Loading...
6.3. SR 12-18-2006 City of Elk River REQUEST FOR COUNCIL ACTION Agenda Section Meeting Date Community Development December 18, 2006 Item Number 6.3 Prepared by Catherine Mehelich, Director of Economic Develo ment Reviewed by Scott Clark, Community Development Director Item Description Consider Street Disruption Permit for J ackson Avenue Introduction Staff recendy received a request by Flannery Construction to reconfigure traffic and parking on Jackson Avenue from January 15 until February 9 (20 working days) in order for a crane to be sited property to complete the framing work of the Jackson Place development. Staff informed the River's Edge Downtown Business Association of the issue via a public notice with regard to this evening's Council meeting. Discussion The attached letter from Flannery Construction dated December 7, 2006 describes the situation for which this reconfiguration is needed. Earlier, as you may recall, Flannery was able to abandon the need for the reconfiguration when the timing of the work aligned with the bank's construction timing. Due to recent construction delays, it has become necessary to reinstate the reconfiguration plan in order to coordinate work from the bank side. The length of time for the work (20 working days) remains the same as Flannery's previous request which was approved by the Council on September 18. The only change is the dates for the work to occur after the holidays, commencing January 15 for completion by February 9. The reconfiguration design also remains the same as the previous request. As shown on the attached map, the crane set-up is outside the existing fence line which, in order to accommodate one-way traffic southbound, will necessitate a number of Jackson Avenue on-street parking stalls to be removed, but 5- stalls can remain throughout the proposed timeline. Attachments . Memo from Flannery Construction to the City of Elk River dated December 7, 2006 re: Jackson Place/Street Disruption Permit . Memo from Flannery Construction to the City of Elk River dated September 12,2006 re: Jackson Street Reconfiguration . Street Disruption map dated September 14,2006 S: \Downtown Revitalization \Memos \2006 \REQ UEST COUNCIL ACTr ON .12.18.06 jackson reconfiguration.doc Action Requested Flannery Construction has made its best efforts to coordinate with City staff and adjacent contractors to minimize the disruption for their framing work. Staff recommends approval of issuance of a Street Disruption Permit for the reconfiguration of J ackson Avenue from January 15 to February 9, 2007 per the conditions outlind in the memo, dated December 7, 2006, from Flannery Construction to the City of Elk River, and as illustrated on the Street Disruption map dated September 14,2006. Council Action Motion by _ Second by _ Vote Follow Up s: \Downtown Revitalization \Memos \2006\REQUEST COUNCIL ACTION.12.18.06 jackson reconfiguration.doc 1375 St. Anthony Avenue St. Paul, MN 55104 Phone: (651) 225-1105 Fax: (651) 225-1100 MEMORANDUM From: To: Flannery Construction, Inc. Cathy Mehelich City of Elk River Friday, December 7, 2006 Jackson Place I Street Disruption Permit Date: Re: Dear Cathy, As you know, we were pleased to be able to withdraw our previous request for a street disruption permit after finalizing a plan to set the precast crane in the basement of the building and to use the Bank of Elk River parking lot for additional access. Since that time, delays have called that plan into question. It is apparent that we will have to set the precast crane on Jackson Avenue as previously planned. At this time, we anticipate our precast operation will be completed in the middle of February. Since the bank plans to be using the parking lot for customer parking by that time, we will have to reverse the sequence of our precast operation, working from east to west, rather than west to east. The crane was to be set in the east 1/3 of the basement, but by setting the precast plank on the east side first, we lose that option. Construction Limits: The construction limits will be as described in the original request made in our September 12,2006 memo. Schedule: The duration would be 20 working days, as described in the September 12 memo. Our target date for commencement is Monday, January 15th, with completion intended by Friday, February 9th. Staging: We plan to stage our truck traffic as described in the September 12 memo. For your convenience, I have attached a copy of the September 12 memo and the sketch that accompanied that memo. Thank you for bearing with us as we have worked to get past these difficult delays. Sincerely, ~ lannery Construction www.jlanneryconstruction.com Precast Crane Memo 2006-12-07.doc An Affinnative Action/Equal Opportunity Employer MEMORANDUM From: Flannery Construction, Inc. To: Cathy Mehelich City of Elk River Date: Tuesday, September 12, 2006 Dear Cathy, I am writing in regards to the proposed re-routing of traffic on Jackson Avenue to allow erection of precast concrete for the Jackson Place building, and to address construction limits, schedule and staging issues. Construction Limits: Please find attached a sketch of the proposed temporary change in the construction limits. Along Jackson Avenue, you'll notice that the southerly two-thirds of the construction fence would move west to provide operating space for the crane, plus the required safety margin between the crane and the foundation wall. The northern third of the Jackson Avenue fence would remain unchanged, as would the fence on the south, east and north sides. This design preserves one-way, $outhbound traffic on Jackson Avenue. It also preserves one handicapped parking space and three regular spaces. (please note that background drawing I used to make this sketch does not show the location of the angled parking spaces accurately. Though it appears that a total of five spaces would be preserved, in reality it would be four.) . Schedule: The duration of the re-route would be 20 working days. This includes one day to move the fence, 15 days for precast erection, three days for masonry and one day to move the fence back to its original location. Our target datefor commencement is October 30. We will update that schedule in the next week and hope to be able to set a firm date at our September 27 meeting with city staff. Staging: From westbound Main Street, trucks would enter the site at the southeast gate and wait within the construction limits. A few trucks would be unloaded from this location. The majority, however, would pull out through the southwest gate onto Main Street, then back up into the construction area on Jackson, adjacent to the crane. When empty, they would leave downtown via westbound Main Street and Proctor Avenue. We will provide tlaggers to control traffic during these operations. Thank you for working with us as we developed this plan. Sincerely, ?At-t a--iA~ eth Allen, Flannery Construction n___-4 "'-_ ,,____;_ f'lt,ft^, I"U'1l. ,.... ... fENtt. Urttt-lAA(;E:D J~ l V5DNPLA L E CONS1R~\G1\ON UM\TS fOI\ EKttl\ON Of PRECAST (oNtKET~ ., 6_. fr .~ . '~~---r-- N CD ,.,,.., LiJ JACIlSON ~ITE