Loading...
3.2. SR 01-08-07El of, -_-� River City of Elk River REQUEST" FOR COUNCIL ACTION Agenda Section Meeting Gate Consent january S, 2007 Item Description Resolution Entering into 1\1laintenance Agreement with Wright Count- for the Parrish Avenue Bridge Item Number 3.2. Prepared by T'erry Maurer, City En er Reviewed by Introduction Annually, the City, of Elk Ri-� er is asked to enter into a maintenance agreement with V7right Count- for maintenance of the Parrish Avenue Bridge. Discussion Since the bridge was rebuilt mane rears ago, the City- of Elk River and W -tight County have shared maintenance duties. Since 2002, this agreement has been entered into annually-, therefore, Wti g ht Counry is asking the Cityl of Elk- River to once again enter into a maintenance agreement for the Parrish Avenue Bridge during 2007. The agreement is exactly, the same as the agreement entered into in past years. Financial Im act There is no financial impact beyond the maintenance issues that the city has currently- been r responsible for on the Parrish Avenue Bridge. These include maintenance of the street lights, removal of snow from the sidew alk, maintenance of the slope and berms on the north approach, snow and ice control from bridge and approaches, and removal of marling /spray- paint from risible surfaces of bridge structure. Attachments ■ Corer letter from Wayne Fingalson, Wright Count- Highway Engineer ® MN/ aintenance Agreement for 2.007 Action Re guested Adoption of the attached Resolution entering into a maintenance agreement betav, een the City- of Elk River and Wright County for the Parrish Avenue Bridge for year X007 and direction to the Mayor and City Clerk to execute such agreement. r Council Action 1lotion by Second by d ote Follow Up SAEnp 'neer\? ()()7 CC mem5\�N'riwht Gunn- gnt for Pa.rnsh Brid c.dr�c J Y �o .4-r q0'. WRIGHT COUNTY � Z D EPARTMENT OF HIGHWAYS � � Wright County Public Works Building � 1901 Highway 25 North O .4'y Buffalo, Minnesota 55313 7856 Jct. T.H. 25 and C.R. 138 Telephone: (763) 682 -7383 FAX- (763) 682 -7313 December 29, 2006 City of Elk Raver Joan Schmidt, Clerk 13065 Orono Parkway; Box 490 Elk River, NON -"'*')5330-0490 Dear Ms. Schmidt: WA NE A. FINGALSON, P.E. Highway Engineer (763) 682 -7388 vIRGIL G. HAWIUNS, F.E. Assistant Highway Engineer (763) 682 -7387 RICHARD E. MARQUETTE Right of way Agent (763) 6827386 Enclosed is a maintenance agreement for the maintenance activities on Bridge 86515. Two copies of this are enclosed for your review and execution by the City. As of 200?, this agreement has been changed to an annual agreement so that we can include it for approval with our other maintenance agreements, which are all submitted on an annual basis. The current agreement will be effective from January 1, 2007, to December 3 1. 2007. Please return both copies of the executed agreement. After approval by the County Board, one of the copies will be returned to you for your files. If you have any questions concerning this agreement, please contact me. Sincerely, r WayneA. Fingalsori C oun - Highway Engineer Enclosure Equal Opportunity I Affirmative Action Employer RESOLUTION 07- MAINTENANCE AGREEMENT - 2007 THIS AGREEMENT made and entered into by and between the City of Elk River hereinafter referred to as the "City" and the County of Wright hereinafter referred to as the "county" WHEREAS, it is deemed to the best interest of all parties that the duties and responsibilities of both the City and the County as to maintenance on Bridge #86515 and its approaches should be clearly defined. NOW THEREFORE, IT 1S AGREED with regard to said structure maintenance: MAINTENANCE CITY RESPONSIBLE FOR: (1) Maintenance of street lights; (2) Removal of snow from sidewalk; (3) Maintenance of slopes /berms and roadway on north approach (includes: turf maintenance, bituminous maintenance, drainage and riprap maintenance); (4) Snow and ice control from bridge and approaches; (5) Removal of markings /spray paint etc. from visible surfaces of bridge structure. COUNTY RESPONSIBLE FOR: (1) Periodic sweeping to remove sand and debris and removing sand /dirt from expansion joints; (2) Signing for bridge and approaches; (3) Maintenance of slopes /berms and roadway on south approach (includes: turf maintenance, bituminous maintenance, drainage and riprap maintenance); (4) Centerline and edge pavement marking (includes stop bar). The agreement between the city and County shall be for a one -year period and run from January 1, 2007, to December 31, 2007. All maintenance responsibilities will be deemed "offsetting" therefore no payments will be required for the individual maintenance work which conforms to the areas stated herein and performed under authorization of either the City or county. In the event that the structure needs major maintenance /rehabilitation an agreement detailing the work and shared costs must be approved and accepted by the City and County. ar• ■ , 20 ATTEST. City Clerk Mayor CERTIFICATION I hereby certify that the above is a true and correct copy of a resolution duly passed, adopted and approved by the City council of said city on , 20 APPROVED AND ACCEPTED: COUNTY OF WRIGHT Chairman of the Board Date ATTEST: County coordinator Date City clerk Name of City