06-134 RES
.
.
.
RESOLUTION 06- 134
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND ORDERING A
PUBLIC HEARING ON THE IMPROVEMENT IN THE MATTER OF THE
DEERFIELD 3RD ADDITION STREET jSTORM DRAINAGE RECONSTRUCTION
IMPROVEMENT OF 2007
WHEREAS the Feasibility Report ordered by the Council in Resolution 06-115 has been
prepared with reference to the Deerfield 3rd Addition Street/Storm Drainage
Reconstruction improvement and was received by the City on December 18, 2006;
and
WHEREAS the Feasibility Report recommends that the proposed improvement is feasible;
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River,
Minnesota:
1. The City Council will consider the Deerfield 3rd Addition Street/Storm Drainage
Reconstruction Improvement of 2007 as described in the Feasibility Report and the
assessment of the property abutting this proposed improvement for all or a portion of the
cost of the improvement pursuant to Minnesota Statutes, Section 429, at an estimated total
cost for the improvement of $4,730,500. A reasonable estimate of the impact of the
assessment will be available at the hearing.
2. A public hearing shall be held before the City Council on the proposed improvement on the
16th day ofJanuary, 2007, at 6:30 o'clock p.m. at the Elk River City Hall Council Chambers.
The City Clerk shall provide two published notices (one week apart) in the official
newspaper with at least three days between the last publication date and the hearing, and
mailed notice ten days to the hearing as required by law.
Passed and adopted this 18th day of December, 2006.
ATTEST:
~/n~~
J r~. Schmidt, City Clerk
S: \EngineerlmprovProj\2007 Improvement Projects \Deerfield 3rd St-Storm Drainage \Resolution Receive Feasibility Order PH.doc