07-006 RES
.
.
.
RESOLUTION 07-D6...
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION ORDERING THE IMPROVEMENT AND
PREPARATION OF PLANS AND SPECIFICATIONS IN
THE MATTER OF THE DEERFIELD 3RD ADDITION STREET/STORM DRAINAGE
RECONSTRUCTION IMPROVEMENT OF 2007
WHEREAS a public hearing relating to the Deerfield 3rd Addition Street/Storm Drainage Reconstruction
improvement was held before the Elk River City Council after ten days mailed notice and
two weeks published notice of the hearing was given; and
WHEREAS the City Council has duly considered the Feasibility Report and those matter presented at the
public hearing by those person desiring to be heard on the matter;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota:
1. The Deerfield 3rd Addition Street/Storm Drainage Reconstruction improvement is hereby ordered as
recommended in the Feasibility Report dated December 2006.
2.
Terry J. Maurer, City Engineer, is hereby designated as Project Engineer for this improvement. The
Project Engineer is directed to prepare plans and specifications for the making of the improvement
and the solicitation of competitive bids.
Passed and adopted this 16th day of January, 2007.
~~~,~
Steph ., A. Klinzing, Mayo . . .
ATTEST:
Tina Allard, City Clerk
0/-0&