Loading...
3.3. SR 11-06-2006 City of Elk River REQUEST FOR COUNCIL ACTION Agenda Section Meeting Date Consent November 6, 2006 Item Description Su lemental A reement #1 for Coun Road 40 Construction Introduction As the City Council is aware; Sherburne County is currently reconstructing County Road 40. The City of Elk River has agreed to pay a portion of the cost of this upgrade consisting of curb and gutter, detached bituminous trail, portion of the storm sewer costs, and water improvements. Discussion In working with Sherburne County staff in preparing these plans, we made it known that the city would like to have as much detached bituminous trail built with this project as possible. The original plans included approximately 18,050 linear feet of 10 foot wide bituminous trail. Through construction activities in the field the county has determined that they can construct another 1,300 feet of detached bituminous trail on the west side of County Road 40. I have indicated to the county in answer to their questions that the city would be interested in adding this additional trail along the west side since we are hopeful to eventually have a trail along both sides of County Road 40 from CSAH 13 to CSAH 12. Sherburne County is proposing to add this trail through the use of a supplemental agreement. Attached is Supplemental Agreement #1, which includes a trail construction and other construction related items that are the obligation of the county. Financial Impact Of the $43,146.63, it is anticipated that approximately $30,000 of this would be for the construction of the bituminous detached trail. It is anticipated that as with the other street related city costs for the reconstruction of County Road 40, this additional cost would be funded through the fees paid by the development of River Park and other future adjacent properties. Attachments · Supplemental Agreement #1 for County Road 40 reconstruction project Action Requested Approval of Supplemental Agreement #1 for the County Road 40 project and authorization for the city engineer to execute the document on behalf of the City of Elk River. Council Action Motion by _ Second by _ Vote Follow Up S:\EngineerImprovProj\2006 Improvement Projects\County Projects\County Highway 40 Supp Agreement I.doc MN/DOT TP-02134-04(2199) STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract No. SUPPLEMENTAL AGREEMENT NO.1 CONTRACTOR; Dresel Contracting, Inc. ADDRESS: 24044 July Avenue Chisago City, MN 55013 I MINN. PROJ. NO. LOCATION OF WORK County Highway 40 From CSAH 12 toCSAH 13 I COUNTY PROJECT NO. S.P.71-596-04 GROUP NO. APPR. AMOUNT GROUP NO. APPR. AMOUNT GROUP NO. APPR. AMOUNT DATE ENCUMBERED ORIGNINAL ENCMUBRANCE: SA TOTAL $ BY: $ ENCUMBERED TO DATE: Individual signing certifies that funds have been encumbered as reQuired by Minn. Stat. ~ 16A.15 This Contract is between the State of Minnesota, acting through its Commissioner of Transportation, and Contractor as follows: Whereas: This contract provides, among other things, for the Grading, Aggregate Base, Concrete Curb & Gutter, Storm Sewer, Bike Path, and Bituminous Surfacing on County Highway (CH) 40 between County State Aid highway (CSAR) 12 to CSAR 13; and Whereas: The City of Elk River requests the installation ofa bike path on the west side ofCH 40 between 19181 Avenue and CSAR 13 (Station 71+40 thru station 84+20); and Whereas: The installation of the bike path will require additional 24" RC Pipe to be installed between structures 6A and 6B at station 77+00 left; and Whereas: A 24" RC Pipe will be installed at centerline station 45+00 to allow drainage from the east side to the west side of CH 40; and Whereas: The contract did not provide for Muck Excavation and muck was found under the proposed roadway between station 74+00 to 79+00. Granular borrow will be hauled in for the excavated muck material. NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: I) The contractor has agreed to perform all the above work in accordance with the Plans and Specification and all work shall meet the requirements ofthe MN/DOT specifications. 2) The contractor shall construct a 10' paved bike path as shown on the typical section of the construction plans. The bike path shall be constructed 8' from the back of curb. Payment to construct the bike path shall be made at the contract unit bid price. 3) The contractor shall install an additional 16' ofthe 24" RCP between structures 6B and 6A at the percent of grade indicated on the construction plans. Payment to install16LF- 24" RCP shall be made at the contract unit bid price. 4) The contractor shall install a 24" RC Pipe culvert with aprons at station 45+00. The pipe shall be installed at elevation 928.00 on the west side and 928.50 on the east side. It shall meet the requirements of MnDOT specifications and MnDOt detail plates 31 OOG, 3000L, & 3145F Payment to install the 24" culvert shall be made at the agreed unit bid price. 5) The contractor shall remove all muck material between stations 74+00 to 79+00 that exists under the proposed roadway. The muck material shall be stock piled and placed on the in-slopes for final restoration. Payment to excavate, stock and place muck material shall be made at the agreed unit bid price. 6) The granular material required to be hauled in for the muck excavation will be paid at unit bid price. This item will overrun the original contract and is not a part of this supplemental agreement. 7) The items listed above shall include all materials, labor and any other appurtenances necessary to complete the work. 8) The contractor will not make claim of any kind whatsoever for any other expenses which he may have incurred or which he hereafter incurs, in performing the work and furnishing the materials required by this agreement. 9) Zero (0) additional working days will be added to this contract. MN/DOT TP-02134-04(2/99) STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract No. SUPPLEMENTAL AGREEMENT NO.1 ESTIMATE OF COST Specification Number Item DescriDtion Unit 2105.505 Muck Excavation CY 2105.522 Select Granular Borrow CY 2211.501 Aggregate Base Class 5, Bike Path Ton 2360.501 Type SP 12.5 Wearing Course Mix. (3,B) Ton Bike Path 2501.511 24" RC Pipe Culvert LF 2501.515 24" RC Pipe Apron EA 2503.541 24" RC Pipe Sewer Design 3006 CL II LF CONTRACTOR ALLOWANCES Commissioner of Transportation: rburne County Engineer Dated: lo/J~ /Oe., . . By: Pursuant to Delegation CO"t~~ Dated: /& - / f -Dl Dated: District 3 State Aid Engineer For Funding Approval Only Dated: Elk River City Engineer Dated: 2 Unit Est. Total Price OuaD. Amount $4.00 1,000 $4,000.00 $7.40 2,530 $18,722.00 $12.00 384 $4,608.00 $58.50 167 $9,769.50 $36.40 72 $2,620.80 $650.00 2 $1,300.00 $ 31.00 16 $496.00 SUB AMOUNT $41,516.30 10% offirst $10,000 $1,000.00 2% of remaining balance $630.33 TOTAL AMOUNT $43,146.63 Commissioner of Administration By: Commissioner of Administration of Pursuant to Delegation Dated: