RES 06-116
.
.
.
RESOLUTION 06 J16
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION FOR THE CITY OF ELK RIVER
ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE
MATTER OF THE PAVEMENT MANAGEMENT STREET IMPROVEMENT OF 2007
WHEREAS the City has determined that it should consider improving certain property by reconstructing the
following streets:
Irving Avenue
5th Street
6th Street
7th Street
8th Street
5th Street
5 % Street
6th Street
7th Street
8th Street
Holt Avenue
Gates Avenue
Alleys
4th Street to School Street
Jackson Avenue to Irving Avenue
Jackson Avenue to Irving Avenue
Jackson Avenue to Irving Avenue
Jackson Avenue to Irving Avenue
Holt avenue to Gates Avenue
Irving Avenue to Gates Avenue
Irving Avenue to Gates Avenue
Irving Avenue to Gates Avenue
Holt Avenue to Gates Avenue
5th Street to School Street
5th Street to School Street
4th Street to School Street (between Jackson and Irving Avenues); and
WHEREAS
Council must fIrst secure a preliminary feasibility study in order to consider making the
improvement;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota:
This matter shall be referred to Terry J. Maurer, PE, City Engineer, who is requested to provide to the
City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and
whether the improvement should thus be made as proposed or in connection with some other
improvement and the estimated cost of the improvement as recommended.
Passed and adopted this 2nd day of October, 2006.
~a_~
C-St<pha< A Klinzm& ~yo .
ATTEST:
l!fl~
00-/ (/ ((/