Loading...
5.3. SR 07-05-1994 **CONSENT ITEM 5.3.** . MS ~ June 27, 1994 CONS[)LTING ENGlNEEILS File: 230-216-20 CIVil ENGINEERING ENVIRONMENTAL MUNICIPAL PLANNING STRUCTURAL e SURVEYING TRAFFIC TRANSPORTATION 1326 Energy Pork Drive 51. Paul, MN 55108 612-644-4389 Fox: 612-644-9446 e 9800 5helard Parkway Minneapolis, MN 55441 612-546-0432 Fox: 612-544-6398 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: ELK PARK CENTER TRUNK SEWER AND WATER IMPROVEMENTS CHANGE ORDER NO. 1 Dear Mr. Klaers: Enclosed are three copies of Change Order No. 1 for the Arcon Construction contract on the trunk sanitary sewer and water improvements serving Elk Park Center. This change order relates to the jacking of the watermain and sanitary sewer under TH 169. At the time that the construction of the jacking was initiated, a substantial amount of large boulders were found in the area of the jacking pit. These raised the potential of blocking the casing from crossing underneath the highway. In order to deal with this concern, the size of the casings for the sanitary sewer and water were increased from 20 inches and 24 inches to 30 inches. A 30-inch casing allows the Contractor to send a man to the end of the casing to break up and remove any boulders that may be encountered during the jacking process. Any size smaller than 30 inches does not allow this type of operation. Therefore, if a smaller casing were to run into a large boulder, the casing would have to be withdrawn and the process started over again. Obviously, that is a much more expensive operation. The change order compensates the Contractor for the increase in material cost for the larger casing and the labor associated with the jacking and dealing with the boulders in the area. The total amount of the change order is $13,368.75. There would be no extension of the completion date to accomplish this change order. We have carefully reviewed the situation in the field and would recommend approval of this change order. If you have any questions regarding this issue, please call. Sincerely, MSA, CONSULTING ENGINEERS T~~ TJM:tw Enclosure 215-2711.jun - CHANGE ORDER (Instructions on reverse side) e PROJECT: No. 1 Trunk Sanitary and Water Elk Park Center DATE OF ISSUANCE: June 14, 1994 OWNER: (Name, Address) City of Elk River 13065 Orono Parkway Elk River, MN 55330 OWNER's Project No. 230-215-20 CONTRACTOR: ENGINEER: MSA Consulting Engineers 1326 Energy Park Drive st. Paul, MN 55108-5202 CONTRACT FOR:Trunk Sanitary and Water Elk Park Center ENGINEER's Project No. 230-215-20 You are directed to make the following changes in the Contract Documents. Description: Increase boring casing pipe from 24" to 30" on watennain, and from 20" to 30" on sanitary sewer. At a price of $38.75 per linear foot for material and all labor. Purpose of Change Order: Increase casing size to allow for man entry, and rock removal, as necessary. Attachments: (List documents supporting change) Cost Breakdown e CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price Original Contract Time $ 510,897.71 75 days or date Previous Change Orders No.~ to No.O Net change from previous Change Orders $ o o day. Contract Price prior to this Change Order Contract Time Prior to this Change Order $ 510,897.71 75 day. or date Net Increase of this Change Order Net Increase of this Change Order $ 13,368.75 o Contract Price with all approved Change Orders Contract Time with all approved Change Orders $ 524,266.46 75 days or date e Owner ~ B - C ntractor RECO~NDED: BY.~~ APPROVED: By EJCOC No. 1910-8-8 (1983 Edition I 21S-1S12.jun e e e " - i , . June 14, 1994 230-215-30 Change Order No. 1 - Cost Breakdown Increase boring casing pipe from 24" to 30" for watermain, and from 20" to 30" for sanitary sewer for. a cost of $18.75/LF material and $20.00/LF labor for a total of $38.75/LF total. Watermain Bid Item 2.14 Bore 24" Casing Pipe 155 LF @ $38.75 = $6,006.25 Sanitary Sewer Bid Item 3.40 Bore 20" Casing Pipe 190 LF @ $38.75 = $7,362.50 TOTAL $13,368.75 215-1512.JUN