Loading...
7.2. SR 05-31-1994 e Ms'~ CONSULTING ENGINEERS CIVil ENGINEERING: ENVIRONMENTAl MUNICIPAl PLANNING STRUCTURAl e SURVEYING TRAFFIC TRANSPORT A nON 1326 Energy Park Drive 51. Paul, MN 55108 612-644-4389 Fax: 612-644-9446 e 9800 Shelard Parkway Minneapolis, MN 55441 612-546-0432 Fax: 612-544-6398 . ITEM 7.2. May 26, 1994 File: 230-216-20 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: EXTERNAL/INTERNAL STREET IMPROVEMENTS ELK PARK CENTER Dear Council Members: We have tabulated the bids opened on Wednesday, May 18, 1994, at 10:00 a.m. for the internal and external street improvements associated with the Elk Park Center project. There were a total of six bids received. The following table lists each of the bidders and their total bid. Forest Lake Contracting, Inc. Bauerly Brothers, Inc. Buffalo Bituminous, Inc. Arcon Construction, Inc. Hardrives, Inc. Progressive Contractors, Inc. $1,673,873.71 1,781,699.61 1,799,808.78 1,900,896.83 1,942,929.42 1,934,746.67 The components of the improvements contained in this project are the reconstruction of School Street between Jackson Avenue and TH 169, the reconstruction of Jackson Avenue from School Street to TH 169, the construction of Freeport A venue from School Street to Jackson Avenue, the construction of 191st from Freeport Avenue to TH 169, the addition of a left turn lane on northbound TH 169 at School Street, the construction of acceleration and deceleration lanes on TH 169 at 191 st Avenue, the signalization of the School Street/ Jackson Avenue intersection, the signalization of the School Street/Freeport Avenue intersection, the modification to the School Street/TH 169 signal, and in addition, the turn lane on TH 10 at Oxford Avenue was also included in this project. The feasibility study prepared in February 1994 for the Elk Park Center project estimated the construction costs for these improvements at approximately $2.27 million. The low bid received from Forest Lake Contracting, Inc., is several hundred thousand dollars below this estimate. As you are aware, a portion of these improvements are to be 100% financed by the Developer and portions are to be partially funded by the Developer and partially by Municipal State Aid 230/216-2605.may e Honorable Mayor and City Council May 26, 1994 Page Two turnback funding. Until construction is complete and the actual cost of each segment is analyzed, it will be difficult to predict how much of the cost savings is attributable to the Developer's improvements and how much to the City's funded portion. Forest Lake Contracting, Inc., has previously completed similar type projects. However, none of these have been in the City of Elk River. Most recently, they have completed projects similar to this in northern Anoka County. We have also worked with them in the past in other client communities. We would recommend award to Forest Lake Contracting, Inc., in the amount of $1,673,873.71 as the lowest responsible bidder. Attached is a draft resolution for the City Council's consideration that authorizes the award and the execution of the contract with Forest Lake Contracting, Inc. MnDOT is still in the process of reviewing and approving the State Aid fundable portions of this project. Therefore, the award of the contract should be contingent upon MnDOT approval of the plan. If you have any questions regarding this, please call. Sincerely, e MSA, CONSULTING ENGINEERS ~~ T~urer,~ TJM:tw e 230/216-2605.may e RESOLUTION 94 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MA TIER OF THE SCHOOL STREET, JACKSON A VENUE, FREEPORT A VENUE, AND TH 169 AND TH 10 TURN LANES IMPROVEMENT OF 1994 WHEREAS pursuant to Resolution 94-22, competitive bids were solicited and received for the School Street, Jackson Avenue, Freeport Avenue, and TH 169 and TH 10 Turn Lanes improvement as set forth in the bid tabulation attached hereto and incorporated herein by this reference; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined that Forest Lake Contracting, Inc., is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: e 1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with Forest Lake Contracting, Inc., as is approved by the City Attorney for the completion of the School Street, Jackson Avenue, Freeport Avenue, and TII 169 and TH 10 Turn Lanes improvement according to the approved plans and specifications designated in Resolution 94-22. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract above specified. Passed and adopted this 31st day of May, 1994. Henry A. Duitsman, Mayor A TIEST: Sandra A. Thackeray, City Clerk e 230/216-2605.may