6.1.B. SR 12-18-2006
City of Elk River
REQUEST FOR COUNCIL ACTION
Agenda Section Meeting Date
En . eerni December 18, 2006
Item Description
Deerfield 3rd Addition Street Reconstruction 1m rovement
Introduction
The City Council ordered the feasibility study for the reconstruction of the Deerfield 3rd Addition
streets on October 2, 2006. That feasibility study has now been completed.
Discussion
An informational meeting was held with the residents of the Deerfield 3rd Addition on December
5, 2006. In the feasibility study's appendix is the informational meeting presentation, a sign-up
sheet of property owners, and minutes of the informational meeting. As you might expect, the
biggest issue at the information meeting was whether or not sidewalks are needed on all streets
and where they would be located. This will be a controversial issue in this development, given the
topography of the area. Since many of the driveways are relatively steep, a sidewalk cannot be
placed on some sides of the road because it makes already steep driveways unbearably steep.
There was also some discussion regarding the original construction of the Deerfield 3rd Addition
and the problems dealt with over the years with the original developer.
The next step in proceeding with this project would be to accept the feasibility study and order
the public hearing. The attached resolution orders the public hearing to be held on January 16,
2007.
Financial Impact
As with previous street reconstruction projects, the City will have a significant contribution to the
cost of the street and storm drainage. Due to the fact that the original construction of the
Deerfield 3rd Addition did not have a significant storm sewer component so that the storm sewer
system will need to be built with the street reconstruction and the fact that the native soils will
require a i-foot sub cut and sand fill replacement, approximately 75 percent of the cost will be
funded by the City. The feasibility study recommends an assessment rate of $6,650 per residential
lot.
Attachments
· Feasibility Study
· Resolution 06-_, Receiving the Feasibility Study and Ordering the Public Hearing
Action Requested
Adoption of the attached resolution.
Council Action
Follow Up
Motion by _
Second by _
Vote
S:\EngineerlmprovProj\2007Improvement Projects\Deerfield 3rd St-Storm Drainage\12 1806 cc memo.doc
RESOLUTION 06-
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND ORDERING A
PUBLIC HEARING ON THE IMPROVEMENT IN THE MATTER OF THE
DEERFIELD 3RD ADDITION STREET /STORM DRAINAGE RECONSTRUCTION
IMPROVEMENT OF 2007
WHEREAS the Feasibility Report ordered by the Council in Resolution 06-115 has been
prepared with reference to the Deerfield 3rd Addition Street/Storm Drainage
Reconstruction improvement and was received by the City on December 18, 2006;
and
WHEREAS the Feasibility Report recommends that the proposed improvement is feasible;
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River,
Minnesota:
1. The City Council will consider the Deerfield 3rd Addition Street/Storm Drainage
Reconstruction Improvement of 2007 as described in the Feasibility Report and the
assessment of the property abutting this proposed improvement for all or a portion of the
cost of the improvement pursuant to Minnesota Statutes, Section 429, at an estimated total
cost for the improvement of $4,730,500. A reasonable estimate of the impact of the
assessment will be available at the hearing.
2. A fublic hearing shall be held before the City Council on the proposed improvement on the
16 day of January, 2007, at 6:30 o'clock p.m. at the Elk River City Hall Council Chambers.
The City Clerk shall provide two published notices (one week apart) in the official
newspaper with at least three days between the last publication date and the hearing, and
mailed notice ten days to the hearing as required by law.
Passed and adopted this 18th day of December, 2006.
Stephanie, A. Klinzing, Mayor
ATTEST:
Joan M. Schmidt, City Clerk
S:\EngineerImprovProj\2007 Improvement Projects \Deerfield 3rd St-Stonn Drainage \Resolution Receive Feasibility Order PHdoc
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FEASIBILITY STUDY
FOR
2007 DEERFIELD 3RD ADDITION STREET RECONSTRUCTION PROJECT
CITY OF ELK RIVER
DECEMBER 2006
~
rVh-
BDM
CONSULTING ENGINEERS AND SURVEYORS, PLC
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FEASffiILITY STUDY
FOR
2007 DEERFIELD 3RD ADDITION STREET RECONSTRUCTION PROJECT
CITY OF ELK RIVER
CERTIFICATION PAGE
-
I hereby certify that this plan, specification, or report was prepared by me or under my
direct supervision and I am a duly licensed Professional Engineer under the laws of the
State of Minnesota.
Terry J~gr~
Lie. No. 15316
iz/lz/O"
Date
Pre~~\~L
12/1~ O~
Date
John Anderson, P .E.
Lie. No. 25889
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
I. INTRODUCTION .................. ................... ................................................................. ....................... I
II. PROJECT SCOPE................. ................... ................ .... ........................................................ ............. I
ill. NECESSITY AND COST-EFFECTIVENESS ................................................... .............................. I
IV. EXISTING CONDITIONS .......... ................ ...... ................................................ ............. .................. 2
V. PROPOSED IMPROVEMENTS....... .......... ...... ......................... ...... ............ .......... ................. ......... 4
VI. RIGHT -OF-WAY, EASEMENTS, AND PERMITS ........................................................................5
VII. INFORMATIONAL IffiARING ............ ................... .... ............. ............... .......................... ....... ........ 6
VIII. ESTIMATED PROJECT COST ....................................................................................................... 6
IX. FINANCING AND ASSESSMENTS ............................................................................................... 6
X. PROJECT SCIffiDULE ............................................................................ ........ ................. ....... ........ 7
XI. CONCLUSION ... ................................ .............. .............................. .......... ....................... ................. 7
XII. EXlllBIT I - PROJECT AREA ................................................................................................... X-I
XIII. EXlllBIT 2 - EXISTING SANITARY SEWER ........................................................................_ X.;2
XIV. EXIDBIT 3 - EXISTING W ATERMAIN .................................................................................... X-3
XV. EXlllBIT 4 - EXISTING STORM SYSTEM .............................................................................. X-4
XVI. EXlllBIT 5 - PROPOSED STORM SYSTEM .........................................................~.................. X-5
XVII. EXlllBIT 6 - PROPOSED STREET SECTION .......................................................................... X-6
XVill. EXlllBIT 7 - PROPOSED STREET AND SIDEWALK............................................................. X-7
XIX. EXlllBIT 8 - PROPOSED ASSESSMENT AREAS .................................;................................. X-8
XX. APPENDIX A - GEOTECHNICAL REPORT............................................................................. A-I
XXI. APPENDIX B - INFORMATIONAL MEETING........................................................................ A-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I. INTRODUCTION
On October 2, 2006 the City Council adopted Resolution 06-115 .ordering the feasibility
study for the 2007 Deerfield 3rd Addition Reconstruction Project. The area to be
included in the project includes all of the streets originally platted as Deerfield 3rd
Addition in 1986 and is shown in Exhibit 1.
The proposed 2007 Deerfield 3rd Addition Reconstruction Project includes the
reconstruction of streets, sidewalks, and storm drainage facilities. The streets included
in the proposed project are listed below:
Dod e Street
190th Court
189th Avenue
Elk Lane
Baldwin Street
190th Avenue
191 st Avenue
Xavier Street
192nd Avenue
192nd Court
192nd Lane
Yale Street
Zane Street
192nd Avenue
II. PROJECT SCOPE
189th Avenue
Dod e Street
Dod e Street
189th Avenue
Elk Lane
Baldwin Street
Zane Street
191 st Street
Xavier Street
Xavier Street
Xavier Street
193rd Avenue
193rd Avenue
Dod e Street
The purpose of this study is to analyze the reconstruction of the proposed streets
included in the 2007 Deerfield 3rd Addition Reconstruction Project. In addition, existing
sanitary sewer, water, and storm sewer systems will be evaluated to determine the
necessity for improvements. The study will discuss the existing conditions, proposed
improvements, estimated construction costs, and overhead costs which include city
administration, engineering, fiscal, and legal expenses. Past City practices on similar
types of projects will be used as a guideline to discuss financing methods for the
proposed improvement.
III. NECESSITY AND COST-EFFECTIVENESS
The improvements proposed in this study are necessary for a number of reasons. The
reconstruction of the streets is a cost-effective means of continuing the City's proactive
street efforts and ensuring an adequate means of transportation for the residents. In
addition to rehabilitating street pavement, a total street reconstruction will allow for
correction of existing drainage problems through the construction of concrete curb and
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
gutter, modifying street grades, and the installation of an improved storm sewer
collection system.
The proposed improvements will provide a project large enough to ensure a competitive
bidding environment and therefore will be cost-effective. Based on the information
contained within this report, the proposed improvements are necessary, cost-effective,
and feasible from an engineering standpoint.
IV. EXISTING CONDITIONS
Street
Below is a table summarizing the existing conditions including information regarding
street length, width, curb & gutter, and sidewalk.
Dod e Street 850 30 No No
190th Court 205 30 No No
189th Avenue 380 30 No No
Elk Lane 300 30 No No
Baldwin Street 1920 30 No No
190th Avenue 660 30 No No
191st Avenue 830 30 No No
Xavier Street 885 30 No No
192nd Avenue 375 30 No No
192nd Court 225 30 No No
192nd Lane 715 30 No No
Yale Street 885 30 No No
Zane Street 885 30 No No
192nd Avenue 1634 30 Some No
In November of 2006, a geotechnical evaluation was performed in the area of the 2007
Deerfield 3rd Addition Reconstruction Project. Twenty two soil borings were taken at
depths from four to ten feet on throughout the study area. The soils encountered below
the existing street section were mainly glacial till soils consisting of silty sands
susceptible to moisture variations. The geotechnical report is provided in Appendix A.
each street block of the project. The soil borings indicated between 2-inches and 8-
inches of existing bituminous and between 3-inches and 7-inches of aggregate base
material
2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Sanitary Sewer
Within the area affected by the 2007 Deerfield 3rd Addition Reconstruction Project 8-
inch sanitary sewer is located on all the streets with the exception of 189th Avenue,
Baldwin Street, 191 st Avenue, and Xavier Street where 10-inch sewer pipe exists. The
existing sanitary sewer consists of PVC pipe. The existing sanitary sewer system is
shown on Exhibit 2. .
Watermain
Existing watermain is located throughout the project area consisting of 6, 8, and 10-inch
pipe. Dodge Street, 190th Court, Elk Lane, 190th Avenue, 192nd Avenue, 192nd Court,
192nd Lane, Yale Street, and Zane Street were constructed with 6-inch watermain. The
remaining streets within the project including 189th Avenue, Baldwin Street, 191 st
Avenue, and Xavier Street were constructed using 10-inch watermain with the exception
of 192nd Avenue which was constructed with 8-inch watermain. The existing watermain
is shown on Exhibit 3.
Storm Sewer
There is currently storm sewer located in many areas throughout the project, but. it
consists of what would be found in a rural area. Most of the storm sewer lines simply
convey overland stormwater flow through the existing streets from swales and low areas.
The main storm sewer line is located on 191 st Avenue. The 36-inch storm sewer line
begins in the adjacent lots along 191st Avenue between Zane and Yale Streets and
drains portions of 192ND Avenue east of Baldwin Street, Zane Street, Yale Street, Xavier
Street, and 192nd Lane. It continues along 191 st Avenue to Xavier Street where it turns
to the southeast along a side lot line which eventually conveys the stormwater into a
regional pond. This storm sewer line was constructed by the City after Deerfield 3rd
Addition was developed in response to drainage concerns.
The stormwater along 192nd Avenue from Baldwin Street drains west across Dodge
Street. The portion of 192nd Avenue east of Baldwin drains to a series of catch basins
located just to the west of Zane Street that outlet into adjacent lots.
Dodge Street within the project area drains to the south past 189th Avenue. 190th Court
drains east into the cul-de-sac from Dodge Street and then through storm sewer into the
adjacent lots. The water then flows overland to an inlet eventually crossing 189th
Avenue. The catch basins on 189th Avenue collect street drainage from portions of
Baldwin Street, Elk Lane, and 189th Avenue. The stormwater eventually drains south to
a pond located in the rear of the southwest corner lot on 189th Avenue and Elk Lane.
The stormwater along the north half of Baldwin Street flows south to a set of catch
basins which outlet into adjacent lots to the southeast.
The stormwater drainage along 192nd Avenue from Xavier Street drains to the east into a
catch basin which outlets into an adjacent property. Drainage along 192nd Court also
flows east into a catch basin and outlets onto an adjacent property.
The existing storm sewer is shown as Exhibit 4.
3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Existinq Private Utilities
Private utilities that have facilities in or near the project area will be notified of the project
and requested to incorporate repairs and replacements with the project as needed at
their cost. Private utilities include Elk River Municipal Utilities, Qwest, Center Point
Energy, Charter Communications, Great River Energy, Northern Natural Gas, Northstar
Access, and Sherburne Telephone Systems.
V. PROPOSED IMPROVEMENTS
The proposed improvements for the 2007 Deerfield 3rd Addition Reconstruction Project
include street and storm sewer construction. A detailed description of each proposed
improvement is provided below.
Street
The proposed typical section for the streets in this project will be in accordance with the
section adopted as part of the Pavement Rehabilitation Report with the exception of the
aggregate base thickness. The proposed street section consists of a 28 to 32 foot wide
street with concrete curb and gutter. The section generally mimics the existing
pavement width plus the width of the proposed curb and gutter. One exception to the
section listed above is Dodge Street where the width of the existing street will be
retained.
The proposed pavement and subgrade materials for all the streets consists of 12 inches
of select granular borrow, 8 inches of Class 5 aggregate base, 2 inches of bituminous
base course, and 1.5 inches of bituminous wear course. The proposed street section
has been verified by a geotechnical investigation. The geotechnical evaluation
performed by Independent Testing Technologies concluded that a 12-inch subcut of the
existing silty sand will be necessary to achieve a 9-ton design. The material within the
subcut area will be replaced with 12 inches of select granular borrow. The proposed
street section is shown in Exhibit 6.
In accordance with City Council direction to construct pedestrian facilities with new street
construction, the proposed improvements also include a 6-foot wide sidewalk located on
one side of each of the streets within the reconstruction area. With a 32-foot street width
there are numerous locations where retaining walls will be required in order for the
proposed sidewalk to fit adequately with existing grades. A 28-foot street section was
also considered which alleviates some potential retaining wall locations.
During final design, locations where sidewalk may not be feasible will be considered
further. With the proposed sidewalk improvements, a connection to an existing sidewalk
location will be made at Dodge Street. Proposed street and sidewalk locations are
shown in Exhibit 7.
As with the previous street reconstruction projects, the 2007 Deerfield 3rd Addition
Reconstruction Project proposes to have Elk River Municipal Utilities install decorative
street lights in accordance with their lighting policy as part of the project.
4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Sanitary Sewer
The sanitary sewer within the project area will be televised to determine the extent that
repairs or replacement would be necessary. A review of the Closed Circuit Televised
Sewer Inspection Report is expected to show that the existing system will not need any
repairs at this time. The report will also be discussed with Mr. Gary Leirmoe, Chief
Operator. The existing sanitary sewer is shown in Exhibit 2.
Watermain
Proposed watermain improvements were discussed with Mr. Bryan Adams, General
Manager of Elk River Municipal Utilities (ERMU). There does not seem to be a need to
perform any watermain improvements at this time although there may be some hydrant
relocations performed to allow for sidewalk placement.
Storm Sewer
A review of the drainage patterns and pavement conditions reveal that many locations
do not currently drain runoff effectively and has contributed to the significant
deterioration of the pavements. Replacement and addition of curb and gutter, sUght
grade revisions, and storm sewer extensions are needed to facilitate suitable drainage
patterns.
Additional storm sewer is proposed along all of the streets within the project area. All of
the bituminous flumes and drainage across streets to adjacent lots will be eliminated with
the addition of concrete curb and gutter. By in large, all stormwater reaching the streets
will flow into catch basins. Additional catch basin locations will also help alleviate drainage
problems.
The existing storm sewer outlets on 1891h Avenue and 19151 Avenue will remain due to
their connection to existing ponding areas. Much of the proposed storm sewer will
connect into these locations. The proposed storm sewer improvements are shown in
Exhibit 5.
VI. RIGHT-OF-WAY, EASEMENTS, AND PERMITS
Riaht-of Way and Easements
No right-of-way will need to be acquired for the street improvements.
Temporary construction easements may be required throughout the project area to
accommodate driveway repair, water service replacement, and/or finished grading.
Verbal permission will be secured from private property owners during the construction
process should work need to be completed on private property.
Permits
Several permits will be required prior to construction of the proposed improvements.
Required permits include, but are not limited to, the following:
5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
· Minnesota Department of Health
· Minnesota Pollution Control Agency (NPDES)
Watermain
Grading/Storm Water Quality
VII. INFORMATIONAL HEARING
An informational hearing was held on December 5, 2006 with the affected property
owners. The project was discussed and residents were encouraged to voice their
concerns and to ask questions. Approximately 31 of the 190 properties notified for the
informational meeting were in attendance. The major issue appeared to be whether or
not to include sidewalks. A walk through will be scheduled with the residents prior to
construction. Appendix B describes the informational hearing in more detail including
minutes and the signup sheet.
VIII. ESTIMATED PROJECT COST
The estimated construction costs and associated overhead costs for the proposed
improvements are summarized in Table 1. Based on past experiences on similar
projects in the City, the overhead costs have been estimated at 28% of the total
construction cost. The overhead costs include city administration, engineering design,
fiscal, and legal costs.
Table 1
Project Cost Estimate
Storm Sewer and Street Improvements
Administration, Engineering, Fiscal, & Legal (28%)
Contingency (5%)
Total Project Cost
$ 3,556.800
$ 995.900
$ 177 ,800
$ 4,730,500
IX. FINANCING AND ASSESSMENTS
The improvements discussed in this report are proposed to be financed through a
number of different methods. Benefiting properties would be assessed on a per unit
basis for street, curb and gutter, sidewalks, and storm sewer. A residential lot that could
not be further subdivided would be assessed as one unit. Lots that can be subdivided
would be assessed as multiple units as appropriate. The number of assessable units is
approximately 190, as shown on Exhibit 8. In accordance with the adopted Pavement
Rehabilitation Report, the proposed assessment is $6,650.00 per unit. The total
assessment amount would then be $1,263,500.
Based on the estimated total project cost of $4,730,500, and total assessments of
$1,263,500, the remaining project cost to be funding by the City is $3,467,000.
6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
X. PROJECT SCHEDULE
Informational Meeting
Feasibility to City Council
Public Hearing
Plans and Specifications Ordered
Prepare plans and Specifications
Walk Through with Residents
Plans and Specifications Approved by Council
Advertise for Bid
Assessment Hearing
Bid Awarded
Begin Construction
Construction Substantially Complete
First Assessment Payment with Real Estate Taxes
Place Final Bituminous Lift
December 5, 2006
December 18, 2006
January 16, 2007
January 16, 2007
February 2007
Spring 2007
Spring 2007
MarchI April 2007
March 19, 2007
April 2007
May 2007
Fall 2007
May 2008
Summer 2008
XI. CONCLUSION
The total estimated project cost for street, storm sewer, and watermain including
overhead costs is $4,730,500. The project is necessary and cost-effective. As
previously stated, this cost will be financed through a combination of assessments to
benefiting properties, Elk River Municipal Utilities funds, and City Street Reserve funds.
Based on the information gathered and the analysis presented, the proposed
improvements discussed in this study are feasible from an engineering standpoint.
7
-------------------
0
...
~ m
Q
m
z
0J a
0 :lI:Ien
0 m-l
n:ll:l
om
Zm
n en-l
0 -I en
z
ell :lI:I-I
?~
-'"~ Co
:0 ~ nllll
~m
~:3: a
~
'1:l
R
N
enO
...0
;a~
men
m...
...;a
enm
...m
0'"
-
ms:
m"
-;a
S:o
,,<
;am
OS:
<m
mz
a...
en
~
<
-
m
::Ill
en
-I
tz1&
~
~n~-~/
m
><
..a.!
m
-
...
-------------------
o
~
G-J
o
o
n
o
Z
rn
~~
:0 ~
~~
~
'"ll
h
mN
><g
--.-a
en
...en
-...
Z:a
am
enm
:1>'"
Z-
-3:
...."
:I>:a
:ao
-<<
enm
m3:
=em
mZ
:a'"
en
trJi
~-~--
</ "
~ ~
W--j
m
><
N:
m
-
...
/ '- Ol
~
- ~
!!I~ lJJJ <;
w~ ::IJ Y ..~ 6~ e
0:) 0
- -8 e
- Q
- r--- m
'" ( ~~ )61- CI!
;:a
m
<9', \ m
~ -I -
~ (~ 1
" en
~> \) -- Q) ---- ----J
'/"to
N ~
)> .
Z s
m
en fn
-I -I 'Y
~( '/'ij ~
:lAY Z'I- 061- N ~
i
"
..., ~
'"
()
"
::Int :III Y.. SI- 51- ---
~r nO~
--
~, leu
0 eXl
...,
~g----4 )C I~ ~Il ~8
:lA' 0 ~Zl l- e
~ ( IFn m 0
-.. e
I~ CI! i Q
m
I!: .;! ~ en
me 0> ~ -I
~.n]:J :::a f m ~ ------ :::a
m -I ~ m
@---;-:-8~ i!!l m
?~:- -I
I
- T:: )3 t!)
-j)~ J .....
--, , ::Infl Ita NZI ;)
(:; &--;-;-8 - I; :lA I-
'"'
:: NV 10 ~Z~ I- \
G~I ~ \ ~
( -1
~~e6~ ~ \\j -----' i
t
q
\~ "
'--..m
~n
-------------------
o
~
0J
o
o
('")
o
z
Ul
;~
io ~
~~
::<l
!'>
F;
I'"
~ m
C')
m
Z
D
m
)C
-
en
...
-
Z
C')
:z:
-<
D
::a
):.
z /
...
~t:
%~
3J y foI~ 6 J
'" ~
i V~
en
....
N
o
o
m......
><en
-...
en:a
::!m
Zm
Q'"
~-
J>:I
..."
m:a
:aO
:1<
J>m
-:I
Zm
Z
...
en
t:t1i
~
t-iW__//
m
><
w:
m
-
...
~(
~\
(7
-
CD
3N' ONZ ia.
'"
~Hn ~:J
C/r:-
~
~
- !::
L
::!:
;a
m
~
(
::
~~Oli L\
\\
~<
~y I ~68a.
~ "r)l
~lfJ
u....
'I
I---
a
c
o
c
tr~ ~
~j 6a. ~
I AI
-I
~
lJ 0:)
""'--
~~~~~
~~~
~ '"
~ ~~;ti
~ ~~!1
~~
\
y
)
, ~I-l~
3A Y Z/I. 06 a.
~
. nl 3~Y J sa. Sa.
n'
..-
(
en
;!
m
-I
1\0.1
~
m
lit
-i
m
., (
~
(
,.... ~
..
: N~11 O""ZI 10
-1
----- -
I L ~~
i---
~ i---
rl i---
i I---
'"
..., ~
--
-
I
a
o
c
Ci)
m
en
...
------ ~
..-- m
-I
,..
~
V
UI
.
.-
c
~
-
z
~
In. 3A"ONZllilo
r-1
\
g
---i
t
-------------------
o
~
(J,j
o
o
n
~
CIJ
~~eo
io ~
~~
12
R
N
o
mO
)(--1
-en
en...
:!~
Zm
C)m
en'"
...-
Oi:
~"
i:~
o
en<
mm
~i:
mm
~Z
...
en
~
~
w-/
m
)(
,.=
m
-
...
~ I""
m
[I Q
m
Z
CI
mm m
)>>< ><
en- -
_en en
Z-I -I
-- -
3!:Z Z
)>Q Q
Zn en
:1:)> -I
0-1 0
I""n ;Ill
m:l: 3!:
en / '\ ~ 3A~ I
m .1681-
=:
m --II .::
- ;Ill
!:t:! L/J;
~~ 31 Y f.I.11 161- ClI
.1 no) 0
ClI
G')
r--- m
" .106 tn
-1-
:::a
, m
m
-I
't.(o. ~~ "-... ;'
~.t
\
- Q, /
\) - ~
-
~ V ,.. r
~ 1- ~ , -
z . s
m
tn tn
-I
-I -- 'Y
V( /I ~
3AY Z/I- 061- -N ~
i
"
~ .., ~
: n. 3~ Y SI- 61- ~ ----
~ iIIiia. .1
--
~
· 3AY ONZ61- ~ ~
ClI
r- ~ 0
m ClI
- Z
m tn G')
;Ill -I m m
~~n~~ ~ :::a tn tn
m -I "9 -I
m :::a ~~ --- :::a
-I m m
m ~ -- m
.--- -I -I ~/;. -I
?~6~. ~
3nN3AY ONZ61-
~ DI 2)
:a:-
:: NV 10 ~Zt I- r-
ClI
:E
:;
-Y ~
. ( 11=
W
~. - - \
~ J-
~
U
~
-------------------
o
~
GJ
o
o
("')
o
z
i~
~o ~
~~
PJ
'"0
F;
"
::a
o
"
ON
fnO
mO
CI~
fnfn
......
O::a
::am
3:m
fn'"
m-
~3:
m"
::a::a
o
-<
3:m
"3:
::am
Oz
<...
mfn
3:
m
z
...
fn
-
[I @ r
m
Ci)
~ [I m
Z
CJ
m" " mm m
)>::a ::a )>>< ><
(110 0 (11- -
-" " _(II (II
~o 0 Z-I -I
-- -
:C(ll (II :CZ Z
)>m m )>Ci) Ci)
zCJ CJ zn (II
:Z:n (II :z:)> -I
0)> -I 0-1 0
r-l 0 rn ::a
mn ::a m:z: :c
:z: :c
(II
(II m
m :e
:e m
m ::a
::a
{Z/ /
I ~/
\ 3A" '. .L68.. /
~ -
I
!:.~ fill cr
~3 ~
\~~ 3A" H.L06.. -en
~ - -I
;a
0610 m
~ ~
~!-
"-
~~~
~. >~
en
-I
"
;\
~
~
J-.;
..----
) L
/
~
N
~
Z
m
en
-I
I
s
'Y
II
/7
~.\
~
Q'
i
"
...,
3A" ZJa. 06 a.
I I
.---:
<--
1
311 N31\" .LSa.6
iI II...
,. '\
.-
,...- iii uo~ 0..:.
3A' a ~ZE a. ~f cr
m .~ 0
< cr
1m l!!l m.. Ci)
m'" m
~ ~,~ :::Ill ~ ? en
~N ~ -I
.Lun ):) m fii ~ -----m
iii ~
r-- ,_-I -I -I
V~6~ - r-
~.- 3nN:lA" ONZ6a.
l T~ ~
~ III
..
! N, rw ONZE a. r
cr
~
:;
J ~
t'=li ~~fIr
If
Ul-j
~w
~~.
G
~
m
><
c.n:
III
-
...
-
l.-
\
-------------------
o
~
0J
o
o
(""")
o
z
~gf'
~~
t?;l
P3 '
't:l
h
"N
::aC)
O~
"en
0-1
en =a
mm
am
en-l
-1-
=a:s::
m"
m=a
-10
en<
mm
n:s::
-1m
OZ
z-l
(I)
-I
-<
-a
-
n
~
....
fA
-I
:a
m
m
-I
fA
m
n
-I
-
o
z
* *
~UO
)>:::00
-100
ouGJ
IOrrl
(J)
rrlrrl)>
xO<
- rrl
~~:::o
zo~
GJ=t~
O(J)
'1
en
oen
o ~
o
GJ
rrl
-I
o
---->. 0
N::: OJ 0
:::c
(J)ocg
rrl'rrl
M)>
o(J)~
)>-I(J)x
=gGJUlc!
:::0:::0)>:::0
O~GJrrl
<cGJ~
rrl,:::O,
O)>rrl<
(J):::oGJZ
)>~
crn-lG-J
~OrrlUl
:::o:::OrnO
)>:::o)>G-J
oO(J)O
rrl~rrl~
~~
~T
)>
:::0
Z
GJ
o
o
C
:::0
(J)
rrl
N
Z
o
Z
~
rrl
)>
:::0
Z
GJ
Ul
~~
Z :::
'0 GJ
0:::0
rrl)>
Zz
-Ic
)>,
~)>
:::0
---->.
~ ~~
o
rrl-l
I
(J)OO
-0
Oz^
fTlOrn
~:::o-<
)>fTl
'-Ien
^[Tl ~
---->.
~
I
---->.
en
,'f'.,.
.: .'.~...
en
\
*
~
:::0
o
~
*
en-A
o
---->.
Orn u' ~
cen OGJ I
t?=1i ::::0---->. ,I ---->.
~ rnOJ fTl-l en
~
</ '-. R>O :::0
Cb
~n~--j/ 0 0
GJZ (J) ~
co 0
-1::::0 0
m -IfTl
[Tl-l
>< :::OfTl
0)=
m
-
-I
~
X
-I
C
:::0
fTl
~
~
-1<
)>~
ofTl
^G-J
Ul
00
0G-J
)>Ul
-I~
~
I
---->.
en
N
o
o
~
1'0
o
o
~
I
*
~
~
I
...
---->.
en
o
en
"--J
N
-------------------
o
~
G-l
o
o
(")
o
Z
~~
~ea
~t1 ~
~~
~
'""d
~
-a
:a:JN
00
'110
0--1
cncn
m-l
a:a:J
cnm
-1m
:a:J-I
m-
mil:
-1'11
go~
cn<
-m
ail:
mm
~z
)>-1
r-cn
~
~~..-..-..
<// "
(\)
~n-j
m
><
--..:
III
-
-I
!I~
\ ~/~~~~
y~ . ~
,~~
~
~'
'~.'
~ .~'
~
:i}
~~"
~ .~
T'\. ~ .i'f:.0
/''''' ~
~
\ ~
~ ~
,~
~~~~~.~~~)
~ ~ ~. y
,~ ~ ~
~ .~ .~
~~~~~~):~~..~..'.;.~...~....~. . .,.i.~...~~~' .....
'~I~ :~ ....~~~~
~ ~~ :.~ .~
~~ I ~ /: .....
/ci~~ ~... . .... ~ ~
/ I ~ .~ ~;~
t~~~~~~
~ \
)
~~"Q ~
-
I I r-
m
Q
m
" . z
CJ
::a en m "'a
m... >< ::a
n::a - 0
en
om ... "'a
zm - 0
en'" z en
...en Q m
::a... en CJ
Co - en
nm CJ -
~m m CJ
:IE m
CJ :a:- :IE
r- :a:- /
'" r-
'"
'" \
~ >~
en
-I
~(
-
-
~
Z
m
en
-I
aAY Z/a. 0610
/~ I
~tL 1 / /
~~ / /{
- ~...~~..0-...~'-:;..'..a.i.. .....;.,...~. '...:.:'.'8.... .~..~~. Ct..:O'..t....."S ~
~~'\~,''f;:.::,,''~~~~~,~''1
~~.. . ..~~;
,~ ..::::.::><
.,~~, .~
&.. &~"...
,~ ~.~ ',,,'
'~ I
.~..~. '.' '.:,
~~ .~,
~ ~.. ~,~
~ .~.~..~.~~.. ~.;.
~,-\ ~"
~o~a. .~ ~ _
...... .,
'-.: :~
~
\
\
I
-----
~
~
~
i
~
...,
I-
-
-
-
~ -
-
--- f---
I-
I-
I-
I-
ClI_
O
CII
Q-
m
(1)-
...
.-- -- iI '--
-- m
-I
~
! I
'~.:>
/
~
f~~
\\\
I \Y
........,
---r~
t- - --\
J
-------------------
r-
0 m
C)
m
~ Z
CJ
:J>
G.I ::a
m
0 :J>
0 en
-I
0
n m
0 m
z
[J) :J>
~~
en
en
~o ~ m
en
~~ en
l?:l m
~ CJ
'"tl
t-'
n
N
o
3>0
:=a---
mfn
3>-1
fn:=a
-1m
O~
DJ-
m3:
3>"
fn:=a
fnO
m<
fnm
fnl:
mm
az
-I
fn
~
~~--'
<,/ "
(J) )
t;U~__//
m
><
CO:
DJ
-
-I
5
-
m
:Ill
tn
-I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
xx. APPENDIX A - GEOTECHNICAL REPORT
A-1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
337 31ST AVENUE SOUTH · PO BOX 325 · WAITE PARK, MN 56387
OFFICE: 320-253-4338. FAX: 320-253-4547
NOVEMBER 29, 2006
PROJECT 06-507B
REPORT OF GEOTECHNICAL EXPLORATIONS.-
- ---- -- -- -- - -- - - --Fer --- - --- -- - --- ---
2007 STREET RECONSTRUCTION
DEERFIELD 3RD ADDITION
ELK RIVER, MINNESOTA
Prepa~ed For:
CITY OF ELK RIVER
And
BDM CONSULTING ENGINEERS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
337 31ST AVENUE SOUTH. PO BOX 325. WAITE PARK, MN 56387
OFFICE: 320-253-4338. FAX: 320-253-4547
November 29,2006
Mr. John Anderson, P.E.
City of Elk River
13065 Orono Parkway
Elk River, Iv1N 55330
RE: 06-507B
Report of Geotechnical Exploration
2007 Street Reconstruction
Deerfield 3rd Addition Improvements
Elk River, Minnesota
Dear Mr. Anderson:
Independent Testing Technologies, Inc. is pleased to submit the results of our subsurface
investigation program for this project in Elk River, Minnesota. This report represents our
work for this project as authori~ed by you. It includes our recommendations regarding
earthwork, fill and compaction, utility installation, subgrade preparation, and pavement
design. Three copies are enclosed.
The soils on this site are moderately well suited for the proposed utility installation and
street reconstruction. The majority of the soils encountered were glacial till soils
consisting of fine to medium grained, silty sands (SM) with gravel. These soils are
susceptible to moisture variations. Soil samples obtained during our investigation will be
stored at our office for thirty days after the date of this report. After that time, they will
be disposed of unless you advise otherwise.
Mr. Anderson, it has been our pleasure to work with you on this project. Please contact
us if you have any questions or need additional services.
Sincerely,
paZ~. ~~ P.E.
Iv1N Registration #22037
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
"I
______ ___ ---CERTIFICATION - nu __n__
I hereby certify that this report was prepared
by me or under my direct supervision and that I am a
duly Registered Engineer under the laws
of the State of Minnesota.
9~R~oo=
Patrick A. ohnson
Date:~ Registration No.: ~2.D37
November 29,2006 22037
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
A. Introduction .................. ...... ...... ............................. ............ ... 1
Purpose....... ........................................ ......................... ........ 1
Scope of Services ................................................................ 1
gel1~~~I. ~it.e. ~911ditions............... ...... ....... ........................... 2
Available Subsurface Information....................................... 2
B. Exploration Program ............................................................ 3
Exploration Results .............. ............. ........... ....................... 3
Penetration Test Results ......................................................4
Water Level Observations ................................................... 4
C. Engineering Review............................................................. 5
Discussion............................. ......................................... ...... 5
D. ~eS;ql!lm~~d.ations ... ............ ....... ...... .................................... 5
Utility Installation.................................. .............................. 5
Earthwork.......... .............................. .................................... 6
Structural Fill...................................... ....... ....... ................... 6
E. Pavement Recommendations................................................ 7
F. Closing..... .... ...... .......... .............. .......... ................................. 9
Boring Location Plan ................................................Appendix 1
Soil Boring Logs .......................................................Appendix 2
I
I
I
I
I
I
I
I
I
I
I
I
I
GEOTEC~CALEXPLORATIONS
CITY OF ELK RIVER
2007 STREET RECONSTRUCTION
DEERFIELD 3rd ADDITION IMPROVEMENTS
ELK RIVER, MINNESOTA
PROJECT 06-507B
A. Introduction
This report is being prepared for use by our client on this specific project. We intend to
present this report and our findings in the same logical manner that led us to arrivejiour
recommendations. This report is based on some general assumptions regarding the
anticipated construction based on experience with similar projects. ~h~~, assu~pti()I:lS _ ~~,~
ffie- entiie- report sliould-b-e-reviewecfbiimedlateiy uponrecelpt.'- -- "
Purpose:
The purpose of our investigation was to evaluate the existing soil and water conditions on
this site for the purpose of reconstructing several residential streets throughout the City of
Elk River. The project will consist of bituminous street reconstruction with curb and gutter
and some storm sewer improvements. Some water main will also be replaced. In
accordance with your 'written authorization, we have conducted a subsurface exploration
program for the proposed proj ect.
Scope of Services:
Our authorized scope of services included the following:
1. To investigate the subsurface soil and water conditions encountered at
nventy-two (22) split-spoon soil boring locations. The boring depths were
planned to be 4 to 10 feet at each location. The approximate locations are
shown on the boring location plan in Appendix 1.
Page 1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
November 29, 2006
-Project 06-507B
2007 Street Reconstruction
Deerfield 3rd Addition Improvements
Elk River, Minnesota
2. To provide a report of our findings including the results of our subsurface
investigation and recommendations regarding earthwork, fill and
compaction, utility installation, subgrade preparation, and a design R-value
for pavement design.
General Site Conditions:
The proposed project site is located in an existing residential neighborhood east of
US Highway 169, North of 189th Avenue NW and south of 192nd Lane NW in the
City of Elk River. The existing residential streets are bituminous surfaced with no
curb and gutter. The site is gently rolling with slopes of 6-12 percent. The streets _
throughout the neighborhood are generally showing their age with distress
cracking common.
Available Subsurface Information:
According to the Geologic Map of Minnesota, Quaternary Geology, prepared by Howard
C. Hobbs and Joseph E. Goebel (1982, Minnesota Geological Survey), this site lies within
an end moraine of the Pine City Moraine association. It is associated with the Des
Moines Lobe glaciation of Pleistocene, Late Wisconsinan age. The till of this moraine
consists of grey, calcareous drift with shale and limestone clasts derived from parent
material in Manitoba and eastern North Dakota, but is often mixed with reddish till
incorporated from the underlying Superior Lobe.
According to the Soil Survey of Sherburne County prepared by the Soil Conservation
Service, this site lies within the Hayden-Braham-Emmert Soil Association. These consist
of undulating to steep soils over limy, grey glacial till mixed with red till or gravel or
capped with fine sand. Most of the individual soils mapped on this site have slight to
Page 2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
November 29,2006
Project 06-507B
2007 Street Reconstruction
Deerfield 3rd Addition Improvements
Elk River, Minnesota
moderate limitations for development of local streets.
B~ ~xplo~ati~~_ ?_,:"~g~a~
Twenty-two (22) split-spoon soil borings were conducted on this project. The borings were
advanced to depths of 4 to 10 feet using a 3 1/4 inch I.D. hollow stem auger. Samples were
obtained every 2 1/2 feet using a 2-inch O.D. split-spoon sampler in accordance with the
American-Sodety foyTestingana Matenals (ASTM Dt586): Stafiaafd"penetratloli" values ----
(N-values) were obtained at each sample interval by driving the sampler into the soil using a
140-pound hammer falling 30 inches. After an initial set of 6 inches, the number of blows
required to drive the sampler 12 inches is known as the standard penetration resistance or N-
value. Where the sampler can not be driven-at least 6 inches by 50 blows of the hammer, the
total number of blows as well as the distance driven is reported on the boring logs. __
Groundwater levels were noted during drilling and immediately after completion. The holes
were backfilled with the auger cuttings and patched with bituminous cold patch. Some
settlement of the bore holes may be expected. All of the borings were conducted with a truck
mounted rig. The boring locations were staked by us.
Exploration Results:
All of the borings were conducted on existing bituminous paved streets. The borings
encountered bituminous to depths of2.0 to 4.5 inches and aggregate base to depths of3.0
to 7.0 inches. The bituminous depth was 8.0 inches in boring B-16, which was an area that
had been overlaid.
Below the pavement, the borings generally encountered fine to medium grained silty sand
(SM) glacial till soils. Borings B-1, B-7, B-8, B-I0, B-20 and B-21 encountered outwash
SCll1<fS_ _c?ns~st~~_?f ~ltle ~~~~d~_ p~?~ly waded _ san~ ~~~. silt (S~~_S~! "an~ c~eaIl~po~~ly
graded sand (SP) to termination. Boring B-1 encountered some silt layers :from 4 feet to 5
feet. Boring B-14 encountered silty-clayey sand (Se-SM) to termination. Boring B-16
encountered silty-clayey sand (SC-SM) to 7.0 feet, followed by silt (ML) to 10 feet and
silty sand (SM) to termination. Boring B-18 encountered clayey sand (SC) to termination.
Page 3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
November 29,2006
Project 06-507B
2007 Street Reconstruction
Deerfield 3n1 Addition Improvements
Elk River, Minnesota
The rest of the borings encountered silty sand (8M) from below the pavement to
termination. Most of the soil encountered in the shallow borings was likely fill. No
organic soils or other unsuitable material was encountered.
Penetration Test Results: .
The blow counts in the sand soils ranged from 3 to 29, which are low to high, indicating
they are in a loose to very dense condition. Refusal of the spoon or auger did not occur in
any of the borings and the drilling was relatively easy in the all of the borings.
Water Level Observations:
. __ __u.u. _ _ __ _ __ ____ _._ _ ____ __ _ _ _______
Observations of the subsurface water conditions were made during drilling operations.
Groundwater was not encountered in any of the borings during drilling. Although the water
levels were observed over a short period of time, we feel they are an accurate
representation of the water levels on this site at the time of our exploration because of their
high permeability. It should be noted that fluctuations in the level of the groundwater can
occur due to variations in rainfall, temperature, spring thaw and other factors not evident at
the time of our investigation.
Mottled soils were not observed. Mottled soils are a historical indication of a temporarily
or seasonally saturated soil condition. Grey soils were also not observed. Grey soils are an
indication of a permanently saturated soil condition.
Page 4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
November 29,2006
Project 06-507B
2007 Street Reconstruction
Deerfield 3rd Addition Improvements
Elk River, Minnesota
c. Engineering Review
Discussion:
Based on our [mdings, this site appears to be well suited for the proposed street
reconstruction. The existing soils on this site are suitable for support of the utility pipes
and structures. The sand soils encountered on this site consisting of silty sand and clayey
sand (SM, SC-SM, SC) are fair for bituminous pavement support. These soils can often be
wet, especially during wet periods of the year. These soils may require drying or mixing to
reach optimum moisture for sub grade preparation. We recommend the pavement section
include a layer of select granular borrow between the subgrade and aggregate base to aid in
construction and internal drainage. In addition, subsurface drain tile should be installed in
sumps and low areas to drain the granular layer away from the subgrade soils.
D. Recommendations
The following recommendations are based on our understanding of the proposed project. If
our understanding of the project is not accurate or if-changes are-made-to-the-prujectscope,
please inform us so that our recommendations can be amended, if necessary. We have
included recommendations regarding earthwork and construction that may help in cost
estimates and aid in design. We should be allowed to review the proposed construction plans
to provide further detailed recommendations, if necessary. Without the opportunity to
review the final construction plans, the recommendations made in this report may no longer
be valid.
Utility Installation:
We recommend that all utility pipes lay in non-organic mineral soils capable of
supporting the pipes. Excessive over-excavation beneath the pipes should be avoided.
We recommend that 2 to 6 inches of granular bedding material be placed and compacted
around the pipe to aid in aligning the sanitary sewer pipe for line and grade. Granular
Page 5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
November 29, 2006
. Project 06-.507B
2007 Street Reconstruction
Deerfield 3rd Addition Improvements
Elk River, Minnesota
bedding beneath watermain and storm sewer pipe is not as critical. Compaction should be
done very carefully by hand to prevent the pipe from shifting. We recommend that the
backfill be compacted with a static sheep's foot roller after the backfIll is 2 feet above the
top of the pipe. Vibratory compaction should only be used on clean sands or silty sands at
or below optimum moisture.
We recommend that excavations slope at a 1.5:1 (horizontal: vertical) ratio from the
bottom of the excavation to the surface. Stockpiled material should be kept at least 2 feet
from the edge of the excavation. This is the minimum required by OSHA. We
recommend all construction vehicles be kept at least 5 feet from the edge of the
excavation. An escape ladder should be provided at all times while workers are in the
excavation. All excavations must meet OSHA standards (29 CFR1926).
Earthwork:
We recommend that any unsuitable, uncompacted, or unstable soils exposed during
construction be removed from beneath the proposed utility structures and street section. In
addition, we recommend that any excavation below a utility structure or street section be
oversized one foot for every foot of fIll placed to reach planned grade (1: lover sizing).
Structural Fill:
The onsite soils consisting of silty sand (SM) and silty clayey sands (SC-SM) are
considered fair material for use as street sub grade material. These soils are somewhat
susceptible to moisture variations and would need to be dried or mixed if they become
wet prior to compaction. In addition, they will likely have moisture contents above
optimum for compaction and will require drying or mixing to reach optimum moisture for
compaction, even in their natural state.
Page 6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
November 29, 2006
Project 06-507B
2007 Street Reconstruction
Deerfield 3rd Addition Improvements
Elk River, Minnesota
We recommend that any imported fill and utility trench backfill material consist of
mineral soils meeting the requirements specified below. No organic soils, roots, stumps,
logs, brush, etc. should be used as structural fill below any utility structure or pavement
section. We recommend that all fill and utility trench backfill material be free of soft, wet
or frozen soils, highly expansive soils, rubble, debris and rocks in excess of 6 inches in
diameter. The fill and utility trench backfill material should be as uniform as possible
both in composition and moisture content.
We recommend that all fill and utility trench backfill material be placed in 12-inchloose
lifts and compacted to a minimum of 95% of standard proctor maximum density (ASlM
----- ...--...-.---------. -- ------.-------.-------...-.---.-...----.--- --------------.---- -------.- - -.---- ---"
D698). Any fill placed in the top 3 feet of the road subgrade should be compacted to at
least 100% of standard proctor maximum density. All fill and utility trench backfill
material should be compacted at a moisture content within plus or minus 2% of the
optimum moisture as determined by a standard proctor. We recommend compaction tests
be taken at a minimum rate of one test per two feet of fill per 200 linear feet of the utility
trench backfill, roadway sub grade, and aggregate base material.
E. Pavement Recommendations
The majority of the expected subgrade soils in the Deerfield 3rd Addition consist of silty
sands (SM) and silty- clayey sands (Se-SM). These soils are classified as A-2-4 soils in
accordance with the American Association of State Highway Transportation Officials
(AASHTO) classification system. A-2-4 soils are rated as fair material for use as
roadway subgrade material. Without benefit of a laboratory R-value determination and
based on Mn/DOT guidelines, an R-value of30 can be assumed for the onsite soils.
Page 7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
November 29, 2006
.. .. ... -- . Pmject 06-507B
2007 Street Reconstruction
Deerfield 3rd Addition Improvements
Elk River, Minnesota
Based on an assumed R-value of30, we recommend the follm.ving bituminous pavement
section for 100'Il-volume, residential streets:
. - - - - - . . - .- - -. . - - -
Thickness Course/Description G.E.
1.5" Mn/DOT 2360 L V-3 Wear Course 3.4"
2.0" Mn/DOT 2360 LV-3 Non-Wear Course 4.5"
8.0" Mn/DOT 3138 Class 5 or 6 Aggregate Base 8.0"
12.0" Mn/DOT 3149 Select Granular Borrow 6.0"
23.5" TOTAL 21.9"
In using the above R-value for bituminous pavement design, it is essential that the
.. - . -. - -- -. -... - - - .. - - - -- --. . - .. - - . .. - - . .. - - - - -- - - - - - - - - -- - - -- -- - - - -. - -.. - -- - - - - -.. - - --. .. - - - -- - - -
subgrade be constructed of uniform soils at a moisture content and density in accordance
with Mn/DOT specification 2105 and capable of passing a test roll in accordance with
Mn/DOT specification 2111. The native, undisturbed soils may need preparation (drying
and compacting) to pass a proof roll. If the subgrade is not compacted, uniform and
capable of passing a test roll, then we recommend the subgrade be scarified and
recompacted or sub cut and geotextile fabric placed along with select granular material
meeting Mn!DOT specification 3149. The top of sub grade should be compacted to a
~_l!_lll_~~.!~O_~of.~t~~ard.pr()~tor_I?~~!Il.~~~s~o/..._ .._ _.___... n.n _._ _.._..___
The subgrade should be sloped towards the edges to provide drainage. We recommend
installing subsurface drain tile in the granular layer to aid in drainage. We recommend
the drain tile consist of a 4-inch perforated pvc pipe wrapped in filter fabric (sock type).
The drain tile should be installed in the granular borrow behind the curb.
Page 8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
November 29, 2006
Project 06-507B
2007 Street Reconstruction
Deerfield 3rd Addition Improvements
Elk River, Minnesota
- - - - - - -- - --. .F~ -Closing --
Our work was performed for geotechnical purposes only and not to document the
presence or ex1ent of any contamination on the site. We can note that our crew did not
detect any obvious contamination by sight or smell during drilling operations. However,
human senses are limited in terms of contamination detection and, therefore, the lack of
detection through human sensing does not preclude the possibility of the presence of
contamination of the site.
This report represents the result of our subsurface investigation and is based on
information gathered at specific locations. Subsurface conditions can change a great deal
over short horizontal distances. Also, the actual interface between strata will likely be a
gradual transition rather than an abrupt change as represented on the boring logs.
Geotechnical engineering is based extensively on opinion. Therefore, the data contained
in this report should be used as a guide, and we recommend that construction monitoring
be performed by a qualified geotechnical engineer or technician. Any change~ ~~e .. _
subsurface conditions from those found during this geotechnical exploration should be
brought to the attention of a soils engineer.
c:b6507B-Ipt
Page 9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
APPENDIX 1
BORING LOCATION PLAN
I
I~
I.~
I
I
I r
I
I
I
I-
I
I
I
I
I
I
I
I
I
~.''''''''''''''~f-~ I r--~~. __' ~~92ND' .
\~ .. I..
'. ....... ~~ -.' .. -
i '. , ell"
6-,tf
~ \ Ii '92NO W. NW lib .
'. ~-5' ~" ...... I /
. :/ If~B
. tL-;mN"~
-- ,
... - I~" . .
~ fJ-fG
I~I
~, '. l"92.ND(J I-E NW
/ SIt
....
Ii
.
/~
~.. .
-
1Qsj"..4.f
_. n. _.'
I~
......J
192 ND A.IE NW
If,-,
__I...--l.---
>~
~
.....
'"
l'5
g
~
C>
T"
~
~
~
.
:
~
~
I.:
: fl a
~ P"". I
~
....
""
(fp'"
!u
S-:3 ~... ..
I.
. -
l.~
r--- .
J f-----.,
\
J
'.
.~n .... 191sr.AIIE. NW
5 1:=
, .
"Iv.!'"
'+IJ.-~I
.I~
I I
I
-
-
: .
~
[lL....~ ~ -~\ . i~~~:==;-=
'" ~ ~
-'. ~ f..:.-
!,iT y- .,?
:. : L~ ~1 'Z"7 ~ .j:' r--.... ___
'190 11f -AIlE. NW I:'J'.
tl .f ~I
g-'4;)
..-- {
1901/2 -AVE NW
,", I I '\ ~
'h'" ..,:
.._,..~~
~ '.C ..... ~
J
~~
~
-
~
"O""...:~ /
~,
It-
I
\
\
i
\
i
\
j
l
I
P Ii
,':': .........
'--:"-...l891H::AIlE.NW -Il-f
i.r. J ............ .... ......) l J
I I)c~ -><:".2'" E L KL A N E
'C'V"')."
{; ;l'.: >":. c\;
\
~
J...:
)
--- ----
'\fl v-
BDM
CONSULTING ENGINEERS, PLC
2007 STREET
RECONSTRUCTION
DEERFIELD 3RD
ADDITION
u~/
/
~of { ~
J!,lk. ~
River
EXHIBIT
1 OF 2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
APPENDIX 2
SOIL BORING LOGS
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-5078 CITY OF ELK RIVER
DEERFIElD, 3RD ADDmON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA770N: 192nd Ave NW Between Dodge St&CarsonSt
I
I
I
I
I
I
I
SM
5.0
w /Iayers of silt from 4-5 feet
SP Poorly Graded Sand, Fine to medium grained,
ce gravel, brown
10.0
11.5
Boring complete to 11.5 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-9-06 BORING #:B-1
. START lIME: 11:26 END lIME: 11:45
METHOD: 31/4" 1.0. Hollow Stem Auger
CREW: EO/NF
ELEVAlION: NOT AVAILABLE Pa e 1 of 1
N Water
Value Table
Notes
4 NMC= 6.3%
%,#200= 12.4%
3
9
10
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER DATE: 11-1-06
DEERFIELD, 3RD ADDITION - START 71ME'-12:46
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCATION: 192nd Avenue Northwest
Sample
#
Boring complete to 4 feet.
No water was encountered during drilling.
LOG OF SOIL BORING
BORING #: B-2
END 71ME' 12:59
METHOD: 3 1/4" 1.0. Hollow Stem Auger
CREW: EO/NF
ELEVA710N: NOT AVAILABLE Pa e 1 of1
N Water
Value Table
Notes
11
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER
OEERFIELO, 3RO ADomON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA 710N: 192nd Avenue Northwest
Soil
Desai tion
.S" Bituminous Depth. 6.5" Aggregate Base.
SM IlTY SAND, fine to medium grained, w/a trace of
RAVEL, dark brown - Fill.
Boring complete to 4 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-1-06 BORING #:B-3
. STARTlIME'l:10 END lIME: 1:16
METHOD: 31/401.0. Hollow Stem Auger
CREW: EO/NF
ELEVAlION: NOT AVAILABLE
N Warer
Value Table
Notes
9
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER
DEERFIELD, 3RD ADDmON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA 710N: Zane Street Northwest
Boring complete to 4 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-1-06 BORING #:B-4
START TIME: 1:20 END 71ME: 1:26
METHOD: 31/4" 1.0. Hollow Stem Auger
CREW: ED/NF
ELEVATION: NOT AVAILABLE
N Water
Value Table
Notes
7
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER
DEERFIELD, 3RD ~DDmON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCATION: 192nd Lane Northwest.
I
I
I
I
I
4.0
Boring complete to 4 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-1-06 BORING #:B-5
START 71ME: 1:35 ENl5T1MEI-1:40-
METHOD: 31/4" 1.0. Hollow Stem Auger
CREW: EO/NF
ELEVA710N: NOT AVAILABLE Pa e 1 of 1
N Water
Value Table
Notes
10
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER
DEERFIELD, 3RD ADDmON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA lION: 192nd Lane NW Between Yale St & Xavier St
I
I
I
I
I
SM
4.5
Ml IL T, wI very fine sand, reddish brown.
10.0
11.5
Boring complete to 11.5 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
DA TE: 11-9-06 BORING #: B-6
START TIME: 11:00 END TIME: 11:18
METHOD: 3 1/4" 1.0. Hollow stem Auger
CREW: ED/NF
ELEVA7ION: NOT AVAILABLE
N Water
Value Table
Notes
NMC = 14.5%
7 %,#200 = 49.1%
7
9
6
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER
DEERFIELD, 3RD ADDITION
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA TiON: Yale Street Northwest.
I
I
I
I
I
I
I
I
4.0
Boring complete to 4 feet.
No water was encountered dUring drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-1-06 BORING #:B-7
STARTTIME'l:45 END TIME: 1:51
METHOD: 31/4" I.O. Hollow Stem Auger
CREW: EO/NF
ELEVATION: NOT AVAILABLE Pa e 1 of 1
N Water
Value Table
Notes
7
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER
DEERFIELD, 3RD ADDmON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA 7l0N: 192nd Court.
I
I
I
4.0
Boring complete to 4 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-2-06 BORING #:B-8
. ST.ART77ME:3:20 END 77ME.;-3:29
METHOD: 31/4" 1.0. Hollow Stem Auger
CREW: ED I JV
ELEVA770N: NOT AVAILABLE Pa e 1 of 1
N Water
Value Table
Notes
19
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-5078 CITY OF ELK RIVER
DEERFIELD, 3RD ADDmON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA ?TON: Yale Street Northwest.
BOring complete to 4 feet.
No water was encountered during drilling.
LOG OF SOIL BORlNG
DATE: 11-1-06 BORING #:B-9
STARt TIME: 2:00 END TIME: 2:07
METHOD: 31'4" 1.0. Hollow Stem Auger
CREW: ED INF
ELEVATION: NOT AVAILABLE
N Water
Value Table
Notes
9
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER
DEERFIELD, 3RD ADDmON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA nON: Xavier St NW Between 192nd Ave NW & 192nd Court.
Boring complete to 4 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-2-06 BORING #:B-10
STARTTIME3:05 END TIME: 3:14
METHOD: 3 114" 1.0. Hollow Stem Auger
CREW: ED I NF
ELEVATION: NOT AVAILABLE
N Water
Value Table
Notes
19
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER DATE: 11-1-06
DEERFIELD, 3RD ADDmON START71ME: 2:25
2007 RECONSTRUCTION PROJECTS
ElK RIVER, MINNESOTA
LOCA 710N: 192nd Avenue Northwest.
Sample
#
Boring complete to 4 feet.
No water was encountered during drilling.
LOG OF SOIL BORlNG
BORING #:B-11
END 7lME: 2:52
METHOD: 31/4" I.D. Hollow stem Auger
CREW: EDfNF
ELEVA 7l0N: NOT AVAILABLE Pa e 1 of 1
N Water
Value Table
Notes
9
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-5078 CITY OF ELK RIVER
DEERFIELDr 3RO ADDmON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA 7l0N: 191st Avenue Northwest at Xavier St NW
I
I
I
I
I
SM
4.0
Boring complete to 4 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-1-06 BORING #:8-12
. START71ME:2:10 END 7TME: 2:19
METHOD: 3114" 1.0. Hollow Stem Auger
CREW: EOINF
ELEVA710N: NOT AVAILABLE
N Water
Value Table
Notes
9
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER DA TE: 11-9-06
DEERFIELD, 3RD ADDmON . START lIME: 10:49
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA lION: 191st Ave NW & Zane St
I
I
I
Soil
Desai tion
.S" Bituminous Depth. 7" Aggregate Base.
SM ILTY SAND, fine to medium grained, w/a trace of
RAVEL, reddish brown
Till
Boring complete to 4 feet.
No water was encountered dUring drilling.
Sample
#
LOG OF SOIL BORING
BORING #:8-13
END lIME: 10:54
METHOD: 3 1/ 4ft 1.0. Hollow stem Auger
CREW: EO/NF
ELEVATION: NOT AVAILABLE Pa e 1 of 1
N Water
Value Table
7
Notes
NMC = 11.8%
%,#200 = 30.2%
I
I
I
I
I
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507BCITY OF ELK RIVER DATE: 11-9-06
DEERFIELD, 3RD ADDmON . START TIME'10:38
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA710N: Baldwin St NW, N of 190 1/2 Ave NW
LOG OF SOIL BORlNG
BORING #:B-14
END 71ME: 10:44
METHOD: 31/4" 1.0. Hollow Stem Auger
CREW: EO/NF
ELEVA 710N: NOT AVAILABLE
N Warer
Value Table
sample
#
Notes
Boring complete to 4 feet.
No water was encountered during drilling,
19
4.0
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER
DEERFIELD, 3RD ADDmON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA7TON: Baldwin St NW
Boring complete to 4 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-9-06 BORING #:B-15
. . START7IME:10:23 END 7TME: 10:32
METHOD: 3114" 1.0. Hollow Stem Auger
CREW: ED/NF
ELEVA710N: NOT AVAILABLE Pa e lof1
N Water
Value Table
Notes
14.
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-5078 CITY OF ELK RIVER DATE: 11-9-06
- -- -. - -- DEERFIELD, 3RD ADOmON - START 7IME:-l0:00
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA TION: Baldwin St NW
Soil
Desai lion
" Bituminous Depth. 3" Aggregate Base.
ILTY CLAYEY SAND, fine to medium grained, w/a trace
f GRAVEL, grey Ibrown.
ML ILT, wI fine grained sand, brown.
SM' ILTY SAND, fine to medium grained, wla trace of
RAVEL, dark brown. .
Boring complete to 11.5 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
BORING #:8-16
END lIME: 10:23
METHOD: 3 1/4 n 1.0. Hollow Stem Auger
CREW: ED INF
ELEVAlION: NOT AVAILABLE Pa e 1 ofl
N Water
Value Table
Notes
9
18
5
15
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER
DEERFIELD, 3RD ADDITION
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA710N: Baldwin St @ 190th Avenue NW
4.0
Boring complete to 4 feet.
No water was encountered dUring drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-9-06 BORING #:B-17
. . START 7IME:9:42 END TIME: 9:47
METHOD: 31/4n 1.0. Hollow Stem Auger
CREW: EO/NF
ELEVATION: NOT AVAILABLE
N Water
Value Table
Notes
NMC = 6.9%
12 Vo,#200 = 13.7%
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER
OEERFIELO, 3RD AOOmON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA710N: 190th Ave NW
LOG OF SOIL BORING
DATE: 11-9-06 BORING #:B-18
. START71ME:9:49 END 7TME: 9:54
METHOD: 3114n 1.0. Hollow Stem Auger
CREW: EO/NF
ELEVA7TON: NOT AVAILABLE
N Water
Value Table
. Sample
#
Notes
Boring complete to 4 feet.
No water was encountered during drilling.
13
I INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER
DEERFIELD,3RD ADDmON
2007 RECONSTRUCTION PROJECTS
I ELK RIVER, MINNESOTA
LOCA7ION: 189th Ave NW at Elk Lane
I
Boring complete to 4 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-9-06 BORING #:B-19
START lIME-9:30 END lIME- 9:40
METHOD: 3 1/4" 1.0. Hollow Stem Auger
CREW: EO/NF
ELEVATION: NOT AVAILABLE
N Water
Value Table
Notes
29
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-5078 CITY OF ELK RIVER
DEERFIELD, 3RD ADDITION
2007 RECONSTRUCllON PROJECTS
ELK RIVER, MINNESOTA
LOCA710N: Dodge St NW between 189th Ave NW &.190th Ct NW
I
I
I
Boring complete to 4 feet.
No water was encountered during drilling.
Sample
#
LOG OF SOIL BORING
DATE: 11-9-06 BORING #:8-20
START TIME: 12:22 END 7TME: 12:29
METHOD: 3114" 1.0. Hollow Stem Auger
CREW: EDfNF
ELEVA7TON: NOT AVAILABLE Pa e 1 of 1
N Water
Value Table
Notes
16
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-507B CITY OF ELK RIVER DATE: 11-9-06
DEERFIELD, 3RD ADDmON . START TIME: 12:14
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA lION: 190th Ct NW
Boring complete to 4 feet.
No water was encountered during drilling.
. Sample
#
LOG OF SOIL BORING
BORING #:8-21
END TIME: 12:19
METHOD: 31/4" 1.0. Hollow Stem Auger
CREW: ED /NF
ELEVATION: NOT AVAILABLE
N Water
Value Table
Notes
NMC = 10.00/0
10 %<#200 = 29.2%
INDEPENDENT TESTING TECHNOLOGIES, INC.
PROJECT: 06-5078 CITY OF ELK RIVER
DEERFIELD, 3RD ADDmON
2007 RECONSTRUCTION PROJECTS
ELK RIVER, MINNESOTA
LOCA 7l0N: Dodge St NW, North of 190th CT NW
Boring complete to 4 feet.
No water was encountered during drilling.
- Sample -
#
LOG OF SOIL BORING
DATE: 11-9-06 BORING #:B-22
START lIME: 12:00 END lIME: 12:09
METHOD: 3 1/4" I.D. Hollow Stem Auger
CREW: ED/NF
ELEVA710N: NOT AVAILABLE
N - Water
Value Table
Notes
9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
XXI. APPENDIX 8 -INFORMATIONAL MEETING
A-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CITY OF ELK RIVER
INFORMATIONAL MEETING MINUTES
DEERFIELD 3RD ADDmON
ELK RIVER CITY HALL
TUESDAY, DECEMBER 5, 2006
6:00 PM.
1.
Attendees
See Attached Sign-up Sheet
2.
Presentation
City Engineer T eny Maurer went through the attached PowerPoint presentation. He
indicated that the project being discussed this evening is the reconstruction of roadways
within the Deerfield 3rd Addition. Together with the reconstruction, street lights and a
storm sewer system would be built. Also, sidewalks are being considered as part of the
reconstruction project.
3.
Questions and Answers
After the presentation. WaS complete, the informational meeting was open to questions. The
following is a summary of the questions asked and the answers given:
Q: There seems to be a substantial amount of parking in areas of the neighborhood,
especially along Baldwin Street. How will this be handled; will there be any
restrictions with the new street?
A: Generally, the City's practice is to not regulate parking unless it becomes a problem.
Periodic parking along the street will generally not pose a situation where parking
will need to be regulated.
Q: I see the sidewalk thickness is 4 inches and the pavement on the road is only 3 ~
inches thick. Why would the street only be this thick, when the sidewalk is 4 inches?
A: The street strength is provided by both the bituminous pavement thickness and the
gravel thickness. Since gravel is readily available and generally much cheaper in the
City of Elk River, we t1y to find the best fit for the combination of gravel base and
bituminous surfacing to meet a 9-ton design.
Q: Are sidewalks up to the. City Council for approval?
A: The Council will give the final direction for the placement of the sidewalks. They
have given general direction in the past that in all reconstruction projects, they want
pedestrian facilities to be looked and determined if they are possible to be installed.
Q: Will we have a chance for future meetings to talk about sidewalks?
A: Yes, tonight is just an opportunity to introduce the issue. It will be discussed
further at the public hearing. The Council could give direction there, or even wait
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Deerfield 3rd Addition
Informational Meeting.
December 5, 2006
Page 2
until final plans are completed and a walk-thru, so that further discussion on the
issue can take place.
Q: You .presented estimated costs. What if the contractor bids substantially less?- Will
the assessments go down?
A; No. The assessments are proposed at a unit rate. As I have indicated in the
presentation, the Council's desire is to try to assess 1/3 of the cost. Due to the
construction of a storm sewer system and sub-cut that is necessary in Deerfield 3rd
right now, we are projecting that the assessment will only cover 26 - 27 percent of
the cost. If the bids are lower, the percentage that the assessments cover will just
get closer to the targeted goal of one-third of the total cost.
Q: Are the sidewalks and retaining walls included in the estimate?
A; Yes
Q: What areal properties benefit more from this project?
A; This project is really only a benefit to the Deerfield 3rd Addition. Storm sewer is.not
designed for any areas outside of the Deerfield 3rd Addition. Sidewalks are deemed
to be a neighborhood benefit and not necessarily of regional significance.
Q: Where does the City come up with their portion of the funding?
A; The City has a street infrastructure fund and they will also have the ability to bond
for their portion of the project.
Q: Who usually bids these projects and are they competitively bid?
A; Yes, it will be competitively bid. Since this is mostly a street project with a
substantial amount of dirt work, I would guess that either a grading contractor or a
street contractor would be the general for this project.
Q: I have heard that the original developer is still in legal trouble with the City, and that
the City is trying to get repayment for some items from the past?
A; I have no knowledge that there is anything ongoing with legal action against the
developer. I am aware of the action that took place a number of years ago, where
the developer had to come back and correct some of the deficiencies in the original
plat, such as tees buried in building lots.
Q: Is the developer responsible for the shoddy storm sewer system?
A; The developer built the storm sewer system that was approved and was based on
the standards at the time. The developer was not required at the time of this plat in
1986 to construct an urban-style street with concrete curb and gutter and a storm
sewer system. It was rather more of a rural-type development with bituminous
streets, catch basins, small culverts and spillways leading off the street through side
yards and rear yard areas.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Deerfield 3rt! Addition
Informational Meeting
December 5, 2006
Q: I live at the comer of 1915t Avenue and Baldwin Street. There seems to be a
problem with the curve at that point. Every year there are people that go off the
road. Can the alignment be changed there?
Page 3
A; The alignment cannot be changed unless more right of way acquisition is provided.
We could look at potential ways to provide traffic calming to lower the speed of the
traffic so that the curve in the road is driven at a safe speed.
Q: Baldwin Street is the most congested street with the highest volume of traffic: What
can be done in this area?
A; I am currently working with representatives of the Police Department and Street
Department to come up with a traffic calming policy for the City Council to
consider. Some of the items we are looking at are "chokers", where the street is
narrowed to slow traffic dovm over short stretches of the street. We are also
looking at the potential for installing speed humps and traffic circles at intersections.
Once a final policy is approved by the City Council, items contained in the policy
could be considered for inclusion in the street reconstruction project.
Q: Are handouts of the presentation you showed available?
-
A; Not at this time. It will be a part of the feasibility stUdy. I typically wait until the
feasibility study and the information is provided to the City Council before
providing it to the general- public;- That way it avoids Couilci1 members receiving
questions on something they have not seen.
Q: Can you explain options for paying the assessment?
A:. The assessment can be paid in full when it is levied to avoid any interest. Partial -
payments can be made to lower the yearly annual payment. The assessment can also
be prepaid at any time during the life of the assessment. However, it is somewhat
different than an installment loan. If you pay off the assessment at any time during
its life, you will be asked to pay the full interest amount for the year in which you are
prepaying the assessment. Therefore, if you decide to prepay the assessment during
its life, it is better to do it later in the year, but preferably before November, because
the City will be certifying the next annual payment to the County for collection.
Q: The City approved sub-par work in 1986. Will the City increase their funding,
thereby lowering the assessment to the property owriers? - - - - - -
A; The City approved plans in 1986 were in compliance with the standards of the time.
As I indicated in the presentation, this is the last development of an urban nature
that was allowed in with the standards. After this development was completed, the
standards were changed. As you can see from the adjacent neighborhoods, they
were built with concrete curb and gutter. The street section was also changed to
add a second lift of bituminous. Therefore, it is unlikely that the City would
contribute anything additional thereby lowering the assessment, based on the
argument that the original construction was sub-par.
Q: We have been here since the plat was originally built. We were told by someone
that the first layer of blacktop was not the completion of the project; they would be
back and put in another layer of blacktop. That never happened.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Deerfidd 3m Addition
Informational MeetiBg -
December 5, 2006
Page 4
A:. The approved plans for this development and the record drawings on file with the
City show a street section with only one layer of blacktop. That was the standard at
the time. I don't know where the information would have been obtained to give to
you that there was two lifts of blacktop planned. The developer was never required
to place two layers of blacktop.
Q: Why are not surrounding neighborhoods being included?
A:. The surrounding neighborhoods already have curb and gutter and were built to a
slightly different street section. Also, the size of the project, the amount of monies
available to do reconstruction from the City's standpoint, and the amount of needs
are vastly different. The City takes on reconstruction projects in odd-numbered
years. The size projects and-the areas that they believe are in the greatest need and
can be funded.
Q: Why B618 curb and not surmountable curb?
.A:. The barrier style curb provides better -drainage with the higher curb. It also
provides an edge for snow plowing activities, and with the barrier style curb Y01.!get
a much smoother and more gradual driveway approach. The barrier style curb.can
be used because the driveways are all set and can be identified. The surmountable
curb is used in new developments because the homes are not built yet and the
driveway locations are not yet established. . - -
Q: Why would you do a small portion of Elk Lane and not go further?
A:. The project ends at the plat bounda1y of Deerfield 3rd Addition. The area further
east on Elk Lane is in the Elk Hills Addition. That will be reconstructed at some
point in the future; at that time, the curb and gutter and street section would be
continued easterly.
Q: Why would the cost to the homeowners not go down if sidewalks are not built?
A:. As I discussed before, the assessment is set on a unit basis with the hope of
assessing approximately one-third of the cost of the project. If sidewalks are
included with everything else I have shown, the assessment will only cover about 26
percent of the project estimated cost. If the sidewalks are removed, the percentage
the assessments cover would increase and get closer to that one-third goal.
Q: What is the typical location of the sidewalk within the right-oE-way?
A:. Typically we would like to see sidewalks located within one foot of the right of way
line; however, with the topography, vegetation and other issues in the Deerfield
area, that certainly will not be possible in many locations. We would start a design,
hoping to have the sidewalk out near the right-of-way bounda1y, and then would
adjust as the topography and vegetation requires, trying to find the best fit to
minimize disruptions and removal of vegetation.
A:. Is the project a certainty?
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Deerfield 3rd Addition
Informational Meeting
December 5, 2006
Q: The project is never a certainty until the City Council acts on the project. There will
be a public hearing and an assessment hearing, at which the City Council will take
testimony from the public and will make determinations at the close of those
hearings whether or not to proceed. Once the assessment roll has been adopted,
the contract can be considered for award. At that point, the project is a certainty.
Page 5
Q: Who is responsible for sidewalk maintenance?
A:. The residents who end up with sidewalks in front of their homes would be
responsible for snow removal. The City would be responsible for repair of any
damaged sidewalk.
Q: I have a sprinkler system in myyard. Who is responsible for moving and! or
relocating it? .
A:. We will have many opportunities for you to let us know where your sprinkler system
is. It will be up to the homeowner to either remove the heads or locate the heads so
that the contractor can remove them. We will have the contractor do that with due
care. . We will not salvage the plastic pipe between the heads. .After the project is
complete, you will be asked to get a quote from your sprinkler company for the _
repair of the sprinkler system. The City will reserve the right to review the quote
prior to authorizing payment. We will either pay the sprinkler company directly
based on an approved quote, or we will reimburse the homeowners if they paid the
sprinkler company. . .
Q: Why has it taken 18 years for rehabilitation of the roads in Deerfield?
A:. The City initiated a pavement rehabilitation program in the early 2000's. In the odd
numbered years, we do construction projects. There are certainly more needs for
construction in the City than there are monies available. We are slowly getting to
some of the worse streets in the City for reconstruction.
Q: Are .there issues of tree removal within the right of way?
A:. There will be a few trees in the right of way that likely will need to be removed,
especially if sidewalk is added. City policy would not replace trees that are removed
from within the right of way; however, the removal of the tree would be a cost to
the project.
Q: What is the life expectancy of the road?
A:. The road certainly will not be reconstructed in anyone's lifetime within this
audience; however, during the life of the road there will be sealcoats applied and at
appropriate points, maybe 20 years out, the surface would need to be milled and
overlaid to rejuvenate it.
Q: What if someone wants to have their driveway replaced?
A:. Whenever we get a bid from a contractor, we always ask if they are interested in
doing private driveways. Some contractors are, some are not. If the low bidder on
this project is interested in doing driveway work, we will notify the public through a
newsletter. If you are interested in getting a quote, our inspector will work with you
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Deerfield 3rt! Addition
Informational Meeting_.
December 5, 2006
Page 6
to determine how much of your driveway replacement is a function of the street
construction, and will be paid by that project. You can then negotiate a price with
the contractor for the replacement of the remainder of your driveway. . If you reach
a reasonable agreement, the contractor can then replace your driveway all at the
same time. The City will facilitate getting the contractor and you together, but will
not be party to the agreement to replace a driveway.
Q: There are a few old lights on power poles. Will those all be removed with the new
decorative lights?
A:. Yes, it is my understanding that all that's on the poles are lights which will be
removed. Therefore, I assume the Elk River Municipal Utilities will remove the
poles also.
Q: How long will we be out of our driveways when the concrete curb and gutter is
poured?
A:. Typically, it would be 4 - 5 days. Some contractors will allow you back in as early as
three days. The maximum I have seen is 5 days. The contractor who pours the
curb will tell us how long they want people to stay off of it. As long as it is a
reasonable time line, we will follow the contractor's recommendation.
Q: How will the project be phased?
A:. We will give the contractor some general guidelines in the specification and look for
the contractor to give us a schedule to review and approve. Typically, the
contractor will only be allowed to open up and sub-cut a short portion of the
project at a time, backfilling as the area is completed, and placing gravel. I am sure
the contractor will want to this to get the area sealed up and draining so that they
don't lose their work in the event of a rainstorm. We will need to give the
contractor a reasonable amount that can be open and constructed to gravel before
we require curb and gutter to be placed, due to the expense of mobilizing a concrete
company.
Q: What will be the length of construction?
A:. There will be some portion of Deerfield under construction throughout the 2007
construction season. As I indicated in my presentation, the final lift of blacktop,
final repairs and restoration, will be done in the early -sU.mrrier of 2008:
Q: Will our property values be driven up by the assessment?
A:. The County has always indicated to the City that there is no direct correlation
between levying an assessment against a property and the increase in the property
value. However, as we all know, property values continue to rise and I would
expect that the property values in this area will also continue to rise. Should the
assessor come out to reassess the property, certainly having curb and gutter, lighting,
and potentially sidewalks throughout the neighborhood will affect the property
values.
4. Adjournment
I
I
I
I
I
I
I
I
I
'I
I
I
I
I
I
I
I
I
I
Deerfield 3rt! Addition
Informational Meeting
December 5, 2006
Having no more questions, the informational meeting was concluded at 7:55 p.rn.
Submitted by,
Teny J. Maurer
aty Engineer
Page 7
I
I
I
I
I
I
I
I /j:,? ~r;
I ~:';
I ~.
I
I
I
I
I
I ',.fo 5,'/t,-
O/IfL5 i ,I ~e ~,.(/
I ~"t1H'1 ~Olra /!J
I s c v~ ~tf\ ,~'b ~i" C:.~-e
I slgnm
Informational Meeting
PROJECT NAME:
OWNER:
DATE OF MEETING:
Deerfield 3rd Addition Street Reconstruction
City of Elk River
Thursday December 5. 2006
Mailin Address/Zi
ICfZlG,
/ggbq Oot
\q', ,,(
it ;-1 r. IS'I <)lr )lve
tv
7h1 U;, ~t:
}?: J7 ~A ~I 1-
~~~c~
/1/ '(&'
/9r)3 24"-f 5f N'v-J
L~I~ 2A.Je. ~T'
;1;4/
('1'Z.-~ X~I~>1 t.J;;J
..,~ . .,
~-kb 8bi( cft~N4"J4v'
~A'~/ 7' ~""l~
, , c:.: (." ',q" ,fi " \
I 1.;L=o ,:p.. 0 ."tV6 AJ., Vv
/ //YS- /9;J~cI~ /VW
( II ~;.J l q J I1d Ln I') L.)
~1 ..J~ I ..
l \:) - t &-' ~ ",-l"v(
Phone No.
--t c. 3-G-,e/:( .(io'f~
~ (;-~- '-tLf f.-/OJJ...
;;;, '7'-1 - 117 '-
it '1 / . .s-", r L
'1lf I-~ f;- ') I
44\ -34-~2-
4-"/ ~~ l"r''';v-'''
1 l~Gc.
)......u ~O$4-,
t-f'-ll <551!
c9~/- / SlY
G33..0l\j
L(4l' 7;} \..( K
I
I
I
I PROJECT NAME:
OWNER:
DATE OF MEETING:
I
I
I
I
I
I
Informational Meeting
Deerfield 3rd Addition Street Reconstruction
City of Elk River
Thursday December 5. 2006
Mailin Address/Zi
90;-' d (Ay;'s lu-eM
Lr)
I )
I
I -X:N j:1JI<
\. )
\" 0 \
I -'---.1..'::. ~'~/ G'y:::> ~.-
-"'-J'
I
I
I
I
I
I
, fl' '\ '\ "V
f \J ;7")0\ D
E( k La.V\<L NW
\ o.A-' I' R./ ~' ru lJ
,
,
Slgmn
Phone No.
It- 5'- t./Vl- 06 f
7/;3- L/#rf~3
11,~ r-:J-V(-9/
7(os,300~ ~7)t)
~/;J ,.3t7-o/r
;e $tV/ ~ts '
7b ..' '/-d
'7&.3.,;(1/ - /~ 'L
16?; -aq l ~.o q6b
I
I
I
I
I
I "C~;~\ [.'. L-() xe;"" '( b l^-t'" (\)
_ ~ . /1 ./1
I !/~4,?fr'j "fe.'
.~;',/~IZ.1 t;f7
I
I
I
I
I
I
I
I
I
I
I
I slgnm
Informational Meeting
PROJECT NAME:
OWNER:
DATE OF MEETING:
Deerfield 3rd Addition Street Reconstruction
City of Elk River
Thursday December 5. 2006
Mailin Address/Zi
Phone No.
i I ~ .:2 -, c;;. I v' L ",'
I \,-' ,/(;;/. (....-1 1'---.. ct.,y\ -e r I "'-.J
1(" 3 --:) ipS.. /'-P-
.'
1"3~ ,~3<<??
G3YY/- LrJI
/tj.?~6' Z
1/ l 7 ( /1' Z. /fc./<: At,J
, ;2 I.) ~~ LN /J(})
or-ta-c
offi-
3 CJ) m
CD ::J en
S" CD CD
CD en
r-ta - -
Oleo
CJ) :J
'< --
o ::J
C 0
:J
~ ~
~n>. n> N
~ n> ~. Q ~
Q..,~OQ~
Q. = ., = ......:J n>
~ n> ..~. ~ rl'\ .....
...- . ..... n> ., .., ..i. ~
QQ.~=~O
=W~a~a
::!. ...-. n> n>
....... 0 ~
=
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
aJ
aJ
;..
~
00
t'-
Q
Q
M
= "'Cl
Q -
-~ ~
~~
UU~
= QJ ~
b -OJ !4-:
rIJ. ,.. ,..
8 ~ ~
~ ~
~
=
Q
.-
~
.-
~
~
-<
~ ~
Q) Q)
Q) Q)
e e
co '0,'0,
Oee
Oww
N ~~__
-...-
L(') .- co-
. () ...-
Ci3 _ C/) .
.c ~ -
E ~ Q)
Q) ::J E
() co Q)
Q)~~
o ~C/)
t= E
Q) .-
1--'
~
Q)
>
.
I I I 3~
(/)(/)(/)-00
~c.:~""-o
cococoOo
CO~CO<en
r-+c:::r-+CDCD
C~~3c..
'g.enc.:CDC/)
r-+ r-+:::Jr-+
en ::r r-+ ...,
en en CD
CD
r-+
. . . .
~~
o Q)
..., r-+
3 ~
C/)
CD
~
CD
...,
C/)I
Q) --
:::J ~
;::+0
.~ ~
'<
C/)
CD
.~
CD
...,
. . . . .
Qo-o-om
c: 0 ., ., en
co::Joo~
enen-c""C3
r-+r-+oo
-- ., en en Q)
o c: co co cor-+
::J (")
en~c..c..c..
0(/))>-0
::J (") en .,
- ::r en O.
en co co ~-
enc..enCO
c:c:en~
mCD~()
::J 0
r-+en
en en
)>'
CO
CD
::J
c..
Q)
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
co
Q)
s....
<(
I ·
u
Q)
o.
s....
C1.
.
CI
111111
lilt
g~
1-11:
IIII-
1-'"
IIIZ
1110
lICU
1-111
IIIl1C
~I
.
.
.
CJ)
r-+
..,
CD
CD
r-+
en
--
:::s
<
CD
..,
'<
"'C
o
o
..,
('")
o
:::s
0.
I)>
0.
00.
c --
CD ~
r-+ 0
o :::s
~ 0
o ......,
~CJ)
-. r-+
:::s 0
co ..,
.3
CJ)
CD
~
CD
..,
('")
o
:::s
en
r-+
..,
C
('")
r-+
CD
0.
--
:::s
('")-10
c ::T CD
a-CDCD
""---=1,
co Q) --
C en CD
r-+ r-+ -
COco.
..,..,W
Q) C- a.
:::s Q) )>
0.:::S0.
en 0.0.
r-+ CD --
o < ~
.., CD 0
3 0- :::s
en "'C 0.
CD 3 CD
~ CD <
CD :::s ~
.., r-+ 0
~"'C
-- CD
s:o.
o 5-
c
r-+ ~
('") (0
o (X)
:::s en
('")
..,
CD
r-+
CD
--
r-+
--
o
:::s
~
(0
(0
~
-c
..,
Q
. - ."" -
CD
o
. I
I
I
I
I
I
I
I
.1
I
I
I
I
I
I
I
I
I
I
I
I
--
en
. I
o
..,
'<
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I....
(])
~
(]) en L-
en -0 co (])
CD CD I.
~ -~ ~ co
I.... > ,u >
co ~- E . >
I. 1'1'
-- \U CD
C ; :c
co .c. e
en=c..
--
~ c
en ~
CD 0
c C
-- ~
-
= 0
<(z
. .
en
~
::::> C
~ ~
~-o
wE
~C)
.0 C
--
-0 en
CD --
~ ~
-- CD
ffi E
s.... 0
~ en
s....
OCD
~ ......,
en co
-- u
..c 0
E 03
CD s....
~ ~
en co
J)~
. .
., ;0
~ CD
(") Q)
:::r"
-- '<
:J Q)
CO .,
en 0..
~o..
CO .,
CO ~-
r-+:J
~ Q)
=:co
-CO
.,
CO ~
3Q
Q) en
-- r-+
:J 0
-;, .,
:J 3
"2.:;E
Q) Q)
(") r-+
CO CO
.,
:J
o
r-+
.
.
::;:s:
., --
o :J
C --
co 3
::T N-
., CO
CO en
Q) r-t-
., 0
............ .,
en 3
--
o..:;E
CO Q)
,<r-+
Q) CO
., .,
o..:::t!
en 0
:;E
--+..
.,
o
3
en
r-+
.,
CO
CO
r-+
.
I
I
I
I
I
I
I
.1
I
I
I
I
I
I
I
I
I
I
I
(") -u
o .,
:J 0
en-c
~o
c en
(") CO
COo..
o..-c
--
:;E-c
-- CO
r-+
::T(")
en 0
-
r-+ -
co., CO
(")
CO r-+
r-+ --
., 0
CO :J
(") en
0'<
:J en
~CO
2 3
(") r-+
~o
o c-
:J CO
en
-I
.
o
-,
3
en
CD
:E
CD
-,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
L-
CD
S
CD
C/)
E
L-
a
I ·
C/)
C)
c:
--
I ·
en
--
><
w
II:
IU
l:
IU
III
~ z: III
o U...
I- 1-0
III C z:
Uz
lD 1II C
! z:E
I- --
III !;!
j( _III
III lC C
111111
II IJ
... €I
I
I
I
I
L-
(])
s
(])
I(f)
I
1
1
E
L-
a
I ·
I(f)
1
I
-c
(])
en
o
c.
o
10:
1
I'
1
I
I
I
I
II: II:
III
III ~
~ III
. ]-r'~:" r" . "'" III I/)
I/)
E E :I:
'. , / :1:111 II: UIII
/ II: 1,)..1 0
0 ~o ~ ~..1
~ crz I/) I,)~
....--1 I/)
1:1 Uz l:l aZ
l:Ier III Iller
Z zE III Ill:!;
,/ j: j:z 0 0-
/ III 1/)- a. a.Z
l( _Ill 0 oUi
~er II: lI:er
III 111111 a. a. III
--
l:l
....._-;-...--' r:---- ~ .
I I !~i III
EFlL~ \ ,',,' .~ ;:/-
~"" - ,---.. ~--' ~-_.~.....,.\". \,'
I" . . , ,/ ',~ \/..-...,..........--.....-.
f,~~_:'=-i . ..".. .. "\',/-""
"'. ; !=11~~jiNi1z..=~~~,....:~..\,..~/-". ~.......-
r-...... " . \. ..,
\ /' I . \ \ \ ,r \ \. ..J.S
. ...r-.._.-.--.-.......--~.. \'. I :INn
. r- - \ \. / ,-' ;' ! ,-- ;' / -:;:---.- ---. .. .. ,-- --- -',
I '- f :' ! ! / ,/ / /! j
i . ////:/// au
I ~ . . -" -" -" I -" ';:=' ~-_.... -..
(< / /' ;:-.:". <'. / /;/ / / /!~ :<...-.-..)
" ' /. ..,/ ' , t. -,. ,f f -..---.---.-= .
! ' '',J'' ..!I.~ \./< " !""{l / / .,<:.,./.,// ,,/ :/ ,/.,_....... -:~;. --'.. r...
'1 ' ~ ,,!, ",/ / ~~~. ...., f '-1.......-----'
. . ' .' ~Q '- \ I ! /""/,!! ~&,'" . 4 '. ":. / ! t..,;-.. ," . I'
_ '. ' O:I~ . . . I I .I f l' f . iii",.. '" I ,. ,. f '. j , ---...-,
-j- ....!J/ 1;. ,.~" . >' :~<;:~~-:~:::':'./../ )<///Of~...l~::../././ / {-...-.....:
.... .._ ....___ . '....., -r.y '\ /. \ Iff ....t,..,J J :' ;" / ! / '; "',,' J ................
..~'IIMa1!g. ___.. '\ / '. \ ! / /. ....liii. i I / f'-J,;' ,',^ "', ..: ",
1 1 \-,,~ /4.,/'.(' \, \ \ II! / / I ;.~~~,..j / '_>.- ,/ /';-. ". .r
i--------"U1 " ,\" ,I f' --,f /' /. i' J.., J i
:Ir..--..,-,-l~=-::.:.:>":'\\, "./~..L'-rL/..{./' /'f-~-=~r-(\ \( / / // / J.J'+'~., I'.
.> . I ,'. /' \ \ \ v t. _I" / ' .,.
^'r--~---lC(: ~) , \ ..~.._..j.. / / "', i I \, \ / \ "-',!. \ .~v '1
.. t~, _ ~ ~ _._ ~zCllt- _h _ _ ~\. ....,.. \" ,! I ./ '7-_ , , .,. '. i" '-.", : I UI . I
l ..'-,-".~.'.,! . / / -'ill- 'rL'1 :...... \..1 _...J I' i ~ \. ".i
...;... ':,/./-'<:....),./ /""" ":' ! ! I i ~~' 'Il!: ,I ! ~,~ ' Ii
\.' . / / ;. >.~: /.! i :' I '._-_..'~ O:J I :::..,. ~":"''''''l'': a; !
..~.!.;\-.:=~.......~.,:l..:;:"..,S;'~,,~:.'.,~....~JI'1_....._...O,...'.....".,:,..Ci-...,.,....., :':'::I[ .,.....:":.:;j ,/ ///',. '".,':."':'-=:;-:---' _.._L__.__ ~- ,8 "! - ,_.1 : ~ I
\..> . , i r ,1 I -T"r-:-'/ -, . L ~r' ':U3li:is~9cioa- - ;--,::'-: .....-....
. : I ~__ i I ....\ \:..._.\ I '
/
!
i
6)
iJ
...
r" ~,~,....\
'--i'
~~_ ---i:~-
-1',
J''''-''''
I
I
I
I
I
m I
x I
--
en
. I I
--
:J
co I
() I
0 I
:J
. - (2 I
- ......
--
--
. I I
--
0
:J I
en I
I
I
I
I
I
I
I
1
1
1
I
1
1
I
I
I" ..
1
1
I
I
1
1
1
-u
...,
o
-c
o
en
CD
c..
I
I
I
I
I
. I
I
I
I
I
I
I
I
I
I
I
I
I
I
3
-c
...,
o
<
CD
3
CD.
::J
. I
en
... ...
s::uO
)>AJO
---jOO
(JuGJ
IOfTl
(J')
m[Tl)>
XO<
- fTl
~;;;;o
ZO"'-..
C):J:!:;:E
O(j)
'1
OJ
OOJ
o .
o
G")
[Tl
---j
o
...
-<
"'a
-
n
:I>
r-
en
...
::a
m
m
...
en
m
n
...
-
o
z
z
o
Z
~
fTl
)>
~
Z
GJ
()
i'J. CO 0
- , c
(J')();o
m (j)
,'fTl
[Tl)>
O(j)
)>---j(j)
UG)(Jl
U::;o
;0 )>
o z
;$;c
o j:
(j) ::;0
crn
rno
GJ ::;0
;0;0
)>0
~~
s::
X
-1
C
)>;0
GJfTl
GJ_____
::::0,
fTl<
GJZ
)>~
-10,J
fTl(Jl
o
~0,J
(j)o
fTl~
tv
~
;T
[Tl
)>
;0
z
C)
o
o
c
::;0
(J')
[Tl
s::
X
---j
C
::;0
[Tl
s::
---j<
)>~
Om
A~
o
glN
)>(J1
---j"s
c::-~
Z =
QG")
0::;0
fTl)>
Zz
-1c
)>,
S)>
::;0
~~
6 ·
[Tl---j
I
(j)()R
-0
OZA
[T1()rn
~;o-<
)>fTl
,---jOl
A[Tl _
OJ
\
tv
o
o
~
!'J
o
o
~
I
---
Rog
GJ Z (j)
COO
-1::;0 0
-1[Tl
fTl-j
;om
::::0
o
~
~.
I
01
~
~
I
OJ
(J)
. I
...,
"CO
CO
. I
...
Ol_rA
O.
(J)
CO
o
. I
--
...
-'
~
I
OJ
o
::::J
..j::.
I
01
;0
o
~
1
1
1
I
1
1
1
.1
1
1
I
1
1
1
1
1
I
1
I
I
I
.....
I co
C N
I co ~ 0
-- s...... C
s...... +-'
+-' 0 ..... 0
I en ~ N -- . -0
(]) ('i) +-' (])
t)
I -0 +-' :::J -0
(]) (]) E
s...... (])
c..~ 0 +-' (])
I en
-000 s...... C C
'+-
- 0 (])
I en -- c
:::J..c 0 t) ..c ~ -. .- '.-- ....:.. - - - -
~ '..c +-' ~
--
o ~ -- ~
I +-' - -
t) - co -
co --
+-' C (]) co ~ ~
S ~
I c 0 en (]) en
0 -- (])
(J) +-' +-' -0 -
(]) -0 -
I -- t) -- co
-C +-' (]) -- en
t) c en ~
-- (]) :::J s...... (])
I en +-' (])
s...... - ......, en +-' 0)
-- C +-' (])
-0 0 ~ co s...... c
I +-' t) --
- t) 0== c
--
t) s...... -u c --
I c c 0 co
-- s...... co +-'
:::J en CO,+- t) (])
I 0 (]) c c.. (]) s......
u~ -0 - -0 (])
I -- - (]) -- E
~== :::J..c ~
:t: t) o 0 0
U~ .....
I U+-' (0 CJ)
I . . . .
I
.....~_.
_0"
! ",'
'r::."
. ....~.~
i i
!..-....:
l
.......-j . !
-,--,-...L.-.-..,..-lj I i I : f "<:\J.\ \_\.C'TL/",?
, / /. / ! /.. DODGE! STIiEET i= >.-\ \ J..._.L.i .'
, " "". / ...., ...------:--1" -""""";1 .,.~.- ..~
-"to . ..........,:,.....t' >", . ;.a;; ~
:>'>>".~:~::.==,-..,:~::.> . . ,
\ I;i;;,' "<,, :- r-;~2\
')/9:~~~!~'~\'~~:}' ~.
i .,I~' . ::~}J:~~-/i> ~
. ' ,~-j -"'..../' i
,I ii, I ,"-' I
. .I ,/r--'~-~~ ....____J..-...
,_/1L--1
".
-.--.--
/ i
-------r /
, ,
i / .'
V /
ZAN
~\
.-...-..-----1
j \
.. ". \\,
\ ~\. ~.~...
\>>:~~.l-"i-:liJ-; "
...-"'\ \
\..,\
i i
r-~
---'--,--i
r-
m
a
m
Z
a
.~.>\
\ .,.\~:.."
,;....-~ \.--
/
..! ;
8:-'--)---
~t-{---
~l-' I.
<"'';;;-4l:
'. ?' ,
m
~
1Il
j
Z
a
!
a
m
:&
..
r-
:..
"lI
::Ill
o
"lI
o
1Il
m
a
!
a
m
:&
..
...
:..
t._~.._}---
~~)-~._.
\, ~
..-...'..~...>" ~~
....-........ ;
'.. ~
/-<'jIE.:
'Ci
~/
/"
/' 1
.j~.._._.___J.__....
/
\
.~ \
I
I
I
I
I
I
I
en .1
--
c.. I
CD I
~
Q) I
~ I
en
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
en
I ·
..c
0)
--
-I
I ·
CD
CD
L..
I ·
en
::)
~
0:::
w
a
.......
0)
c
--
""0
L-
a
t)
t)
co
""0
(])
t)
co
-
c..
en
.......
..c
0)
--
-
.......~
(]) t)
(]) --
L- -
....... a
C/)c..
.
L-
(])
en >
t) a
co'--"
en~~
It).......
(]) a (])
""O-(])
l..c~
- ""0 0
::J -- 0
- () ~C')
en
c
a
--
.......
t)
(])
en
L-
(])
.......
c
. .
.
()
c
(J)
. I
CD. .
' '.- -
. ....,
CO
C.
s:
w
--
C-
O
X
'CO
(J)
I
I
I
I
I
I
I
.1
I
I
I
I
I
I
I
I
I
I
I
I
I 0
0 0 0 0\
I M ~ N If)
00 00 0\ .....
..... ..... ..... 0
I \0 t'- If) M
If) t'- 0\ t'-
If) ?""""1 0\ .....
~
I -I----.!'- .....
en M fA-
fA- fA-
0 fA-
I
0
I rfJ
~
.... ~ -
U C) - -
I 8
(])
C)
I - . ;>
0 0
;.....
I L- a
a..
~
I ~
-C C)
C)
I (]) ;..... ~
~ ~
~ rfl
co "'0 ~ ~
I 0 ~
a u "'0
E ~ ro ~ r./'J
I ;..... C) C) Q 0
-- C) bI) '€ u
~ ~ ~ ~
en · 'P""""l C) ~ ~
I C) ~ ;> ~ u
W rfl ~ 0 ~ ~
0
8 u l--;.
I ~ ~ 0
~
;..... ~
0 ~ 00 r./'J
I ~ N ~ ~
rfl If)
I
I
I
I
I
I
rJJ tIj I
rl- rJJ
,-....., ~ rl-
~ (D ~.
1..0 (D S I
0
rl- a
~ ~
(D I
f.I7 (D 0-
~O\ (J
~ 0 =:1 I
0 =:1 ~ )>
'-' rJJ g.
a I
CI)
(D
(J ~ (J)
rl- I
~. 0 -CD
0 HJ
=:1 > (J)
> I
rJJ (J)
rJJ rJJ
rJJ (D 3 I
(D rJJ
rJJ rJJ
rJJ ~ CD I
-s
~ :J
(D (D
=:1 S -I- I
rl- .
(J)
II ~.
. rl- I
rJJ
~ II
~
~ ~ I
N
0\ \0
W 0 I
~
Vl
0 N I
0 0
0
I
I
I
I
I co
I Q)
L..
I <(
I .
I c
I Q)
E
I en
I en
Q)
I en
en
I <(
I -c
I Q)
en -,
I 0
.0.."-
I 0..-
L..
I a..
I
I
I
/~
'D
i~/
a
III
IIJ
lI)
III
ll'l
ll'l
C
III
III
o
l-
ll)
C
III
0:
C
~ : I /
'y) J.S HillA~~_~ \
)..~..^<
-~;w_"';;"""----'t'-'~\ \.
a
z
III
CD
III
...
~f, \ -
"r.--'~,-- :. .
/~,..
, .;-\
\ ....--- "
.~_..-\ ~
'? ,~,
~-o".~
.13:1l1J.S 31oaoa
. r~---l--'----
l, I ,
1
I
I
-I () )> I
0 -- en I
....... m
....... '< en
Q.)
() CD (J)
en I
0 en . I
--
::::J 3 3 I
.......
-s CD
--
c- ::::J Q)
C ....... I
....... en . I
-- CD
0 ,I
::::J c.:
-c I
..., I
.0
- I
CD
() I
. I
-EI":1 -EI":1 -EI":1 " I
~ w ~ c I
~ ~ ~ ::J
-......) ~ N
w 0\ 0\ C-
o -......) w I
~ ~ ~ --
u-. 0 u-. ::J
\0 \0 0 I
0 0 0 c.c
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Q)
::J
-0
Q)
..c
u
en
t'--
o
o
C""I
I ·
c
Q)
E
en
en
Q)
en.
en
<(
r-
~
~
Q)
s
Q)
C)
Q)
Q
o
E ~
;:i 0
o V)
8 \Or-
<~
o
Q) 0
C) .
.C 0
~ V)
~ \Or-
.~ \0
~ yj-
::J
V'J.
~ ~
Q) V)
~t'--
o .
~ V)
Q)
~
V'J.
~ .
~ ~
~
.~
~
::J
~
~
.~ 0
~ ~
;:i ~
o
. .
.. '"0
Q) 0
~ .~
Q ~ ..
~ Q)
~ ~ ~
~ ~ ,J
r::/) Q) ~
~ ~ 11
Q) ~ ~
~ ~ 2
~ \.jJ ,..-4
'E'~ ~
~
~
~
.~
~
.~
.. ~
~ ::J
Q) '"0
8 a
V'J. ~
V'J. Q)
Q) Q)
V'J. ~
V'J. ~
< r::/)
V'J.
E
Q)
8
Q)
;>
o
~
a
~
I
I
I\) I\) I\) I\) I\) I\) I\) I\) I\) I\) I\) -< I
0 0 0 0 0 0 0 0 0 0 0
~ ~ ~ ~ ~ ~ ~ ~ 0 0 0 m
........ 0> 0'1 .l:lo. V.> I\) ~ 0 CO ex> ........ )>
AI I
-(fl -(fl "'C )> )> I
~ ~
-Efl -(fl -(fl -(fl -(fl -(fl -(fl -(fl -(fl )> z
ex> ........ ........ ........ ex> ex> ex> CO CO 0 0 -< z
- 0 .l:lo. ........ ~ 0'1 CO V.> ........ 0 ........ s: en
""..J V.> ~ co ........ 0> .l:lo. I\) 0 co co c: I
ex> I\) .l:lo. ........ co ~ .l:lo. 0> co ~ I\) m )> en
~ .l:lo. ex> ~ 0'1 co V.> 0> 0 .l:lo. .l:lo. Z r-
0 -I
(0 CD
w I
--I en
0
r-+ (J) ,I
Q)
~ -(fl -(fl -(fl -(fl -(fl -(fl -(fl -(fl -(fl -(fl "'C "'C -3
0> 0> 0> 0> 0> 0> 0> 0> 0> 0>
::::J 0> 0> 0> 0> 0> 0> 0> 0> 0> 0> -(fl )> AI I
::::J 0'1 0'1 0'1 0'1 0'1 0'1 0'1 0'1 0'1 0'1 0 -< -
c 0 0 0 0 0 0 0 0 0 0 0 s: z CD
Q) 0 0 0 0 0 0 0 0 0 0 0 m 0
-
"1J Z "'C ::J I
Q) -I )>
'< r- . t
3 I
CD en
::::J
r-+
C/) C1 I
-(fl -(fl -(fl -(fl -(fl -(fl -(fl -(fl "'C Z
-(fl -(fl ~ ~ ~ I\) I\) V.> V.> .l:lo. )> -I :T
V.> ........ ~ 0'1 co I\) 0> 0 .l:lo. ~ -(fl -< m
Q'OJ ex> 0> .l:lo. I\) ~ co ........ 0'1 .l:lo. .l:lo. 0 s: I
AI CD
-, Q) I\) .l:lo. ........ co ~ .l:lo. 0> co ~ I\) 0 m m
~C/) .l:lo. ex> ~ 0'1 co V.> 0> 0 .l:lo. .l:lo. 0 Z en
oCD c..
0. -I -I I
'< Q C
CD
Q) ::::J
-'-Efl I
C/)en CD
@m
0'10'1 AI "'C
o 0 -(fl -(fl -(fl -(fl -(fl -(fl -(fl -(fl -(fl m AI I
s: -
""..J ::!l -(fl ~ ~ I\) V.> V.> .l:lo. 0'1 0'1 0> Z
0'1 - - - )>
::::J 0> V.> co 0> V.> co 0> V.> co 0> 0
'*' Q) -(fl 0> V.> co 0> I\) co 0'1 I\) ex> 0'1 -
Z - I
::::J 0 0'1 0 0'1 0 0'1 0 0'1 0 0'1 0 - "'C
(') 0 0 0 0 0 0 0 0 0 0 0 z )>
CD 0 0 0 0 0 0 0 0 0 0 0 G') r-
0. I
I
co
co 0
00",,"
ONO
N ..0
.. CO N
LO ~ ..
So.... So.... LO
Q) Q) ~
..0 ..0
E E
Q) Q)
t) t)
Q) Q)
00
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Q)
:J
-C
Q)
..c
u
en
-C
Q)
en
o
C-
o
L-
a...
-
.-
t)
c
c> :J
C 0
.;:: ()
ro ~
Q) +-'
I(3
-
ro 0
c +-'
o ~
.- +-'
+-' .-
ro ==
E :-9
So.... en
~ ro
c Q)
_ u..
~
So....
roo
:J
c
ro
-,
en
c
o
.-
+-'
ro
t)
'+=
.-
t)
c> Q)
c c..
.;:: en
~ -c
I C-c
t) ro Q)
.- en ~
- C \U
..0 ro E
~ a: 0
. . . .
"""
o
0",,"
No
.. 0
LON
~ ~
~ So....
So.... ro
ro :J
:J So....
C ..0
ro Q)
-,u..
"""
o
o
N
c>
C
.-
. So....
c..
en
en
+-'
C
Q)
-c
.-
en
Q)
c::
-c ..c
C :!::
ro ~
enen..c
C C c>
~ 0 :J
a..~ 0
ro So....
Q) t) ..c
So.... '+= I-
~.C3 ~
~~ro
a.. en S
.
.
I
I
. . . . . . . I
~ 11 '1J nn OJ OJ )> )> I
-. en a.
-. - 0 0 CD
-. ..., Q) a.
'-+en 3 ::J co en <
::r.-+ (') en -. )> CD CD I
;0)> CD "'C .-+ ::J ~ en ;:+
11 - ..., () en -.
CD en CD c Q) 3 en -u
Q) en -. ~(') 0 CD I
::J ...,
-CD Q) o .-+ ::J a. CD ......... ...,
men - ::J 0 en CD ::J 0
en en ::J .-+ a. .-+ 0 I
.-+3 OJ ..., I"'C
-. en c -C
2tCD .-+ (') CD CD
c c
CD ::J .-+ Q) ::J Q I
3 c- -.
-f'-+ en 0 ..., c-
-. ::J -. -. (J)
Q) '1J ::J .-+ ::J a.
x Q) 0 Q) co en CD I
CD'< C ::J
.-+
en 3 en Q) C.
I
CD r
::J -.
. I. (J)
.-+
I
()
::T I
CD I
c.
~ en en ~)> ~ ~ c I
Q) c CD Q) "'C Q) Q)
3 "'C ..., ..., ..., CD
'< '< == (') (')
.-+ ... I
rv 3 CD rv rv ::r ::r
0 CD 3 0 0 ~ .........
0 ..., c- o 0 CD )> I
()) rv CD ""'"'-J ""'"'-J ... "'C
0 ..., rv :::! .
0 rv 0 - I
()) 0 0 0
0 ""'"'-J ""'"'-J
""'"'-J I
I
I
I en
I (])
E
I --
I-
I -
-
en s.... co
0
I. ID ~
~ co
u
I ::J (]) en
en C. en
en en (])
I c u
- u
I c c <(
0
0 (])
--
I ~ -
-- u U
I ·
t) ::J --
I en s.... ..c
::J CD ~ (])
....... en CD >
I I.- m c c
I · -0 0 0 ~
en
s.... C- O ..c u
I C ::::> a...
(]) c
0 ~ ....... (]) CD (])
I ~ u E
(]) - C)
() CD --
- .c s....
en -~ --
0 ~ 0 (])
I ~ I
L.. - ~ E
a... -
(]) ::J I W
I z I LL
. .
I .
I
I
.
11
--
:J
0)
-
OJ
--
r-+
c:
3
--
:J
o
c:
en
r
--
. I-
-u
0)
<
--
:J
co
--
:J
~
o
o
(X)
.
G)
0)
.,
c-
O)
co
CD
en
CD
<:
--
C1
CD
.
s:
0)
--
-
o
CD
-
--
<
CD
.,
'<
.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
C
I I I :J
Z --
Z Z -. 3
oOcc-c
Q) Q) ;r CD
(") (") CJ) 0-
(") (") :<:
CD CD <CD
CJ) CJ) 0-
CJ) CJ) CD
~ ~ ~ 0
=r =r CD :::::! _
CD CD :J <
:J :J a. CD
(") (") CJ) ~
o C 0)
:J a- '<
~Qo )>
~cc C1
CD C C1
CJ)::: CD
-. CD en
a. ..., en
CD _.
~ CJ)
~-c
"0
-. C
CJ) .,.
CD
-c a.'
o
C
..,
CD
a.
()
o
::J
en
. . I '" .
...,
c
'1
. .
-
o
::J
en
en
c
CD
en
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
('--
en
c
o
--
I ·
en
Q)
::J
a
- ~ "--
,......-
,
\-~~_~__L,_ n-'lTl / /<\, 1
/--Ti', // D~~E~T~EET I~: ~~=
>"'" <'J '> ,//,,:--- ll~,'~ __'-=__.-J~-
i i~, ..'......(' "..';~' t-_..n"h"h..;:a:5,
! ' <" ".....,.~- .",,/ "'-' \'" I, f,',hlZL-_l-, '
f / I ;..~) '., c-----------....
-< \., -!i',j / 'i-Tl.:"\ "<:'\ \---J!<~~'-'=t'
/' \, / ~r.f \ \ )' , \ ' ---- m
\ J..-'_.{ I >~> L~ ~);' ,\),/:~~:,'::~~'~---- z'----__ .-
'v// ''';<~;/'/ /' / / / \ \ '\ \/ "\ \.",
/"f' ", :' I i ",-'.so,;;:', ! ! I . \ ", " \ " .
!,,~il//tPj~~~__-,~:~\<,>, ' ,
~"~' , , ' '", , , I r \ , /'
I /">"~iv-:,, / ;' ,: ><.,/ i '. \ ",
i.....~_M__._........ ./ I / / I.......~,...'!,~.........,,'~.... ;,' / ! ....; ........1. ) \ \;' '\ "
"'~ -~f ~ 1.~:,?" ;I,<~> ;;;' '/J,<<", \
. l,nJ . !
L--._mH ~~~-f-~', .._L.~ 'hL~..,i,~._...:""'_ /1
ZANE \ \ '. \ ; i /
sr'-'\ \ '\ \. \, \ I I
\. \... .
)\~ ,.\/~:,::~~~::~~-\ TEf!---] 1 L_
-,.._-'--_. \ ... \ \ '.L"__"'~ r----L
-=~=~-::~?\ \\<~~<~- ~;! ,j--
-- .' ~'4 ~ ...,,-...-. < .
...,,-" ,," , .. \ ~ \.: 1m!
. ~ .
\ !
" ,
I
...............,..1
'-
"
"
......~,
....... ;
......, ;
'-....
""'" ........
'.
'......... ""'"
....., ", ....,
..... " , .....
:......-r-"'<j-r'N--...7..
/
/f
:'
"'~
..... .':'--
J.'...., '{,','
r'----'1 ~.__
--'-'\ L.._l_.__L~~.L--, I !
'''-~j XIAV'ER'~r"-\<"'----- ,,/ /'
00: ,,,
'y' I I "
~/ I ! \ ;
./ \ / ,
-"-T-----'
I
I,
'\,
r'
m
CI
m
Z
.,
:a'"
m-4
n:a
om
zm
",-4
-4'"
:a-4
co
nID
iitm
.,
/
.....
;
i
...1
//
"
"
~"..,
I
I
1
1
I
I
1
1/
,I
~
,..,
I
" ,
". f"
;
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I