Loading...
07-006 RES . . . RESOLUTION 07-D6... A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ORDERING THE IMPROVEMENT AND PREPARATION OF PLANS AND SPECIFICATIONS IN THE MATTER OF THE DEERFIELD 3RD ADDITION STREET/STORM DRAINAGE RECONSTRUCTION IMPROVEMENT OF 2007 WHEREAS a public hearing relating to the Deerfield 3rd Addition Street/Storm Drainage Reconstruction improvement was held before the Elk River City Council after ten days mailed notice and two weeks published notice of the hearing was given; and WHEREAS the City Council has duly considered the Feasibility Report and those matter presented at the public hearing by those person desiring to be heard on the matter; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Deerfield 3rd Addition Street/Storm Drainage Reconstruction improvement is hereby ordered as recommended in the Feasibility Report dated December 2006. 2. Terry J. Maurer, City Engineer, is hereby designated as Project Engineer for this improvement. The Project Engineer is directed to prepare plans and specifications for the making of the improvement and the solicitation of competitive bids. Passed and adopted this 16th day of January, 2007. ~~~,~ Steph ., A. Klinzing, Mayo . . . ATTEST: Tina Allard, City Clerk 0/-0&