Mr. Pat Klaers
City Administrator
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
RE: ELK PARK CENTER TRUNK SEWER AND WATER IMPROVEMENTS
CHANGE ORDER NO. 1
Dear Mr. Klaers:
Enclosed are three copies of Change Order No. 1 for the Arcon Construction contract on the
trunk sanitary sewer and water improvements serving Elk Park Center. This change order
relates to the jacking of the watermain and sanitary sewer under TH 169.
At the time that the construction of the jacking was initiated, a substantial amount of large
boulders were found in the area of the jacking pit. These raised the potential of blocking the
casing from crossing underneath the highway. In order to deal with this concern, the size
of the casings for the sanitary sewer and water were increased from 20 inches and 24 inches
to 30 inches. A 30-inch casing allows the Contractor to send a man to the end of the casing
to break up and remove any boulders that may be encountered during the jacking process.
Any size smaller than 30 inches does not allow this type of operation. Therefore, if a
smaller casing were to run into a large boulder, the casing would have to be withdrawn and
the process started over again. Obviously, that is a much more expensive operation.
The change order compensates the Contractor for the increase in material cost for the larger
casing and the labor associated with the jacking and dealing with the boulders in the area.
The total amount of the change order is $13,368.75. There would be no extension of the
completion date to accomplish this change order. We have carefully reviewed the situation
in the field and would recommend approval of this change order.
If you have any questions regarding this issue, please call.
Sincerely,
MSA, CONSULTING ENGINEERS
T~~
TJM:tw
Enclosure
215-2711.jun
-
CHANGE ORDER
(Instructions on reverse side)
e PROJECT:
No.
1
Trunk Sanitary and Water
Elk Park Center
DATE OF ISSUANCE: June 14, 1994
OWNER:
(Name,
Address)
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
OWNER's Project No. 230-215-20
CONTRACTOR:
ENGINEER:
MSA Consulting Engineers
1326 Energy Park Drive
st. Paul, MN 55108-5202
CONTRACT FOR:Trunk Sanitary and Water
Elk Park Center
ENGINEER's Project No.
230-215-20
You are directed to make the following changes in the Contract Documents.
Description: Increase boring casing pipe from 24" to 30" on watennain, and from
20" to 30" on sanitary sewer. At a price of $38.75 per linear foot for material
and all labor.
Purpose of Change Order: Increase casing size to allow for man entry, and rock
removal, as necessary.
Attachments: (List documents supporting change) Cost Breakdown
e
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIME:
Original Contract Price
Original Contract Time
$
510,897.71
75
days or date
Previous Change Orders No.~ to No.O
Net change from previous Change Orders
$
o
o
day.
Contract Price prior to this Change Order
Contract Time Prior to this Change Order
$
510,897.71
75
day. or date
Net Increase of this Change Order
Net Increase of this Change Order
$
13,368.75
o
Contract Price with all approved Change
Orders
Contract Time with all approved Change
Orders
$
524,266.46
75
days or date
e
Owner
~
B -
C ntractor
RECO~NDED:
BY.~~
APPROVED:
By
EJCOC No. 1910-8-8 (1983
Edition I
21S-1S12.jun
e
e
e
"
-
i
, .
June 14, 1994
230-215-30
Change Order No. 1 - Cost Breakdown
Increase boring casing pipe from 24" to 30" for watermain, and
from 20" to 30" for sanitary sewer for. a cost of $18.75/LF
material and $20.00/LF labor for a total of $38.75/LF total.
Watermain
Bid Item 2.14
Bore 24" Casing Pipe 155 LF @ $38.75 = $6,006.25
Sanitary Sewer
Bid Item 3.40
Bore 20" Casing Pipe 190 LF @ $38.75 = $7,362.50
TOTAL $13,368.75