineers. The Corps of Engineers has jurisdiction over the wetlands, while Sherburne County has jurisdiction over the County Road right-of-way, and also the County Ditch. Enclosed for your consideration is a resolution which approves the plans and specifications and authorizes the advertisement for bids for the County Road 12/13 Drainage Improvements. Sincerely, MSA, CONSULTING ENGINEERS y~ <C. ;1~ David E. Nyberg Staff Engineer Enclosures 211-2101.apr RESOLUTION 94- e A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND ORDERING THE ADVERTISEMENT FOR BIDS IN THE MATTER OF THE COUNTY ROAD 12/13 DRAINAGE IMPROVEMENT OF 1994 WHEREAS pursuant to Resolution 94-11, the Project Engineer has prepared plans and specifications for the County Road 12/13 Drainage Improvement of 1994, which plans and specifications have been reviewed by the City; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. Such plans and specifications, a copy of which is attached hereto and incorporated herein by this reference, are hereby approved. 2. The City Administrator shall prepare and obtain the publication of an advertisement for bids for the making of the improvement pursuant to the attached plans and specifications. The advertisement shall be published once each week for three consecutive weeks, shall specify the work to be done, and shall state that the bids will be received by the City Administrator until on , 1994, at which time the bids will be publicly opened in the Council chambers of the City Hall by the City Administrator and the Project Engineer and will then be tabulated for consideration by the City Council at a meeting thereof at o'clock -p.m. on , 1994, in the City Council chambers at City Hall. No bids will be considered unless sealed and fIled with the City Administrator and accompanied by a cash deposit, cashier's check, bid bond, or certified check payable to the City Administrator in the amount of 5 % of the amount of such bid. e Passed and adopted this _ day of ,19_. Henry A. Duitsman, Mayor ATTEST: e Sandra A. Thackeray, City Clerk 21l-2101.apr AGENDA ITEM 118.8 .MS CONSULTING ENGINEERS April 21, 1994 File: 230-211-20 CIVil ENGINEERING: ENVIRONMENTAL MUNICIPAL PlANNING STRUCTURAl e SURVEYING TRAFFIC TRANSPORTATION 1326 Energy Park Drive St. Paul, MN 55108 612-644-.4389 Fax: 612-644-9.4.46 .9800 Shelard Parkway Minneapolis, MN 55.4.41 612-5.46-0.432 Fax: 612-544-6398 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: COUNTY ROAD 12/13 DRAINAGE IMPROVEMENT PROJECT Dear Councilmembers: As directed by Resolution 94-11, dated February 7, 1994, MSA, Consulting Engineers has prepared plans and specifications for the County Road 12/13 Drainage Improvement Project. The project will alleviate flooding problems along 5th Street, west of County Road 13, and also eliminate the flooding problem on the Demars property south of 5th Street and west of County Road 13. The project also includes a new drainage pipe from the wetland area north of County Road 12 to County Ditch No. 10. Once the design was finalized, we staked the alignment of the proposed storm sewer through the affected properties east of County Road 13 and north of County Road 12. We met with the affected property owners, including George Deschenes, Industrial Hardfacing, Ronald Guenther, and also Weldon Schultze. Enclosed are copies of letters they signed, indicating their concurrence with the proposed easements, and their willingness to provide these easements at no cost to the City of Elk River. Easement descriptions have been prepared for each of the above listed property owners, and easement documents could easily be prepared by the City attorney should the City Council want to proceed with the proiect. We are continuing to coordinate the project with Sherburne County and the u.S. Army Corps of Engineers. The Corps of Engineers has jurisdiction over the wetlands, while Sherburne County has jurisdiction over the County Road right-of-way, and also the County Ditch. Enclosed for your consideration is a resolution which approves the plans and specifications and authorizes the advertisement for bids for the County Road 12/13 Drainage Improvements. Sincerely, MSA, CONSULTING ENGINEERS y~ 'C. ;1~ David E. Nyberg Staff Engineer Enclosures 211-2101.apr MS, ~ CONSUmG ENGINEERS CIVIL ENGINEERING ENVIRONMENTAL MUNiCiPAl PL4NNING STRUCTURAl .SURVEYiNG TRAFFiC TRANSPORT A nON 1326 Energy Park Drive SI. Paul, MN 55108 612.64.4-4389 Fax: 612-644-9446 .9800 Shelarc! Parkway CC: Minneapolis, MN 55441 612.546.0432 Fax: 612.544.6398 April 8, 1994 File: 230-211-20 Mr. George Deschenes 18513 Twin Lakes Road Elk River, MN 55330 RE: EASEMENTS FOR STORM DRAINAGE PROJECT Dear Mr. Deschenes: Thank you for taking the time to meet with us on Friday, April 1, to discuss and review the proposed storm drainage easement and temporary construction easement along the south and side of your property. Attached is a legal description of the proposed easement we discussed, along with a drawing showing the permanent easement in yellow and the temporary construction easement in red. As we indicated during our meeting, the City of Elk River is requesting the proposed easement free of charge, in exchange for proceeding with the project with no assessments to the adjacent property owners. The plans for this project are essentially complete. We hope to present the plans to the City Council by early May, along with the consent of all property owners to give the necessary easements. If you are agreeable to executing the actual easement document once the City has authorized proceeding with the construction of the storm sewer improvements, please indicate your agreement by signing a copy of this letter and returning it to me in the enclosed self-addressed stamped envelope by Friday, April 15, 1994. Please do not hesitate to call me if you have any questions about the proposed project or the easements. Thank you for your cooperation. Sincerely, MSA, CONSULTING ENGINEERS /~"'( ~ I!~~ David E. Nyberg r'" (/" Staff Engineer ~~~f{~P' George Deschenes Date Enclosures Mr. Pat Klaers, City Administrator 211-0804.apr .MS D1N8lIL11I__ CML ENGlNEEilNG: ENVIRONMENTAL MUNICIPAL PLANNING STRUCTURAL .URVEYING TRAFFIC TRANSPORTATION 1326 Energy Park DrWe St. Paul, MN 55108 612-644-4389 Fax: 612-644-9446 eaoo SheIard ~ MinroeqlOtlS, MN 55441 612-~ Fax: 612.544-6398 23u - 2 ( (~ZD April 8, 1994 File: 230-211-20 Industrial Hardfacing Atb1: Mr. Ken Warneke P.O. Box 303 Elk River, MN 55330 RE: EASEMENTS FOR STORM DRAINAGE PROJECT Dear Mr. Warneke: Thank you for taking the time to meet with us on Friday, April 1 , and again on Monday, April 11, to discuss and review the proposed storm drainage easement and temporary construction easement along the south and north side of your property. Attached is a legal description of the proposed easement we discussed, along with a drawing showing the permanent easement in yellow and the temporary construction easement in red. As we indicated during our meeting, the City of Elk River is requesting the proposed easement free of charge, in exchange for proceeding with the project with no assessments to the adjacent property owners. The plans for this project are essentially complete. We hope to present the plans to the City Council by early May, along with the consent of all property owners to give the necessary easements. If you are agreeable to executing the actual easement document once the City has authorized proceeding with the construction of the storm sewer improvements, please indicate your agreement by signing a copy of this letter and returning it to me in the enclosed self-addressed stamped envelope by Friday, April 15, 1994. Please do not hesitate to call me if you have any questions about the proposed project or the easements. Thank you for your cooperation. Sincerely, MSA, CONSULTING ENGINEERS JJ~ y, /f~ David E. Nyberg Staff Engineer ~U-L f/tl/?f Ken warneki-r~te Enclosures cc: Mr. Pat Klaers, City Administrator 211-0804.apr MS CONSULTING ENGINEERS CIVil ENGINEERING ENVIRONMENTAl MUNICIPAl PLANNING STRUCTURAl .URVEYING TRAFFIC TRANSPORTATION 1326 Energy Park Drive 51. Paul, MN 55108 612-644-4389 Fax: 612-644-9446 e800 Shefard Parkway Minneapolis, MN 55441 612-546-D432 Fax: 612-544-6398 April 8, 1994 File: 230-211-20 Mr. Weldon Schulze 10743 - 181st Avenue NW Elk River, MN 55330 RE: EASEMENTS FOR STORM DRAINAGE PROJECT Dear Mr. Schulze: Thank you for taking the time to meet with us on Friday, April 1, to discuss and review the proposed storm drainage easement and temporary construction easement along the west side of your property north of County Road 12. Attached is a legal description of the proposed easement we discussed, along with a drawing showing the permanent easement in yellow and the temporary construction easement in red. As we indicated during our meeting, the City of Elk River is requesting the proposed easement free of charge, in exchange for proceeding with the project with no assessments to the adjacent property owners. The plans for this project are essentially complete. We hope to present the plans to the City Council by early May, along with the consent of all property owners to give the necessary easements. If you are agreeable to executing the actual easement document once the City has authorized proceeding with the construction of the storm sewer improvements, please indicate your agreement by signing a copy of this letter and returning it to me in the enclosed self-addressed stamped envelope by Friday, April 15, 1994. Please do not hesitate to call me if you have any questions about the proposed project or the easements. Thank you for your cooperation. Sincerely, MSA, CONSULTING ENGINEERS :?~.;, 4~ David E. Nyberg Staff Engineer Enclosures cc: Mr. Pat Klaers, City Administrator 211-0804.apr .M~ ~Irtl, ;"rg fS' fRI 1 n . ., I 9 '9941Ii jJ "', U 1/ I JI ,'-.~~ ~ -..t ,.":::/ t,; :j: S~'~)yAAT &1r~'"l~';';;;'.Kr.. 't~~,_i t ~""--"""""} ~----... m~Slt'lUG IlNGI~mtS April 8, 1994 File: 230-211-20 Mr. Ronald Guenther 18461 Twin Lakes Road Elk River, MN 55330 C/VI1 ENGINEERING. RE: EASEMENTS FOR STORM DRAINAGE PROJECT Dear Mr. Guenther: EN\<ON'v1ENTAL PLANNING Thank you for taking the time to meet with me on Monday April 11 to discuss and review the proposed storm drainage easement and temporary construction easement along the north side of your property. Attached is a legal description of the proposed easement we discussed, along with a drawing showing the permanent easement in yellow and the . temporary construction easement in red. As we indicated during our meeting, the City of Elk River is requesting the proposed easement free of charge, in exchange for proceeding with the project with no assessments to the adjacent property owners. MUNICIPAL STRUCTURAL e SURVEYiNG TRAFFIC The plans for this project are essentially complete. We hope to present the plans to the City Council by early May, along with the consent of all property owners to give the necessary easements. If you are agreeable to executing the actual easement document once the City has authorized proceeding with the construction of the storm sewer improvements, please indicate your agreement by signing a copy of this letter and returning it to me in the enclosed self-addressed stamped envelope by Friday, April 15, 1994. TRANSPORTATION Please do not hesitate to call me if you have any questions about the proposed project or the easements. Thank you for your cooperation. Sincerely, MSA, CONSULTING ENGINEERS 1326 Energy pork Drive ~ {, /1 ~ St.Paul,MN55108 .--fA -, /' David E. Nyberg 612.64,4.4389 Staff E . ngmeer Fax: 612-64,4.94.46 (~/~~al~/ 1!s}7 R nald Guenther Date / Enclosures e9800 Shelard Parkway cc: Minneapolis, MN 55441 . 612-,S46M2 Mr. Pat Klaers, City Administrator Fax: 612.544-6398 "P ,_"vrt." ,....P