3.0. SR 01-29-2007
City of Elk River
REQUEST FOR COUNCIL ACTION
Agenda Section Meeting Date
Item 3.
Item Description
Consider A roval of Architect for YMCA Pro'ect
Item Number
3.
Prepared by
Lori Johnson, City Administrator
Reviewed by
Introduction
Requests for Proposals for architectural services for the Elk River Community YMCA were solicited
from six architectural firms. Five of the firms submitted a proposal. Interviews have been held and a
firm has been selected by the interview panel for consideration by the City Council.
Discussion
Representatives of the YMCA, Councilmember Jerry Gumphrey, Parks and Recreation Director Bill
Maertz and I interviewed three of the firms. Ankeny Kell, KKE Architects, and BWBR Architects were
each given twenty minutes for a presentation followed by questions from the interview panel. Based on
the interviews, relevant experience, references, ability to meet the timeline, and, to a lesser degree, fees,
the interview panel is recommending BWBR Architects.
BWBR's experience most closely matched the needs for designing the Elk River Community YMCA.
BWBR has been involved in designing and remodeling several new and existing YMCA's. Fees for all
phases of the project total 7.3 percent of the construction cost which BWBR estimates to be between
$9.1 and $9.3 million. Reimbursable expenses are not included in that fee and are estimated to be another
0.6% to 0.8% of the construction cost. At this time, we are contemplating adding an additional pool
consultant which may add a small amount to the fee. The results of the negotiation to add the consultant
and the related fee will be presented at the meeting.
Bill Maertz will be project leader for the City and will work with the YMCA, project architects, and
Rebecca Haug, Environmental Administrator, to incorporate the requirements of the Sherburne County
Landfill Legacy Grant into the project. BWBR has experience with LEED building requirements and an
architect from BWBR has spoken to Ms. Haug about the County's grant.
Representatives from the YMCA and BWBR will be at Monday's meeting to answer questions about the
proposal.
Financial Impact
The cost is included in the $12,000,000 project budget.
Attachments
. Proposal for Architectural and Engineering Services from BWBR
s: \ Council \Lori\2007\ YMCA Arch Recmd.doc
Action Requested
The Council is asked to approve BWBR as architects for the Elk River Community YMCA project and
direct staff to enter into a contract with BWBR for those services as outlined in BWBR's proposal.
Council Action
Motion by _
Second by _
Vote
Follow Up
s: \Council\Lori\2007\ YMCA Arch Recmd.doc
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
PROPOSAL FOR
Architectural and
Engineering Services
Elk River YMCA
Elk River, Minnesota
January 18, 2007
BWBR
ARCHITECTS
~..... .....
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.-
.
.
.
.
.
.
.
r "-
BW'BR
~'Y
Architecture. Interior Design
Lawson Commons
380 St. Peter Street, Suite 600
Saint Paul, MN 55 I 02- I 996
651.222.3701
fax 651.222.8961
www.bwbr.com
January 18, 2007
Lori Johnson
City Administrator
City of Elk River, MN
13065 Orono Parkway
Elk River, MN 55330
Dear Lori:
BWER is very pleased to submit this proposal for architectural and engineering services to the City
of Elk River and the YMCA of Metropolitan Minneapolis for the new branch facility in Elk River.
As evidenced in other communities, a city with a direct YMCA presence can offer its citizens an
array of services and programs not easily realized on its own. The joint partnership and subsequent
support from the referendum established for this branch have created a great foundation on to
which to build a future together in Elk River.
BWBR Architects has been, and continues to be, the go-to design and strategic planning firm for
the YMCA of Metropolitan Minneapolis - by their choice - for many years. Not only are we
engaged with the YMCA on future expansion and renovation analysis at their branches, we continue
to assist them on continual building upgrades throughout the Association. Simply put, our long-
term relationship has resulted in invaluable building knowledge pertinent to the YMCA. We
understand YMCA buildings and the heavy program demands placed upon these facilities. In
addition, we understand and have vast project experience with the City's prerogative to create a
model project for demonstrating "green" solutions. In this case, this building requires innovative
yet practical design solutions to achieve the best value and individual goals of the City (as building
owner and steward of public money) and the YMCA (as long-term tenant).
In this proposal, we discuss the approach BWER will bring to the design process - tailored for this
individual project - which can be summed up in three words: participatory [we will lead the
process on your project (not ours)]; creative (this project has parameters unlike any other, thus
demanding creative, unique solutions); and managed (design balanced with budget, on-schedule,
and always keeping you informed).
We are very excited to have the opportunity to continue working together with the YMCA and the
City of Elk River on this very special community project.
Respectfully submitted,
BWBR ARCHITECTS, INC.
~~
Greg Fenton, AlA
Project Manager
651.290.1877
gftnton@bwbr.com
~
Stephen P. Patrick, AlA, LEEDo A.P.
President/CEO
651.290.1953
spatrick@bwbr.com
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
lo...-- '" -'"""J7
....' -,' :....
- - ,......".~~"\'
"'^""-"
/
~
Firm Background
\"..' '~"'~-'"
\ ' ....'.li".
~
~
~,
'"tl..';.
,,-.
Each client comes to us at a new
space in time; there's always
something new to learn.
Our firm's mission is
to provide exceptional
professional design
services to our clients,
resulting in distinguished
architectural solutions that
stand the test of time.
Who We Are
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
BWBR Architects is an architectural and interior design firm with a diverse
practice dating back to the 1920s. The employee-owned firm has a staff of 127,
was named a "Great Place to Work" by The Minneapolis-St. Paul Business Journal
in 2003, and has ranked in the top five on The Business Journals annual "Top 25
List of Architectural Firms" for the last several years. We have built our business
by cultivating long-term relationships - in 2005, repeat clients comprised 95%
of the firm's workload, which approaches $300 million in construction annually.
BWBR has been steadily involved in the design of recreation and community
centers over the past 30 years. Our YMCA and community center work has
established a standard for this type of recreational building. Our recent
experience includes work with the YMCA of Metropolitan Minneapolis, the
YMCA of Greater Saint Paul, the Red Wing Family YMCA, the City of
Shoreview's Community Center, the City of Ramsey Community Center, three
City of Saint Paul neighborhood recreation centers, and the Boys and Girls Clubs
of Saint Paul.
What We Do
BWBR's practice is built around a collaborative design approach and a service
culture based on the belief that "the journey should be as pleasant as the
destination." Special attention to client needs is not "old fashioned" - it is
simply the right way to conduct business.
We view our relationships with clients, staff, and project partners as our most
important long-term investment. To foster them, we emphasize a team-based
approach. Rather than having "studios" or "departments," BWBR builds the
team from scratch for every project's unique requirements.
Our Philosophy and Approach
Besides an emphasis on client service, a team approach, and innovative design
BWBR's general approach centers on several other key priorities.
Strong Proiect Management
BWBR is a project-management-oriented firm - we plan and manage the
work effectively to meet your goals. Our team works closely with yours to
communicate, keep the schedule and budget on track, and make sure that
the important issues get the attention they need.
2 i Proposal for Architectural and Engineering Services i Elk River YMCA i January 2007
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
II
.
.
STAFF PROFILE
Principals .......................................14
Sr. Designers/Project Planners.......... 5
Project Managers..............................9
Project Architects ...........................20
Intern Architects/CAD Techs.........30
Interior Designers........................... 14
CA, QA, Specifications...................11
Project Support Staff...................... 10
Operations .....................................12
Student Interns ................................2
Total......................................... 127
r
r-
Fit"'-Background
r
Performance (Sustainable) Design
BWBR has 29 LEED'" -accredited designers on staff, an ongoing Performance
Design Group, and a strong record of using the award-winning Xcel Energy Design
Assistance Program to explore options that optimize environmental responsiveness
and long-term energy savings.
Quality Assurance/Outstanding Documents
BWBR is intensely committed to top-quality documentation to ensure
accurate pricing, competitive bidding, and constructability.
A Culture of Commitment
BWBR has centered its approach on a culture of commitment - to outstanding
client service, successful project management, consensus-driven planning,
long-lived relationships, and respectful stewardship of our clients' resources.
Areas of Specialization
The scope of services that can be provided by the BWBR team includes planning,
architectural and interior design; civil, structural, mechanical and electrical
engineering; landscape architecture and design; environmental design; and other
specialized services as each project requires.
Architectural, Engineering, and Interior Design and
Documentation, including:
Campus, Site and Facility Master Planning
Space Planning/Programming
Architectural Design and Documentation
Interior Design and Documentation
Approval Process Assistance
Field Verification
Facility Evaluation/Condition Reports, ADA, Life Safety,
and Building Code Analysis
Furnishings, Fixtures, and Equipment Planning, Selection and Specification
Imaging and Visualization
Graphic Design
Cost Estimating
Record/As-Built Drawings
Coordination of Engineering Services and Specialty Consultants
Construction Administration
Proposal lor Architectural and Engineering Services 1 Elk River YMCA 1 January 2007 \ 3
~
BWBR
~17
p---
Specialty and Engineering Consultants
For this proposal, we have chosen to team with Dunham for mechanical and electrical
engineering; Ericksen, Roed & Associates for structural engineering; Bogart, Pederson
& Associates for civil engineering; Loucks Associates for landscape architecture; and
Baker Pools for specialized planning and programming services related to the pool
component of your project.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
II
.
.
Dunham Associates - Mechanical and Eledrical Engineering
Dunham Associates has provided mechanical and electrical engineering services to
BWBR project teams for many years. Established 47 years ago, Dunham's resources
today include 89 professionals in Minneapolis. Collaborations with BWBR include
many projects that required creative engineering solutions due to the complexity of
the facilities and extremely tight budgets. Some recent examples are the Paul and
Sheila Wellstone Center for Community Building in Saint Paul, the Ramsey County
Public Works Facility in Arden Hills, the extremely energy-efficient East Metro
Transit Facility in Saint Paul, and numerous hospital projects. Dunham has also
worked on several YMCA facilities, including Blaisdell YMCA, Ridgedale YMCA,
YMCA Camp Kici-Yapi, Bismarck YMCA, and YMCA Aquatic Center in Rapid
City, SO. Jay Rohkohl, a Principal at Dunham with 24 years of experience, will
oversee the entire mechanical/electrical engineering team and will also serve as lead
electrical engineer for your project. Matt Jensen has 10 years of experience and will
be your lead mechanical engineer.
Ericksen, Roed & Associates - Strudural Engineering
Ericksen, Roed and Associates (ERA) has provided structural engineering services to
BWBR since its inception more than 20 years ago. As at BWBR, the firm's
principals are directly involved on each project, drawing on an exceptional staff of
nearly 60 professionals for additional project detailing and support. ERA has
worked with BWBR on more than $550 million worth of projects in the last five
years, including the Emma B. Howe Northtown YMCA, the Minnesota Valley
Family YMCA, the Red Wing Family YMCA, and the Shoreview Community
Center expansion. ERA has also worked on numerous Lifetime Fitness facilities
around the U.S., Chaska Community Center, Crystal Community Center,
Plymouth Community Center, and the Boys and Girls Club of Saint Paul. Bob
Curtis has 39 years of experience and will be the structural engineer on this project.
4: Proposal for Architectural and Engineering Services: Elk River YMCA 1 January 2007
.
.
.
.
.
I]
IJ
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
.
.
~
( -..-
"....- ~ ~~
FittTtBockg rou nd
Bogart, Pederson & Associates - Civil Engineering
Bogart, Pederson & Associates, established in 1997, is a full service civil engineering,
land surveying, and mapping firm. Their team of more than 25 serves a broad range
of clients, from local and county government agencies to industrial, housing, retail,
and corporate developers. They are currently serving as township engineers for
Becker, Baldwin, Livonia, and Clear Lake Townships in Sherburne County.
Jon Bogart, the civil engineer for this project, is currently working with BWBR
on the Sherburne County Public Works Facility in Becker. Based in Sherburne
County, the firm has extensive experience in Elk River and specific knowledge
of the project site.
Loucks Associates - Landscape Design
Loucks Associates, established in 1976, is a frequent BWBR partner and has
worked with us on more than 20 projects since 1997, including the new Saint
Paul headquarters for CLUES (a social service agency for Latinos living in the
Twin Cities), a campus consolidation for Lumen Christi Catholic Community
in Saint Paul, the relocation of Lord of Life Church in Maple Grove, an addition/
renovation at King of Kings Lutheran Church in Woodbury, and the expansion
of Nativity Lutheran Church in St. Anthony Village. Paul Kangas, the landscape
architect on this project, has worked with BWBR on several projects, including a
new campus for North Memorial Health Care in Maple Grove and 3M Company's
new Innovation Center.
Baker Pools - Aquatics Consultant
Eric Swanson, President and Owner of Baker Pools, has been a leader in the
swimming pool profession for over 20 years. His broad range of pool planning
projects include recreational facilities; therapeutic facilities; interactive features;
waterfalls and fountains; and educational, institutional, zoological, and competitive
pools. He keeps a watchful eye toward usability, safety, durability, and maintenance
of facilities. Eric has worked with BWBR on several YMCA facilities, including the
Emma B. Howe Northtown YMCA, the Minnesota Valley Family YMCA, and the
Red Wing Family YMCA.
Proposal for Architectural and Engineering Services 1 Elk River YMCA l January 2007 [5
~
BWBR
~17
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
II
.
.
.
.
.
.
.
.~~ {
!1ii~~
A~'; r~' .
. ,~ '.
~ ~
\
1.
Proied Experiencel
Design Examples
/"
/1 110
i. \1=
! G) i I
I\:': ,E:::::::I
r---r---~; L.._._n__._
j i :L .-=~.~.._.__..__._
/"
o
o
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
~
YMCA of Metropolitan Minneapolis:
Elk River YMCA Master Planning/Site Study · Elk River, MN
Completion date: 2006
Total square footage: 50,000 sJ. (prelim. est.)
Total overall costs: $12 million (prelim. est.)
Project designer: BWBR Architects
Project manager: Greg Fenton
Principal in charge: Steve Patrick
Designer: Craig Peterson
The preliminary vision includes fitness facilities with gymnasium, kid's zone
program space, locker rooms, fitness studios, duo-pool aquatics space, and
outdoor splash zone.
Project is conceived as a partnership between the YMCA of Metropolitan
Minneapolis and the City of Elk River.
· BWBR coordinated this conceptual study with the YMCA, exploring site
and floor planning opportunities and exterior conceptual imagery.
Public literature and general marketing efforts were used as a means to
develop project understanding and support.
8 i Proposal for Architectural and Engineering Services i Elk River YMCA 1 January 2007
.
.
.
.
.
II
.
.
II
.
.
II
.
.
.
.
III
.
.
.
.
.
.
.
.
.
.
.
II
.
.
.
r--'
f'ProjetrExperience/pesig n Examples
YMCA of Metropolitan Minneapolis:
Emma B. Howe Northtown YMCA Original Facility,
Expansion/Renovation · Coon Rapids, MN
Completion date: 1996 (original); 2005 (expansion)
. Total square footage: 65,000 sJ. (original); 9,500 sJ. (expansion)
. Total overall costs: $6.3 million (original); $1 million (expansion)
Construction time frame: November 1994 - May 1996 (original);
September 2004 - September 2005 (expansion)
Project designer: BWBR Architects
. Project manager: Greg Fenton
Principal in charge: Steve Patrick
New-construction family branch YMCA includes a two-court gymnasium;
fitness area; jogging track; aerobics studio and fitness equipment; natatorium
with six-lane lap pool, shallow-water leisure pools with zero-depth entry and
waterslide, whirlpool, and sauna; community meeting rooms; youth, adult,
and family locker rooms; youth gym; facilities for child care; teen center.
. In 2005, BWBR designed a two-story expansion that greatly increased
aerobic/fitness studio space and parking capacity.
Exterior design of expansion blends with and complements original facility's
design and materials.
Teamed with construction manager Kraus-Anderson to deliver the
project on time and within budget.
Proposal for Architectural and Engineering Services ~ Elk River YMCA ~ January 200719
~
BWBR
~IT;;
.
.
.
.
.
(I
.
.
II
.
.
.
.
.
.
.
..
.
.
.
.
.
.
.
.
.
.
..
LI
.
.
.
YMCA of Metropolitan Minneapolis:
Minnesota Valley Family YMCA · Burnsville, MN
· Completion date: 1998
Total square footage: 61,000 sJ.
. Total overall costs: $6.2 million
Construction time frame: March 1997 - January 1998
Project designer: BWBR Architects
· Project manager: Greg Fenton
Principal in charge: Steve Patrick
New construction of a family branch YMCA includes gymnasium; fitness area;
lap pool; shallow-water recreational pool with zero-depth entry, whirlpool, and
sauna; and community meeting rooms.
.
As part of the Fairview Ridges Campus - a development that includes a
hospital, medical clinic, sports medicine clinic, church, and senior housing
_ the "Y" contributes to a holistic approach to health care and wellness.
The use of precast concrete walls helped keep the project economical and speed
up construction. The earth-toned building materials vary in color tone and
size, creating texture that breaks down the building's scale to complement the
residential environment nearby.
The floor plan and layout were designed to maximize the space allocated for
facility programs and minimize space devoted to circulation.
101 Proposal for Architectural and Engineering Services! Elk River YMCA! January 2007
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..... r--
:ProietrEijerience/Design Examples
YMCA of Metropolitan Minneapolis:
Minnesota Valley Family YMCA
Floor Plans
First Floor
Second Floor
~~...~
,
AEROBICS
FITNESS
,-
~
,
-----------//
Proposal for Architectural and Engineering Services l Elk River YMCA l January 2007 [ 11
~
BWBR
~I7
~... ~
.~............ ~~
...x1~~ i l~
.' ~--
, -..--
. )
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Red Wing Family YMCA Expansion/Renovation
· Red Wing, MN
.
Completion date: 2002
Total square footage: 64,000 sJ. (44,000 s.f. renovation;
20,000 s.f. addition)
Total overall costs: $5.4 million
Construction time frame: May 2001 - January 2002
Project designer: BWBR Architects
Project manager: Greg Fenton
Principal in charge: Steve Patrick
.
.
BWBR initially completed an expansion feasibility study for Red Wing's
existing downtown YMCA facility in 1999. We then went on to fully
develop the design and oversee construction.
Program highlights include an expanded aquatics program, including
a zero-depth pool with features, dedicated teen space for young adult
activities, and reorganization of existing spaces for more flexible
programming and staffing.
A two-level addition to the building's former rear accommodates the new pool,
and is planned for future vertical expansion to add a third-floor fitness center.
The pool addition is also the nearest portion of the building to the river,
offering views of this popular outdoor water recreation venue from Red Wing's
newest indoor water recreation spot.
<
..
· Conservation improvements include high-efficiency lighting, heating, and
cooling, windows and motors plus pool-area dehumidification systems with
heat recovery.
12! Proposol for Architectural and Engineering Services 1 Elk River YMCA! January 2007
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Existing Facility Plans
-.
r"D
"","0
.' '0:."
~.rt
-..-'
"
~L
...... .--,
." "-
~
...
-ProiecrEije'rience/ esign Examples
Red Wing Family YMCA Expansion
Floor Plans
Facility Expansion Plans
LEVEL 3
\-- ..-
-- ...-
,
I
i
I
I
I
I
I
I
,
I
I
I
I
\
I
I
'---
,
I
i
I
I
I
i
I
,
I
I
I
I
I
,
I
I
I
I
I
i
I
I
I
I
I
- -- -- -- -,
-- .. - -- -
\
I
\
I
\
I
;
i
!
LEVEL 2
-- ...-
I--
I
I
I
I
I
,
I
I
I
I
I
I
,
I
I
I
I
I
I
'--- ---r -- -- ---;, -- --.-- -i-- -- ---- - -
- -- -- --
I
I
I
I
I
I
,
I
,
,
I
I
,
I
i
I
I
I
i
I
I
I
I
I
I
I
-- -- -- -__i
IIEC""'-""'"
I OlSTlflGPlXlE.l)II
LEVEL 1
..-..- ..-
I--
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'- ---
,
I
I
I
i
I
,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-- -- -- -- --.---:
-- -- -- -- -- -- ----
Proposal for Architectural and Engineering Services j Elk River YMCA \ January 2007 \ 13
~
BWBR
~1.7
40,000 s.f. facility, second floor
~~
1111
1111 FllJIESSGNlER
Of'ENTO
N-'T.'TORIUM
1111
uuuuuu
muuu
~
YMCA of Metropolitan Minneapolis:
Prototype Facilities Planning · Minneapolis Metro Area, MN
· Completion date: 2005
· Total square footage: Generic 40,000 sJ., 60,000 s.L
and 80,000 sJ. facility concept plans
· Proiect designer: BWBR Architects
· Proiect manager: Greg Fenton
· Principal in charge: Steve Patrick
· BWBR was commissioned to develop prototype programs for 40,000 sJ.,
60,000 sJ., and 80,0000 sJ. YMCA facilities. Oeliverables included a proposal-
style book and Power Point presentation with prototype examples that the
YMCA can present as marketing tools to various audiences.
80,000 s.f. facility, first floor
60,000 s.f. facility, second floor
OI'E1iTQ
r<<r^rotlIVM
1111
1111 =
1111
uuuuuu
uuuuuu
Ol'Er-lro
"""
~
~
\,lPEN TO K,I)~
"'DVEN~EZONE
"""" -,
m.tOlO STlJOlO
80,000 s.f. facility, second floor
14: Proposal for Architectural and Engineering Services i Elk River YMCA i January 2007
~.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
=~ .-
. ~"'.""''''''-'':: -:
---~
~---
---
rJ-":
r-
~ ProiecrExperience/Design Examples
....'*"'. ':t~ ;i~"!:'~ct
fl
YMCA of Metropolitan Minneapolis:
South dale YMCA Expansion/Renovation Master Plan
· Edina, Minnesota
Completion date: 2003
Total square footage: 75,000 sJ. (estimated)
Total overall costs: $9 million (estimated)
Project designer: BWBR Architects
Project manager: Gteg Fenton
Principal in charge: Steve Patrick
. BWBR was hited to analyze a previous master plan study and develop an
updated needs program and conceptual design solution.
Two months of study resulted in a radical new master renovation concept
which added back program ability not provided in the earlier master plan.
The plan included exterior renovations to make the facility more visually
inviting, a new leisure pool, added fitness space, and better control of access
into and out of the facility.
BWBR also devised a phasing plan that would enable the branch to remain
open throughout the construction period, allowing the facility to continue to
generate revenue, which the previous plan did not address. It also helped the
branch keep members, and lessened the difficulty of construction - resulting
in construction estimates 20% lower than previous master plan and a GO-stall
increase in parking capacity.
Proposal for Architectural and Engineering Services! Elk River YMCA! January 2007 ! 15
~
BWBR
~ITY
i
I
I
)
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
YMCA of Greater Saint Paul:
Chain of Lakes YMCA Master Planning/
Programming Study · Lino Lakes, Minnesota
Completion date: 2006
Total square footage: 60,000 sJ. (estimated)
Total overall costs: $9 million (estimated)
Project designer: BWBR Architects
Project manager: Greg Fenton
Principal in charge: Steve Patrick
BWBR assisted the YMCA of Greater Saint Paul with planning, cost
estimating, and preliminary concept design options for a full-service
YMCA branch in Lino Lakes.
The new facility is envisioned to be part of a master planned community
that will include housing and retail.
BWBR invited the developer to participate in early planning meetings to
efficiently plan infrastructure/utilities, public amenities such as bike paths,
and shared parking.
16: Proposal for Architectural and Engineering Services: Elk River YMCA! January 2007
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. r.=
. ..... """"
- .-...
........
. -""",
"""""".
.
"""'"
. ....
.
.
.
.
.
.
.
.
.
.
.
.
v';..-.......----.
~~ 2; --
/ ---" D"-' '''' ;
~-:1
~
r ProjetrExperience/pesign Examples
.
"
YMCA of Greater Saint Paul:
Northwest Family YMCA Expansion/Remodeling Study
· Shoreview, Minnesota
.
Completion date: 2003
Total square footage: 20,300 sJ. (estimated)
Total overall costs: $3 million (estimated)
Project designer: BWBR Architects
Project manager: Greg Fenton
Principal in charge: Steve Patrick
.
.
.
BWBR was hired to envision an extensive multi-phased facility expansion
and renovation and parking capacity enlargement at the Northwest YMCA site.
Design concepts were developed that create a much more visible presence and
image for the YMCA from the outside, while greatly improving services,
amenities, and safety on the inside.
Phase I includes an 11,000 sJ. addition with a new lobby, a new wellness
center, and enlarged and enhanced locker rooms. A 9,300 sJ. addition in
Phase II creates a new leisure pool adjacent to the existing natatorium.
Proposal for Architectural and Engineering Services [ Elk River YMCA [January 2007 \ 17
~
BWBa
'- - ARCHITE.CTS
"--/
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
l(
..
Shorev;ew Community Center:
Or;g;nal Facility, Expans;on/Renovat;on · Shoreview, MN
.
Completion date: 1991 (original) . June 2003 est. (expansion)
Total square footage: 76,000 sJ. (original) .29,500 s.f. (expansion)
Total overall costs: $7 million (original) · $5.5 million (expansion)
Construction time frame: Not available (original) · June 2002 -
June 2003 (expansion, est.)
Proiect designer: BWBR Architects
Proied manager: Steve Erickson
Principal in charge: Steve Patrick
.
.
Part of a complex that also contains City Hall, this successful facility includes
the first leisure pool of its kind in the metro; a six-lane, 25-yard lap pool; fitness
center; Parks/Recreation offices; wet and dry craft/classrooms; five flexible
meeting rooms available for outside rental; a full kitchen; and a dining room
that can be divided into four areas.
.
BWBR completed a $250,000 update of the pool in 1999, which provides a
second waterslide and upgrade of aquatics amenities.
An expansion and renovation includes a new entry, multi-purpose activity
center, new child program spaces including two new rooms for birthday party
rental, more fitness and cardiovascular space, new locker rooms, improved on-
site snack bar facilities, and new banquet facilities. The expansion project also
includes a picnic/performance pavilion, an improved ice/roller hockey rink, new
plaza and drop-off at the lower level entrance, and improved landscaping.
.
181 Proposal for Architectural and Engineering Services i Elk River YMCA i January 2007
;'~ ',;
i!:'- ' r--
r ProjecrEiperience/pesign Examples
.
.
.
.
.
.
.
Shoreview Community Center:
Original Facility, Expansion/Renovation
Floor Plans
~-'
\ "
.\
\
.'
.
.
.
.
.
.
.
.
.
City
. "Hal,"
.
.
.
.
.
.
.
.
.
Lower Level, Expansion/Renovation
D Expansion
D Remodel
I
"
/
~
..J
- 1!iolr ::
_..-~..
Upper Level, Expansion/Renovation
D Expansion
D Remodel
, ' ,~
Proposal for Architectural and Engineering Services! Elk River YMCA ~ January 2007 ~ 19 B.-W_B_R
~IY
:1
I
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
City of Saint Paul: Neighborhood House/EI Rio Vista
Recreation Center, The Paul & Sheila Wellstone Center
for Community Building · Saint Paul, MN
Completion date: 2005
Total square footage: 93,500 sJ.
Total overall costs: $25 million
Construction time frame: March 2004 - December 2005
· Project designer: BWBR Architects
Pro;ect manager: Bob Verstraete
Principal in charge: Steve Patrick
Named in Senator Paul Wellstone's honor following his death in 2002, this
community center co-locates Neighborhood House, a nonprofit organization
serving the community, and El Rio Vista Recreation Center, owned and
operated by the City of Saint Paul.
The center provides abundant meeting and gathering space for cultural,
artistic, social, educational, performance, recreational and civic activities.
The facility includes a 260-seat performance space (with distance learning
technology), numerous meeting rooms and classrooms, computer labs,
two gymnasiums with basketball and volleyball courts and a walking track,
a youth center, dance/exercise room, weight room, a skate-changing/
multipurpose room adjacent to the outdoor ice rinks, commercial kitchen
and congregate dining space, food shelf, cafe, a drop-in child care center, and
office spaces for both organizations.
20! Proposal for Architectural and Engineering Services! Elk River YMCA! January 2007
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. :::
:::
.
FUTURE DINING
-,
.
.
.
.
.
.
.
.
.
f'~ r--
Proietrtxperience/Design Examples
City of Saint Paul:
Neighborhood House/EI Rio Vista Recreation Center
Floor Plans
I..
1. A:
l'
(\
~,
1
...t:.....
'!
Lower Level
I' \ \
i ~\
'.---
",., c.-......
fl,tl'LAf'ftlWlT(J'FaNC)JttN1DMl ~ ~-
,~ ---.
t -- -
(
,
_.~
I
-/ ~
E. ROBIE STREET
,.-- . - ~ .....-...-
c.---
--
r:::
\.......-
.-
i~
r
I
I
I
I
I
I
I
tu I
~ I
~ I
~ I
I
I
I
I
I
L
-
" ---.
---.
-'-
"----
----
?
---j
a
1
-----. ---. -::.:J,
--~--- ...,-' .....e:
~-~
--- /1
.-
--- .....-j
-- --, ~
---
_............ ~l
"... ----I
./ ,.../;
r~ll. ~~\S ."
1
Proposal for Architectural and Engineering Services i Elk River YMCA \ January 2007 i 21
~
BWBR
~17
g g g
ROOF
181 181 3l
:i2J 181 181
T!fiWlt Ql'SCftU
L
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
City of Saint Paul, Division of Parks & Recreation:
Hazel Park Neighborhood Recreation Center · Saint Paul, MN
Completion date: 1998
· Total square footage: 16,000 sJ.
Total overall costs: $2.1 million
Construction time frame: April 1997 - April 1998
Pro;ect designer: BWBR Architects
Pro;ect manager: No longer with BWBR
Principal in charge: Steve Patrick
.
This busy neighborhood recreation center was designed to support activities for
neighborhood children, teens, families, and seniors, and includes a gymnasium,
multi-purpose room, craft/classroom, aerobics room, game room, kitchen, and
police storefront office.
The office and reception desk are centrally located to allow visual supervision
of the facility. Office space is shared between recreation center staff and a city
police officer, who is at the center part-time as part of an outreach program.
Large flexible spaces support gatherings and craft activities; a larger, carpeted
space, which can be subdivided, is used for meetings and presentations. The
multi-purpose room was designed so that a daycare program can be instituted
in the future.
The kitchen location offers several serving options, from large gatherings in the
multi-purpose room, to concession sales and outdoor events.
The design process was as important as the final product, and was heavily
dependent on building consensus. We worked with a task force in Hazel Park
that included interested neighbors, athletic booster club members, the current
recreation center director, and a city staff liaison to identifY programmatic
requirements, analyze site options, and test schematic design alternatives.
22 j Proposal for Architectural and Engineering Services i Elk River YMCA i January 2007
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
" ~~~'ft
r---
ProjecrEXperience/Design Examples
~
..,
.~iiJ#'4;,
,
City of Saint Paul, Division of Parks & Recreation:
Dayton's Sluff Neighborhood Community Center
· Saint Paul, MN
Completion date: 1999
Total square footage: 20,000 sJ.
. Total overall costs: $3.1 million
Construction time frame: May 1998 - August 1999
. Project designer: BWBR Architects
Project manager: Steve Erickson
. Principal in charge: Steve Patrick
The recreation center serves as a neighborhood center of cultural and physical
activity and community gathering for all ages. The project represents a significant
partnership of agencies dedicated to the goal of community involvement and
academic achievement.
The 20,000 d. facility, added to Dayton's Bluff Elementary School, includes a
new entry tower for the school, 250-seat theater, gymnasium, multi-purpose space
and kitchen; Phase II includes 10,000 sJ. of school administration spaces and an
Achievement Plus community services center.
The addition's buff-colored brick evokes the nearby bluffs, while the darker tones
of the original facility create the addition's base (tied into the original building's
rooHines) and a mural landscape dances in playful detailing on the exterior walls.
Proposollor Architectural and Engineering Services \ Elk River YMCA \ January 2007j23
~
BWBR
~I7
.
.
.
.
.
.
.\
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Hamline University: Lloyd w.o. Walker Fieldhouse,
Hutton Arena Renovation · St. Paul, MN
Completion date: 1997 (Walker) · 1998 (Hutton)
Total square footage: 150,000 g.s.f.
Total overall costs: $7.95 million
Construction time frame: Fall 1996 - Fall 1997 (Walker)
. May 1997 - May 1998 (Hutton)
Project designer: BWBR Architects
Project manager: Steve Erickson
Principal in charge: Jay Sleiter
· The 72,000 s.f. Lloyd W. D. Walker Fieldhouse runs the full length of, and
creates a link between, the renamed Hutton Arena, pool building, and student
center. The connection of these spaces created, in effect, a new "University
center" for Hamline that provides for social functions as well as athletic and
fitness opportunities.
The new fieldhouse's arched roof form - historic Hutton's "icon"- is
respectfully echoed by an arched glass opening that visually connects the
two structures, as does their matching brick and brick detailing.
The new fieldhouse also creates a home and identity for the athletic department
and accommodates the needs of recreation and athletic practices for tennis,
track, baseball, softball, basketball, volleyball, gymnastics, racquetball, running/
jogging, strength and fitness training, and a competition-class pool.
The accompanying renovation of Hutton Arena provides an air-conditioned
home for varsity basketball and volleyball, as well as a new wood Roor,
renovated bleachers, lockers, concession and lounge area.
24 i Proposal for Architectural and Engineering Services 1 Elk River YMCA i January 2007
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
;r.- ~
r 'ProjecrExperience/pesig n Exo m pies
Hamline University, Klas Stadium & Event Center
· Saint Paul, Minnesota
Completion date: 2004
. Total square footage: 23,500 sJ.
Total overall costs: $7.1 million
Construction time frame: September 2003 - August 2004
Project designer: BWBR Architects
Project manager: Steve Erickson
Principal in charge: Terry Anderson
This new four-level sports and community gathering building integrates
athletics, academics, and events.
The multi-purpose center replaces Norton Stadium, built in 1922, with a
new 2,000-seat stadium and press box on the building's north side facing
the football field and track.
A four-story glass facade and entry, including a plaza-level cafe with casual
seating, a fireplace, and a space with interactive displays on Hamline's history,
grace the building's south side.
The second level includes flexible meeting rooms, classrooms and offices, while
the third level accommodates a 4,000 sJ. events hall. Locker rooms, coaches'
offices, athletic training facilities and storage are located on the basement level.
Proposal for Architectural and Engineering Services [ Elk River YMCA ~ January 2007 ~ 25
/~
BWBR
~'7
7he award-winning BWBR-designed
Lawson. Commons tower and ramp
opened in late 1999... and then became
home to BWBR in 2001.
Design Awards
As a general rule, BWBR doesn't pursue many awards. It may sound trite, but our client's
satisfaction is truly the only reward we seek. While awards are terrific for staff morale, and
some prospective clients view them as differentiating factors, they take time and dollars
away from other activities that provide greater value to the firm and to our clients. When
we do participate in awards programs, they tend to be those which benefit or support Saint
Paul or our clients, such as the Saint Paul Heritage Preservation Commission's program, or
Minnesota Physician Publishing's Healthcare Architecture Honor Roll- rather than the
"design competitions" geared to peer recognition in the architectural/design communities.
.
.
.
.
.
.
.'
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
The following list highlights some of our more recent honors and awards.
Saint Paul Heritage Preservation Commission & Saint Paul Chapter AlA
2001: Lawson.Commons Office Tower & Municipal Ramp (for new construction
in an historic district)
2000: Hamline University Lloyd W.O. Walker Fieldhouse (for sensitive design/
addition to an historic building)
Minnesota AlA
2001 Divine Detail Honor Award: Lawson.Commons Municipal Ramp
1996 Minnesota Brick in Architecture Award: University of Minnesota Basic
Sciences and Biomedical Engineering Building
National Association of Industrial and Office Properties (NAIOP)
2001: Lawson.Commons Office Tower
Minnesota Concrete & Masonry Contractors Association
· 2001: Lawson.Commons Office Tower & Municipal Ramp
· 2001: Woodwinds Health Campus
· 1998: Augsburg College Lindell Library & Information Technology Center
Minnesota Physician Publishing Healthcare Architecture Honor Roll
2006: Rice Memorial Hospital Expansion and Renovation
· 2002: Fairview Southdale Hospital Expansion
2000: Children's Hospital Garden View Medical Building
1999: St. Luke's Hospital & Regional Trauma Center
1998: North Memorial Residential Hospice
1997: St. Paul-Ramsey Medical Center (now Regions Hospital)
1996: North Memorial Medical Center
1995: WEST Health Medical Center
26! Proposal for Architectural and Engineering Services i Elk River YMCA! January 2007
.
.
.
.
.
.
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
~ .~)
/
. ,.
", -
....~
.'/ = -~
1'1 -~
~~-'-
t'"
~
,
,./
.. -,.;:
I
~
Effective project management and
an emphasis on client satisfaction has
translated into a high repeat-client rate
and a squeaky clean record for BWBR.
":--.' Ii,y,;?f,~~i't( r-----
"'Proje&t'fiperience! esig n Exa mples
Termination and Litigation
BWBR is commissioned for approximately 300 new projects each year. We manage
an average workload of between $150 million and $300 million in construction
costs each year. We have a highly successful, thriving practice and are proud to be
able to say that, with all this project activiry, our legal record remains untarnished.
II'
Repeat clients have consistently accounted for roughly 80% of our work over the
years, which we see as a testament to our commitment to client satisfaction. BWBR
has never been dismissed by a client during the course of a project, although on a
couple of occasions on long-distance projects, we and the client have agreed to assign
the final construction administration stages of the work to a local firm.
The only twO times BWBR has ever been involved in litigation involve proceedings
brought by counry governments for buildings that developed leaks more than a
decade after occupancy. Both cases were dismissed prior to trial.
We have never in the course of our 80-year history had to tap into our professional
liability insurance to settle a claim. Accordingly, we have one of the lowest
professional insurance rates of any architectural firm in the area. We are very
proud of this record.
Proposollor Architectural and Engineering Services \ Elk River YMCA \ Jonuory 2007 \ 27
~
BWBR
~'7
.
.
.
.
-.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Approach to
Proiect Design
Client-Focused Design
The new Elk River YMCA will serve as a community cornerstone for decades to
come. The best design - which combines aesthetics, function, and durability
within the designated budget - will result from a design approach that includes
your involvement. Through our work on other YMCA facilities and similar projects
throughout the Twin Cities, we have developed a process and a reputation for active
client participation to assure that all stakeholders have a voice in the project. This
approach is geared toward listening, building consensus, and executing our services
in a manner which puts your goals first.
.
.
.
.1
.'
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Program Confirmation/Proiecf Goals and Schedule
Success of a multi-partner project relies heavily on this pre-design period where the
goals and program of each entity are recorded and communicated to the design
team. BWBR is experienced with leading groups to consensus by asking questions
and seeking responses, in this case from City administration, the Parks and
Recreation Department, Economic Development Agency, and the YMCA. The
program document serves as the baseline in evaluating all future design decisions and
directions while managing expectations from day one.
BWBR will immediately propose a thorough meeting schedule with predetermined
agendas to facilitate efficient use of everyone's time. We will continuously manage
the project schedule to stay on task.
Participatory Design Process
Our design process will be exhaustive but efficient in terms of seeking information
and providing options for your evaluation. We recognize the need to meet with
Parks and Recreation staff, key City leaders, and the Planning Commission and their
staff to learn about the critical site planning and future development plan issues at
this site. The information will provide us with the correct design direction and
documentation required for the Site Plan Review Submittal the first time (we get
one try for approval if we want to stay on schedule).
During Schematic Design, we will lead you through a highly interactive process
"Visual Dialogue" process, using photos and words to explore your likes and dislikes.
The goal is to help the team establish a common "visual vocabulary" that will guide
the design of this facility. Working with these words and photographs, we will
provide you with exterior and interior building concepts specific to Elk River's new
YMCA facility.
301 Proposal for Architectural and Engineering Services 1 Elk River YMCA 1 January 2007
.
.
.
.
.'
.
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
r-
~~,
~." '"'
.;v-
l'" I
/U
,./.~............\~\
~ ...- ~."- .r
....,;;::-......
.. _ _ III __-
-.
I~
~
?Approoch tofroject Design
,.
:I
Mechanical Systems Design
In analyzing mechanical systems solutions for the aquatics space, we know there are
numerous variables to consider in providing the appropriate ventilation to the harsh
environment of this room. The YMCA has years of success (and unfortunately some
less successful) with this equipment. The YMCA's experience coupled with our
experience and ability to understand these complicated issues will create a solution
that will not only provide a safe environment for the occupants but provide many
years of uncomplicated operation and maintenance.
'I
Budget Management
Budget management must also be mentioned in any discussion of team collaboration
and participation. The BWBR team believes budget management is absolutely
integral to any project success. All of our past large YMCA projects have finished
on or under budget and on or ahead of schedule. Teaming with your
construction manager and owner's representative, we seek to manage the total
project budget, not just the construction budget. We will examine the project
budget with you to assure everyone shares a realistic set of expectations from the
beginning. We customarily recommend including alternates in the bidding
documents to provide for budget flexibility and market uncertainty as well as
staying on schedule in this proactive manner.
Design for Greatest Value
When the YMCA finally moves into the new faciliry, the construction afforded by
the project design will be pleasing inside and outside for years to come. It will be a
durable building through smart design, which will have considered and potentially
included recycled materials. It will not rely on bland rugged materials. It can be
easily envisioned that the site will have stormwater rain gardens, biofiltration
characteristics, reclaimed site materials and many more "green" features. The design
will allow the YMCA to function in a manner they wish to do so today (like fully
implementing the new Gullick principles for members and providing multi-purpose
spaces) and allow for efficient alterations and additions in the years to come (due to
the success of the YMCAs, there are very few Minneapolis YMCA facilities that exist
as they were originally built). Interior finishes will have been evaluated for cost and
life cost and most importantly originally specified into the project using national
YM CA standards.
Uncompromising Service and Leadership
In the end, our approach to the design and management of this project can be
characterized as straightforward common sense. We'll ask good questions, keep
discussions focused, encourage and build consensus, be flexible while exercising
good judgement, and last, but certainly not least, be uncompromising in the qualiry
of service we provide.
proposal for Architectural and Engineering Services \ Elk River YMCA \ January 2007 \ 31
~
BWBR
~'7
.
.
.
.
~L#aJ
Q~~afs. r4
;iil \lell Qc
:I_ ~ Ii .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Proiect Proposal
~
2"~
Project Proposal
We understand that the proposed project shall be built and owned by the City
of Elk River and occupied by the YMCA of Metropolitan Minneapolis through a
long-term lease. The City has a strong community demand for gymnasium space
and, thus, the noted need for enlargement of the conceptual plans of the gymnasium
drafted by BWBR in the spring of2006. Access control for the dual users (the City
of Elk River citizens and YMCA members) will be one of the critical issues to
address immediately. As learned from YMCA administration, the City wishes to
construct the facility by means of a construction manager. Having this integral
project partner on the team as soon as possible will add further assurance of a
successful project.
.
.
.
.
BWBR is also aware that the City has previously prepared park development
concepts. As leaders of the design process, BWBR will seek to integrate the design
of the new YMCA facility with the City's visions for the park. With a YMCA
facility envisioned as an integral component in this area, the greatest value and
community benefit can be realized by sharing utilities, services, storm water
management, parking, access, pedestrian circulation and safety, and by achieving
aesthetic continuity.
.
.
..
II
.
.
.
.
..
.
.
II
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
BWBR and its design partners understand Elk River's support of Energy City, an
initiative of the City and the Economic Development Agency, to encourage use of
renewable energy and sustainable design solutions. Secondly, we know the City's
passionate and ardent position to incorporate recycled and reclaimed building and
site materials as a model to the community as well as an ability to provide additional
project financial resources from landfill fees allocated to Elk River. As a matter of
standard practice, our design team fully endorses these goals and we will investigate
how to best achieve these goals at the project's outset. Currently, our mechanical!
engineering partner, Dunham Associates, is demonstrating their expertise in energy-
efficient design with their work on the Great River Energy Corporate Headquarters
Campus. Jon Bogart is also very knowledgeable about Sherburne County landfill
rebate opportunities. We hope to demonstrate our experience in green, smart design
at the interview.
Project Criteria
In direct response to the RFP request to provide information on selected criteria,
we offer the following:
1. The building will be designed to meet all applicable building codes at the City
and State level, including review and approval by the State Health Department
for the aquatics area.
34: Proposal for Architectural and Engineering Services l Elk River YMCA: January 2007
.
.
.
.
.
.
.
.
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
~ 1r- - .''''~i j
\ \ .flY ,!
It t!}~~-' .
r. "" 1J' i...i~,., .-
~: ~ .\L~
r--
Pr1ed Proposal
c
r-~
2. Anticipated technology in this type of building includes phone systems, a
paging system, audio systems for individual rooms, emergency call buttons
throughout the public fitness area, video capabilities, etc. The Owner typically
provides the equipment and the design team will provide documentation for its
proper installation.
3. This design team is prepared to provide construction documents in July.
Achieving this goal will rely heavily on starting where the pre-project planning
ended. See proposed project schedule on the following page. Meeting this
schedule will naturally require a well-structured, decision-making process and
we are prepared to organize project information to assist you in this regard.
4. It appears the project has been carefully studied with regards to the proposed
project budget. Our experience shows that for a new branch facility,
construction costs typically equate to 75%-80% of the project cost. This
would mean a construction cost of approximately $9.25 million.
Below is our preliminaty evaluation of the types of the construction involved
and the costs for the primary spaces in this building (using the pre-project floor
plan and added gymnasium space).
Average
Construction
avg. cost/s.f.
Cost
. Fitness/Studio
. Locker Rooms
· Gymnasium
· Aquatics
· Kids Zone
. Office/Community
Room/Member Services
15,600 g.s.f.
6,600 g.sJ.
8,600 g.sJ.
12,000 g.sJ.
5,000 g.sJ.
7,600 g.sJ.
x $140/s.f.
x 240/sJ.
x$115/s.f.
x $21 O/sJ.
x $140/sJ.
x $130/sJ.
$2,200,000
$1,600,000
$1,000,000
$2,500,000
$700,000
$1,000,000
55,400 g.sJ.
. Splash Deck
$150,000-$250,000
Construction Cost
$9.1-$9.3 million
These construction costs would appropriately align with past new Minneapolis
YMCA branch facilities for level of construction detail and finish quality of
both interior and exterior materials. Exterior materials likely will include a
brick, prefinished metal paneling and upgraded exterior pre-cast wall panels.
Interior finishes include proper athletic/fitness floorings, extensive tile finishes
in the aquatic and locker rooms areas, durable finish types on other interior
surfaces, lighting controls, advanced energy management control systems, etc.
Proposal for Architectural and Engineering Services I Elk River YMCA l January 2007 ! 35
~
BWBR
~1/
..
..
..
~6
~~.
!:>. l::
~~
~ ~
~~
~~
......~
l
~ ~
~.~
l:: :::.
~~
~~
~ ~
ii ~
~ ~.
~. ti.
~ '"
...", ;:s
=: ii
~.
"'-..<$
<; t
~~
::to
~ ii
~ ;::-..
~.~.
"'-..<$
""''''
~ ~
'" '"
;:s ;:s
~ I:t
::: <;
.., ..,
::to -.
'" 1;:
;:s !:>.
;:s
""-
'"
~
~
";;;
):
>i-.
~
~.
<;
<S
'"
it
;;t.
!:>.
1;:
~
i
"'"
!:>.
>i-.
~.
~
o
"0
~
C
......
Q
~
....
:=.
c;;
Q.
~
!:!...
c
:::I
c...
rT'l
:::I
ce
:i'
'"
~
:i'
ce
V'l
'"
~.
'"
....
~
'"
;;oc
::;:'
~
-<
==
~
'--
C
:::I
c:
Q
"<
r-.:>
=
=
'-I
c...>
'-I
~.:)
\=0:1
a"
.
.
.
.
.
.
.
.
..
.
.
.
..
..
.
.
.
.
".-.n.
.
("'l ("'l t:l ("'l en '"t:l '"t:l
tI1 '"I1 ~ 0 -01 Ol ~ 0 Ol -01 0 0 C/l D. ti n 0 ~ Ol C/l 0 C/l n C/l ~ .. 1r 1r ..
v ::r n 0
rl 0 ::s " D.; D.; 8 ::s g " '" l!. ::s E 2 ~. ~ ffo
2 " '" ~. Ol e; ~ '"I1 '" 0 1r 0- ~ ~ ~' '" " n 0 I ;;'
~ " :> .", 0: 0- ~ t:l '" '"
:;- 0 ... E. -01 g 0 -01 ~ ... ~ ~. ~ eg' 3 ... ~ '<: S:: '"I1 :3 ti g: g: n
C/l 2 2. 0: '" :r: " '" 2 '" :> ::s .. E;- 0" 0 '" n ...
2 oa '" n " :> n " '" g: :> 0 s. :: (JQ tI1 " g ~ 3 '" ~ ~
0- n :> s. "'" '" ~ 0- "'" :? n 5' '" ~ a- ~ t:l '" n ~' >< " :t, n ~
...... (JQ '" ~ ~ g O. " ~.
n '"I1 s. ... (JQ ~ & <: e; ... 0 ~ 1 " '" n ..::J ... :> 'U n 3 $ ~ -01
2 0 (JQ 0' ,,' 0' '" 0' ::r o' ti '" ::s a n
C/l ~ ~' Cl -01 0 :> < tI1 ;:; sr CJ.'l t:l " 0, 0 ~
8 " ::s ::r Z ti ~ r;: Z ::s '" " ::s ~ :> g n;' n;'
:> Q.. s. " .", 3 n ~' g '"I1 '" ..., I
!' " ...... !' :> :> 0- eg ti n e; n ~ ~
0- .-.. .::::: .", oa t:l '" ~ " a:: " '" e; ~ 0
e; ..... tv '" C/l ~ .", OJ ;u g ~ ~ 0'
:;- ;:; 'Q a "0 e; ...... :> ~. 0' '" C/l Cl ~
o. ..... ::+ Z 0 :> " " n
I g 3 Q.. : ;:; <: n;' : :3 5 ~ C/l :> ~. " :> ~ ::r 0
r;: Ol " n 0 ". ~ ::s a '" 'U ::s C/l ...... '" " ~
... '" Ol n :: <: '" (JQ 1
0 ~. g D.; ~ e:- o- ~ :;- n ~ 3 '" " C/l 0-
D.; :3 ;u ::s ~ ~ ;1- ~ eg. "
N 0- 0- '" 0 S:: a '" ;:; ... iO
...... 5' ~ s. n ..., <: o. n ~ ...... '" ......
..::J '" .. tI1 ti ~ b
I Ol (JQ <: (JQ ::s 0 >< 0 ". g 'U ~
a:: - '- '" <: '"
E. ". Q' ... g 3' ~. ~ ...... ~ '" '" ri C/l ~
'" 0 :> g. if
0 0: ~ " ~ tI1 5' a- - 0" ~
S. 0 3 Q' >< S:: e; a
::s & ;:; .", Ol
... (JQ 0 '" '" " 3 0 s- :>
::r C/l 'U r;: 0 :> O. ..., :> tI1 0, ~
0 0 'U g '" " 0
] ~ 2 r;: .", '" ~ ;: g :>
tI:l .", n ~ -3
'" '" ~ 2 a :> ~ 3 n
g :> :3 ,,'
:t, 0' <: s. '" :> C .....
:3 :> ~ e:- (JQ g n ~ i
o. 0 ~. 0
~ :> 0 ~. :>
...
n 0 3
'-" g ~.
0
:>
--I
- ~-_=I
....
o
,
....-
tv
~
'"
"'-
i2
N
::;
N
~
N
-
>0
~
N
>0
~
~
~
....
:;:
t:!
N
00
...
:::
:;;
'"
::;
-
....
~
tj;
!:l
~
I
""'11
al
-C
o
V'l
(I)- -,,,
c...
...~
~
o
-.
CD
~
.....
~
~
::r
CD
c...
C:''''1'"
CD
.
.
.
.
.
.
.
.
II
.
.
.
.
II
.
.
.
.
.
11
It
.
iii
.
..
..
III
Ii
.
.
.
.
Proiect Team
~
I
...
Steve Patrick,
AlA, LEED@ A.P.
Principal in Charge
BWBR Architects
Steve joined BWBR 26 years ago,
has been a Director in the firm since
2000, and became President/CEO of
BWER in 2005. He has extensive
experience in directing complex projects,
developing consensus among diverse
client groups, and communicating
effectively with consulting teams.
Over the years he has successfully led
projects Jor a wide range of clients,
including recreational facilities,
municipal and county governments,
churches, corporations, and colleges.
Steve's goal is to provide the City of
Elk River with the best planning
services you have ever experienced.
Qualifications
· 31 years of experience; 26 years at BWBR Architects
· Bachelor of Architecture - University of Minnesota
· Registered Architect
· Member, American Institute of Architects
· LEED~ Accredited Professional
Selected Proiect Experience
YMCA of Metropolitan Minneapolis
Elk River YMCA Master Planning/Site Study (Elk River); Emma B. Howe
Northtown YMCA Original Facility, Desk Renovation, Expansion/Renovation
(Coon Rapids); Minnesota Valley Family YMCA Original Facility, Desk
Renovation, Parking Expansion, Expansion Planning (Burnsville),' Blaisdell
YMCA Expansion/Renovation Study (Minneapolis); Downtown YMCA Desk
Renovation, Studio Expansion, Renovation Concept Design (Minneapolis);
North Community YMCA Desk Renovation, Facility Needs Assessment/Renovation
Concept Design (Minneapolis); Prior Lake YMCA Conceptual Planning (Prior
Lake); Southdale YMCA Expansion/Renovation Master Plan (Edina); Victoria
YMCA Conceptual Planning (Victoria); Prototype Facilities Planning
(Minneapolis Metro Area)
YMCA of Greater Saint Paul
Chain of Lakes YMCA Master Planning/Programming Study (Lino Lakes);
Northwest Family YMCA Desk Renovations, Expansion/Renovation Study
(Shoreview)
Red Wing Family YMCA - Red Wing, MN
Feasibility/Conceptual Design Study; Expansion/Renovation
City of Saint Paul/Neighborhood House - Saint Paul, MN
The Paul & Sheila Wells tone Center Jor Community Building
City of Saint Paul, MN
Dayton's Bluff Neighborhood Community Center; Hazel Park Neighborhood
Recreation Center; Como Park Education Resource Center Concept Design
City of Shoreview, MN
New Community Center/City Hall; Community Center Expansion and Renovation
Hamline University - Saint Paul, MN
Lloyd WD. Walker Fieldhouse; Hutton Arena Renovation
City of Burnsville, MN
Community Center Feasibility Study
City of Minnetonka
Aquatics Recreation Center Study
.
.
.
.
.
40 i Proposal for Architectural and Engineering Services i Elk River YMCA i January 2007
.
.
.
.
..
.
.
.
..
.
.
.
.
..
..
.
.
.
.
II
II
.
(iii
.
iii
II
.
iii
.
.
.
.
.
.
.
IJ
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
II
iii
.
II
.
II
.
I!I
.
.
.
.
11
.r.,.--
Greg Fenton, AlA
Project Manager
BWBR Architects
During his 14 years at BWBR,
Greg has managed an interesting mix
of projects, including YMCAs, churches,
and offices. His clients request him
again and again because he excels at
controlling budgets and schedules,
and is great at communicating with
each team member on a daily basis.
In addition to his solid management
skills, Greg has a very strong eye
for design and works hard to assure
design success. Greg will be your main
contact and champion, anticipating
potential issues and addressing them
before they become problems.
f&
D
-
r
,....... ~ ~
,.
LProject Team
Summary of Qualifications
18 years of experience; 14 years at BWBR Architects
. Bachelor of Architecture - Iowa State University
. Master of Architecture - Rice University
Registered Architect
. Member, American Institute of Architects
Experience with complex projects and recreational facilities
Selected Project Experience
YMCA of Metropolitan Minneapolis
Elk River YMCA Master Planning/Site Study (Elk River); Emma B. Howe
Northtown YMCA Original Facility, Desk Renovation, Expansion/Renovation
(Coon Rapids); Minnesota Valley Family YMCA Original Facility, Desk
Renovation, Parking Expansion, Expansion Planning (Burnsville); Blaisdell
YMCA Expansion/Renovation Study (Minneapolis); Downtown YMCA Desk
Renovation, Studio Expansion, Renovation Concept Design (Minneapolis);
North Community YMCA Desk Renovation, Facility Needs Assessment/Renovation
Concept Design (Minneapolis); Prior Lake YMCA Conceptual Planning (Prior
Lake); Southdale YMCA Expansion/Renovation Master Plan (Edina); Victoria
YMCA Conceptual Planning (Victoria); Prototype Facilities Planning
(Minneapolis Metro Area)
YMCA of Greater Saint Paul
Chain of Lakes YMCA Master Planning/Programming Study (Lino Lakes);
Northwest Family YMCA Desk Renovations, Expansion/Renovation Study
(Shoreview)
Red Wing Family YMCA - Red Wing, MN
Feasibility/Conceptual Design Study; Expansion/Renovation
Grand Forks Family YMCA - Grand Forks, SO
Grand Forks Community Wellness & Fitness Center Planning
6- Conceptual Design
City of Saint Paul
Como Park Education Resource Center Concept Design Study
City of Edina
Tri-City Skate Park Facility Study (at Southdale YMCA)
Proposal for Architecturol and Engineering Services j Elk River YMCA \ January 2007 j 41
/~
BWBR
~'7
Craig Peterson,
AlA, LEED@ A.P.
Design Leader
BWBR Architects
Craigs quest as an architect is
jOr innovative design solutions
that are firmly rooted in a clients
unique culture and goals. He listens
to a clients philosophy, goals, and
needs, and translates them into
conceptual site and building designs
that capture the essential spirit of
what the client is about. Craig
will be responsible jOr leading your
team through a meaningful
exploration of your objectives
and goals jOr this fizcility s "spirit"
as well as its material expression.
Summary of Qualifications
.
.
.
II
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
(I
.
.
II
I!!I
.
.
I!I
.
.
.
.
iii
.
16 years of experience; 9 years at BWBR Architects
Bachelor of Architecture - North Dakota State University
Bachelor of Environmental Design - North Dakota State University
Registered Architect; NCARB Certified
Member, American Institute of Architects
LEED" Accredited Professional
Selected Project Experience
· YMCA of Metropolitan Minneapolis
Elk River YMCA Master Planning/Site Study (Elk River); Prototype
Facilities Planning (Minneapolis Metro Area)
Ciry of Saint Paul/Neighborhood House - Saint Paul, MN
The Paul & Sheila Wellstone Center jOr Community Building
Ciry of Edina
Tri-City Skate Park Facility Study (at Southdale YMCA)
Mayo Clinic - Rochester, MN
Dan Abraham Healthy Living Center
Ladco Development - Clive, IA
West Lakes Wellness Campus
Augsburg College - Minneapolis, MN
Gateway Center
Buena Vista University - Storm Lake, lA
New Estelle Siebens Science Center
CrossRoads Church - Woodbury, MN
Replacement Church
Shepherd of the Lake Lutheran Church at Shepherd's Path - Prior Lake, MN
Phase I Facility
Fairview Health Services
Fairview Ridges Hospital Millennium Expansion/Renovation, Phases I and II
(Burnsville)
42 j Proposal for Architectural and Engineering Services j Elk River YMCA j January 2007
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Matt Jensen,
PE, LEED@ A.P.
Mechanical Engineer
Dunham Associates
Matt joined Dunham Associates
in 2006. He has more than II years
of experience, particularly in evaluating
existing mechanical systems and
designing new systems. A LEED"
Accredited Professional, he is dedicated
to designing high performance
buildings. His strong organizational
and communication skills, combined
with his technical knowledge and
experience, make him a valuable
asset to our team.
r--- -
~.
l~.
,........ - .. ,
r-Proied Team
C.
Summary of Qualifications
.
11 years of experience; 3 months with Dunham Associates
Bachelor of Science, Mechanical Engineering - University of Wisconsin
Registered Professional Engineer
LEED" Accredited Professional
.
Seleded Proied Experience
YMCA of Metropolitan Minneapolis
Emma B. Howe Northtown YMCA Expansion/Renovation (Edina) * t
. YMCA of Greater Saint Paul
Andover YMCA Community Center (Andover) t
St. Mary of the Lake Catholic School- White Bear Lake, MN
Expansion/Renovation * t
. Stillwater Area Schools - Stillwater, MN
Stillwater Junior High School (Stillwater)*t,. Oak-LandJunior High School
(Lake Elmo)*t; Marine Elementary School (Marine-on-St.-Croix)*t; Stonebridge
Elementary School (Stillwater)* t; Withrow Elementary (H ugo)* t; Andersen
Elementary School (Bayport) * t
Fraser Child and Family Center - Minneapolis, MN t
. Prince of Peace Lutheran Church - Burnsville, MN
Christian Life Center RenovationsH
Nativity Lutheran Church - St. Anthony Village, MN
Phase I Expansion * t
Shepherd of the Valley Lutheran Church - Apple Valley, MN
.
.
Expansion/Renovation * t
Easter Lutheran Church - Eagan, MN
Phase II Addition Schematic Design * t
*With BWBR Architects
t Work completed while employed at previous firm
Proposal for Architectural and Engineering Services \ Elk River YMCA \ January 2007 \ 43
~
BWBR
~1.7
Jay Rohkohl,
PE, LEED@ A.P.
Electrical Engineer
Dunham Associates
Jay has been actively involved
in the electrical engineering field
since 1983. He has designed
electrical systems for many different
types of commercial buildings,
including educational, offices,
clean rooms, correctional, and
manuJacturingJacilities. His design
experience includes lighting, power
distribution, uninterruptible power
systems, generator systems, and many
types of low voltage special systems.
Summary of Qualifications
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
24 years of experience; 9 years at Dunham Associates
· Bachelor of Computer Science - University of Minnesota
Registered Professional Engineer
LEED" Accredited Professional
Long-standing and successful relationship with BWBR
Selected Proiect Experience
· YMCA of Metropolitan Minneapolis
Blaisdell YMCA (Blaisdell); Ridgedale YMCA (Minnetonka)
· Elk River Independent School District #728 - Elk River, MN
New Junior High Schools (Rogers and Zimmerman); Lincoln Elementary School
(Elk River); VandenBerge Junior High School (Elk River); Handke Elementary
School HVAC Improvements (Elk River)
· Phillips Community Center - Minneapolis
Community Center Renovation
· School District 112 - Chaska, MN
Chaska East and West Middle Schools Lift Cycle Cost Analysis
· Lakeview School District - Lakeville, MN
Lakeview Elementary School Lighting, Power, and Special Systems Design
· Luther College - Decorah, IA
Center for the Arts; Jensen-Noble Music Hall Addition
· St. Peter and Paul Parish - Loretto, MN
School Addition and Gymnasium Remodeling
University of Minnesota - Minneapolis, MN
Coffman Memorial Union Renovation
Metropolitan Council/Metro Transit
East Metro Transit Facility (Saint Paul)*
Ramsey County
Public Works Facility/Sheriffs Patrol Station (Arden Hills) *
*With BWBR Architects
44! Proposol for Architectural and Engineering Services! Elk River YMCA! January 2007
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Sob Curtis, PE
Structural Engineer
Ericksen, Roed & Associates
Bob has been in the structural field
since 1968 and has been working closely
with BWBR since he joined Ericksen,
Roed 19 years ago. During that time,
he has provided BWER with excellent
structural design on a myriad of project
types, including recreational, religious,
and office facilities. Bob s role is to lead
the structural design process, assuring
the highest quality design and
documentation, as well as to coordinate
with all other engineering disciplines.
~
roiect Team
Summary of Qualifications
.
39 years of experience; 19 years at Ericksen, Roed & Associates
Bachelor of Civil Engineering - University of Minnesota
Registered Professional Engineer
.
.
Selected Project Experience
. YMCA of Metropolitan Minneapolis
Minnesota Valley Family YMCA Original Facility (Burnsville)*; Emma B. Howe
Northtown YMCA Expansion/Renovation (Coon Rapids)*
. Red Wing Family YMCA - Red Wing, MN
Expansion *
Hamline University - Saint Paul, MN
Lloyd WD. Walker Fieldhouse*; Hutton Arena Renovation *
. University of North Dakota - Grand Forks, NO
Englestad Arena Roof Erection Plan
Shepherd of the Lake Lutheran Church at Shepherd's Path - Prior Lake, MN
Phase I Facility *
. St. Andrew Lutheran Church - Eden Prairie, MN
Phase II Expansion *
. Lord of Life Lutheran Church - Maple Grove, MN
Relocation *
Lawson Commons - Saint Paul, MN
Corporate Office Building and Parking Ramp *
Mayo Foundation/Mayo Clinic - Rochester, MN
Ozmun East Administration Building and Parking Ramp *
. Washington County - Stillwater, MN
jail and Law Enftrcement Center*
*With BWBR Architects
Proposal for Architectural and Engineering Services i Elk River YMCA i January 2007 i 45
~
BWBR
~'/
Jon Bogart, PE
Civil Engineer
Bogart, Peterson & Associates
Jon s 26 years of experience in civil
planning and design has given him a
wide range of expertise and practical
know-how. His diverse background has
developed his specialized skills in site
design and planning, hydrology and
hydraulics along with utility and
roadway design. Jon is currently
working with BWBR on the Sherburne
County Public Works Facility.
He will be the projects civil engineer,
coordinating civil design work
and communication with the entire
design and construction team, as well
as with the City, County, State,
and other governing agencies.
Summary of Qualifications
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
26 years of experience; 9 years with Bogart, Peterson & Associates
Bachelor of Civil Engineering - University of Minnesota
Registered Professional Engineer
Member, American Society of Civil Engineers, Minnesota Society
of Land Surveyors
.
.
.
Selected Proiect Experience
· Sherburne County - Becker, MN
Public Works Facility*
· Elk River School System - Elk River, MN
Two Elementary Schools, Vehicle Maintenance Building, Building Addition
Elk River Ford - Elk River, MN
Seven-Acre Site with Four Bio-Retention Ponds, Two Infiltration Basins,
a 540-Parking Stall Addition, Storm Sewer Design, Architectural Site Survey
Crown College - St. Bonifacious, MN
Utilities, Drainage, ParkingJor College Dormitories; Evaluation and Design
of Water Distribution Center
University of Minnesota - Minneapolis, MN
Art Institute Buildings
Salvation Army Building - Minneapolis, MN
Underground Storm Water Storage Facility Design, Site Plan,
Architectural Site Survey
Grace Fellowship - Brooklyn Center, MN
Building Addition
Elk River Ice Arena - Elk River, MN
Site Work, Parking, and Utility Designt
Elk Park Center - Elk River, MN
Elk Park Center Commercial Complext
*With BWBR Architects
t Work completed while employed at previous firm
46: Proposol for Architectural and Engineering Services: Elk River YMCA: January 2007
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Paul Kangas, ASLA
Landscape Architect
Loucks Associates
Paul's skills as a landscape architect
allow him to design projects that blend
with the surrounding area and enhance
the project, while minimizing the
impact to the environment. He has
proven abilities in collaborating with
project teams to get the work done in a
timely, cost-effective manner. Paul will
collaborate with BWBR and the general
contractor to develop site and
landscaping concepts that complement
ftcility components and help articulate
the character of the site.
r---
Proiect Team
Summary of Qualifications
. 14 years of experience; 7 years at Loucks
Bachelor of Science, Environmental Design - North Dakota State University
. Bachelor of Science, Landscape Architecture - North Dakota State University
. Registered Landscape Architect
Member, American Society of Landscape Architects
Selected Project Experience
Ciry of Maple Grove, MN
Maple Grove Community Center/Lifetime Fitness; Civic Campus Master Plan
Ciry of Rogers, MN
Lion's Community Park
Ciry of Zimmerman, MN
Zimmerman Park System
3M Company - Saint Paul, MN
Innovation Center*
. North Memorial Health Care
North Outpatient Center (Robbinsdale)*; Level I Trauma Center Expansion/
Renovation (Robbinsdale)*; North Memorial Medical Campus, phase I
(Maple Grove)*
. HealthEast Care System
St. Joseph's Hospital Expansion and Renovation (Saint Paul)*
Lakeview Health System
Site and Facility Master Plan*; Replacement Hospital and Clinic*
Cedarcrest Academy - Maple Grove, MN
Phase I School Facility Schematic Design *
. Ridgeview Medical Center - Waconia, MN
Expansion *
*With BWBR Architects
Proposol for Architectural and Engineering Services \ Elk River YMCA \ January 2007\47
~
BWBR
~'7
Eric Swanson
Aquatics Consultant
Baker Pools
Eric has been a leading swimming pool
consultant for over 20 years. His broad
range of pool planning projects include
recreational facilities; therapeutic
facilities; interactive features; waterfalls
and fountains; and educational,
institutional, zoological, and competitive
pools. For this project, Eric will be
responsible for co-leading the design
process with BWBRfor the aquatic
space, filtration systems analysis,
and comtruction documentation of the
piping and filtration systems.
Summary of Qualifications
.
.
.-
.
· 30 years of experience
· President and Owner of Baker Pools
· Member, Minnesota Concrete Council; National Spa and Pool Institute
Selected Project Experience
· YMCA of Metropolitan Minneapolis
Minnesota Valley Family YMCA (Burnsville)*; Emma B. Howe
Northtown YMCA (Coon Rapids)*
· Red Wing Family YMCA - Red Wing, MN
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Expansion/Renovation *
YMCA of Greater Saint Paul
Southeast Area YMCA (Woodbury); Southwest Area YMCA (Eagan)
YWCA of Minneapolis
Midtown YWCA Sports Center (Minneapolis)
Saint Paul Public Schools - Saint Paul, MN
Arlington High School
College of St. Catherine - Saint Paul, MN
Butler Building Pool
Flagship Athletic Club - Eden Prairie, MN
Minneapolis Athletic Club - Minneapolis, MN
Pool and Yacht Club - Lilydale, MN
The Marsh Center for Balance and Fitness - Minnetonka, MN
.
.
.
.
.
.
Oak Ridge County Club - Hopkins, MN
Courage Center - Golden Valley, MN
Bloomington Care Center - Bloomington, MN
Interlachen Country Club - Edina, MN
Bearpath Golf and Country Club - Eden Prairie, MN
Treasure Island Resort and Casino - Red Wing, MN
.
.
48 i Proposal for Architectural and Engineering Services: Elk River YMCA: January 2007
.
.
.
.
.
.
.'
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.- -
~-
"
I
,
""
~
\ "Iit-<-" ,
\ ,
I
l'
..
\
~
,,\~
'1--.,-
,
(
I'
I
i.
t>
, ...
References
Emma B. Howe Northtown YMG1
Shoreview Community Center
References
.
.
.
.
.
.
.~
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
We consider references to be one of the best means for you to judge the quality of
our work, as well as the responsiveness of our staff. We encourage you to contact
any or all of the following individuals regarding their experience with our firm or
the project team.
Mark Hennessy
Yvonne Anderson
Executive Director
Community Development Director
YMCA of Metropolitan Minneapolis
952.838.3686
Red Wing Family YMCA
651.388.4724
Role ill the project: Owner
Role ill the project: Project Owner
Representative
Jerry Haffeman
Director of Parks and Recreation
Shoreview Community Center
651.490.4751
Joe Maddy
Vice President
R]M Construction
763.383.7600
Role ill the project: Owner
Anita Lancello-Bydlon
Vice President of New Development
YMCA of Metropolitan Minneapolis
612.371.8700
Role ill the project: General Contractor
Mark Coudron
Senior Vice President
Kraus Anderson Construction Co.
Role ill the project: Owner's
Representative/Project Director
612.332.7281
Role ill the project: General Contractor
Chad Lanners
Executive Director
Brian Benson
Emma B. Howe Northtown YMCA
Administrator
763.717.1810
Sherburne County
763.241.2701
Role ill the project: Owner
Role ill the project: Owner
50! Proposal for Architectural and Engineering Services! Elk River YMCA! January 2007
.
.
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Additional
Required Information
AC08Q. CERTIfiCATE OF LIABILITY INSURANCE 7' ~
::::-:::i:.=;:'.~' ~~~i:U.:!!t.:
-,.....--.,- ,-----~.
..,=-~.:-_;--- - -1~fra"-.' t-"'~_
",,,._,,.Nt.._ ~ 'I
i1.........."...~ i~.f
;;;;-- t-
=
- - .
;:~..~:~:
.; ... .
;
,......,~ ...-us_ _lttS_ ....__,." ,II ~..__...
,....."..._-" -...-.........-"'"..--......
_~..._I_~r ............
.,,'m..."_.,' _'............
u..J, _
11'-._. -.' 0-11..
11._._.-
,"".'.'
-,.
-.-
~-~-- ----~
-....-------
.,--.--.....-
,-----
:.::-u:;::;: ~_
Evidence of Insurance Coverage
Insurance
.
.
-.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
We will be pleased to provide an insurance certificate upon request, within
a reasonable timeframe of the execution of the Contract and prior to the
commencement of any work under the Contract, as will each of the engineering
consultants on our team. BWBR carries the insurance coverage noted below.
We would like to note that in our history of more than 80 years, we have never
had to file a claim with our insurance provider.
Commercial General Liability:
.
Carrier: Fidelity & Guaranty Insurance Co.
Coverage: $2,000,000 property/casualty/$I ,000,000 per event;
$5,000,000 umbrella
Professional/Technical Liability:
.
Carrier: Continental Casualty Co.
Coverage: $3,000,000 (includes errors & omissions)
Litigation, Mediation, Arbitration, Termination
See previous page entitled Litigation/Termination.
Applicant Assurances Form
Stephen P. Patrick, the signer of the form below, is also our firm's authorized
representative who can be held accountable for all representations.
Exhibit A
Applicant Assurances
TIle applicant hereby assures and certifies:
1. TIut the individual signing the assurance form on behalf of the individual,
partnership. company or corporation named in the proposal possesses the
legal authority to execute a contract for the proposed work.
2. That the firm(s) agree(s) to comply with all applicable federal, state and local
compliance requirements.
3. That the firm(s) is/are adequately insured to do business and perform
the services proposed.
BWBR Architects, Inc.
(NAME OF FIR,\l)
~
380 St. Peter Street, Suite 600
St. Paul, MN 55102-1996
(OFFICIAL ADDRESS)
(TlTI p) CEO/President
(OATP) January 18, 2007
52l Proposal for Architectural and Engineering Services: Elk River YMCA: January 2007
.
.
.
_AlA Document 8431'" -1993
Architect's Qualification Statement
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
DATE: 18 January 2007
SUBMITTED TO:
City of Elk River, YMCA of Metropolitan Minneapolis, LaSalle Group
ADDRESS:
Lori Johnson, City Administrator
City of Elk River, Minnesota
13065 Orono Parkway
Elk River, Minnesota 55330
NAME OF PROJECT (If Applicable): Elk River YMCA
ADDITIONS AND DELETIONS:
The author of this document has
added information needed for its
completion. The author may also
have revised the text of the original
AlA standard form. An Additions and
Deletions Report that notes added
information as well as revisions to
the standard form text is available
from the author and should be
reviewed. A vertical line in the left
margin of this document indicates
where the author has added
necessary information and where
the author has added to or deleted
from the original AlA text.
This document has important legal
consequences. Consultation with an
attorney is encouraged with respect
to its completion or modification.
Tom LaSalle
LaSalle Group
2001 Killebrew Drive, Suite 308
Bloomington, Minnesota 55425
Phil Nyvall
YMCA of Metropolitan Minneapolis
4100 28th A venue South
Minneapolis, Minnesota 55406
1. BASIC INFORMATION
~ 1.1 Architect: (Firm Name)
BWBR Architects, Inc.
~ 1.2 Business Address:
380 St. Peter Street, Suite 600
St. Paul, Minnesota 55102
~ 1.3 Telephone Number:
651.222.3701
~ 1.4 Person to Contact:
Stephen P. Patrick, President/CEO
~ 1.5 Type of Organization: (Check one)
] Individual or Sole Proprietorship
] Professional Corporation/Association
[ X ] Corporation
] Partnership
AlA Document 8431 ™ - 1993. Copyright @ 1963, 1979 and 1993 by The American Institute of Architects. All rights reserved. WARNING: This AlA"
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA" Document, or any
portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AlA software at 14:32:11 on 01/17/2007 under Order No.1000248891_1 which expires on 10/7/2007, and is not for resale.
User Notes: (1783993963)
1
.
.
.
] Joint Venture*
] Other*
*If Joint Venture or Other, give details.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
~
2. GENERAL STATEMENT OF QUALIFICATIONS
BWBR Architects is a full-service architectural and interior design firm. Services offered by BWBR include:
campus, site and facility master planning; space planning and programming; architectural design and
documentation; interior design and documentation; approval process assistance; field verification; facility
evaluation/condition reports, ADA, life safety and building code analysis; furniture, furnishing, and equipment
planning, selection and specification; imaging and visualization (hand sketches, computer modeling/animation;
model construction); cost estimating; record and as-built drawings and documentation; coordination of engineering
services and specialty consultants; and construction administration.
3. GENERAL INFORMATION
(This information may be provided via the Architect's brochure which may be attached and listed in Article 8.)
~ 3.1 Names of Principals:
Terry L. Anderson, AlA; Stephen P. Patrick, AlA, LEED@ AP.; Timothy J. Sessions, AlA; Peter G. Smith, AlA;
Brian B. Buchholz, AlA, ACHA; John A Strachota, AlA, LEED@ AP.; Donald R. Thomas, CID; James E. Davy,
AlA, LEED@ AP.; Stephen Manlove, Assoc. AlA; Richard W. Dahl, AlA; Katherine 1. Leonidas, AlA, LEED@
A.P.; Robert J. Verstraete, AlA; Wendy Elliott; Thomas 1. Dornack
~ 3.2 Professional History:
BWBR Architects is a multidiscipline firm of approximately 127 professionals with a diverse practice built around a
collaborative, client-focused approach that includes users in the design and decision-making effort. For most of the
last decade, repeat clients have comprised 80% of our annual work. We see this as a powerful testimony to our
philosophy that the job is not done until the client is satisfied.
BWBR Architects' true beginnings can be traced back to 1922, when Bill Ingemann opened his sole architectural
practice in St. Paul. In 1941, a young architect named Milton Bergstedt joined him - the man for whom the first "B"
in BWBR Architects stilI stands. By the end of the 1950s Ingemann had departed and the firm had incorporated as
Bergstedt & Hirsch. The rapidly expanding practice was actively serving the office, municipal, school, banking, and
religious markets. The 70s brought another name change to Bergstedt, Wahlberg Bergquist & Rohkohl, which by
the decade's end was simplified to BWBR Architects. The 70s also saw the firm expand into health care, which
today represents more than half of the tirm's annual workload. Besides health care, today our practice includes
office, corrections/detention, education, industrial, recreation, and worship facilities. BWBR's building designs are
still efficient, durable and timeless. And while computers and CAD have changed virtually every area of our
business, Milt Bergstedt's early values of hard work, integrity, teamwork and unflagging client service remain a
philosophical mainstay.
~ 3.3 Registration Status:
BWBR Architects is a Minnesota corporation.
~ 3.4 Professional Affiliations:
BWBR Architects supports numerous professional and industry groups through corporate memberships and/or
active participation by individual members of the firm. These organizations include:
· AlA American Institute of Architects (National level and AlA Minnesota)
· CSI Construction Specification Institute
· IIDA International Interior Design Association
· IFMA International Facility Managers Association
AlA Document B431'M -1993. Copyright @ 1963,1979 and 1993 by The American Institute of Architects. All rights reserved. WARNING: This AIA*
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution 01 this AlA'" Document, or any
portion 01 It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AlA software at 14:32:11 on 01/17/2007 under Order No.1 000248891_1 which expires on 10/7/2007, and is not for resale.
User Notes: (1783993963)
2
.
.
.
.
SDA
MAS A
ACA
SMPS
SHRM
ACHA
Society for Design Administration
American Association of School Administrators
American Corrections Association
Society for Marketing Professional Services
Society of Human Resources Managers
American College of Healthcare Architects
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
~ 3.5 Key Personnel:
Principals - 14; Senior DesignersfProject Planners - 5; Project Managers - 9; Project Architects - 20; Intern
Architects/CAD Technicians - 30; Interior Designers - 14; Construction Administration, Quality Assurance,
Specifications - II; Project Support Staff - 10; Operations - 12; Student Interns - 2.
~ 3.6 Total Number of Staff:
127
~ 3.7 Number of Registered Architects:
44 Minnesota registrations, 27 active registrations in other U.S States, IS NCARB certifications
~ 3.8 Honors and Awards:
See preceding pages
~ 3.9 Professional and Civic Involvement:
BWBR is involved in numerous civic and professional activities, including Minnesota AlA, Saint Paul Chapter AlA,
Habitat for Humanity, United Way, and a wide range of social services agencies. BWBR also provides community
design services regularly, such as the Saint Paul Equestrian Facility and the Saint Paul Police Canine Cemetery.
4. RELATED PROFESSIONAL SERVICES
(List proposed consultants, if applicable.)
~ 4.1 Structural:
Ericksen, Roed and Associates; see preceding pages.
~ 4.2 Mechanical:
Dunham Associates; see preceding pages.
~ 4.3 Electrical:
Dunham Associates, see preceding pages.
~ 4.4 Interior Design:
.
.
.
.
~ 4.5 Others:
Loucks Associates (Landscape Architecture)
AlA Document B431lM -1993. Copyright @ 1963,1979 and 1993 by The American Institute of Architects. All rights reserved. WARNING: This AlA-
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA- Document, or any
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AlA software at 14:32:11 on 01/17/2007 under Order No.1 000248891_1 which expires on 10/7/2007, and is not for resale.
User Notes: (1783993963)
3
.
,
.
.
.
Bogart, Pederson & Associates (Civil Engineering)
Baker Pools (Pool Consultant)
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
,
.
5. PROJECTS
(Projects for which personnel of this firm had responsible charge while associated with other firms are indicated by
an asterisk.)
~ 5.1 The following projects are representative of the Architect's recent work. A brief description of each project is
attached.
See preceding pages
~ 5.2 Other representative projects with dates of completion:
See preceding pages
6. REFERENCES
Mark Hennessy, Executive Director, Red Wing Family YMCA (651.388.4724)
Jerry Haffeman, Director of Parks and Recreation, Shoreview Community Center (651.490.4751)
Anita Lancello, District Executive, YMCA of Metropolitan Minneapolis (612.371.8700)
Chad Lanners, Executive Director, Emma B. Howe Northtown YMCA (763.717.1810)
Yvonne Anderson, Community Development Director, YMCA of Metropolitan Minneapolis (952.838.3686)
Joe Maddy, Vice President, RJM Construction (763.383.7600)
Mark Coudron, Senior Vice President, Kraus-Anderson Construction Company (612.332.7281)
Brian Benson, Administrator, Sherburne County (763.241.270 I)
7. STATEMENT OF POTENTIAL CONFLICTS OF INTEREST
BWBR is not aware of any potential conflict of interest issues.
8. ADDITIONAL INFORMATION
(If attachments are provided, list them here.)
ARCHITECT:
By:
I hereby certify that, as of the above date, the information provided in this Architect's Qualification Statement is true
and sufficiently mplete so as not to be misleading.
gna e)
Stephen P. Patrick, AlA, LEED@ A.P., President/CEO
(Printed name and title)
AlA Document 8431 ™ - 1993. Copyright @ 1963. 1979 and 1993 by The American Institute of Architects. All rights reserved. WARNING: This AlA'"
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA'" Document, or any 4
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AlA software at 14:32:11 on 01/17/2007 under Order No.l000248891_1 which expires on 10/7/2007. and is noller resale.
User Notes: (1783993963)
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
...
Fee Proposal
I-
Fee Structure
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
We acknowledge that professional architectural and engineering fees are part of the
overall budget and therefore important. At the same time, we also believe that fees
should just be one of the selection criteria. Experience, qualifications, and ability to
collaborate in a team process may be as - or more - important.
Our goals when structuring a fee proposal are straightforward:
To establish a well-defined project scope, and scope of professional services,
that enables us to better determine an appropriate fee structure
To establish fees that permit us to provide the services required to meet your
objectives
· To conclude fee discussions with a sense of fair treatment for all parties
And, we are always willing to discuss our proposed fees to arrive at a fair and
equitable agreement, should there be questions upon submittal of a fee proposal.
Typical reimbursable expenses include travel and long-distance telephone when/as
appropriate, printing (including drawing documents, bid sets, etc.), messenger/
delivery services, ete. Actual costs will vary based upon project scope and schedule.
We monitor expenses very closely and advise our clients in writing of any potential
adjustments.
We understand that clients want, and need, to feel that our fees are appropriate
to the project, and reasonable. BWBR has built its reputation on client service.
In fact, more than three-quarters of our annual business is with repeat clients;
we believe this illustrates their perceived value of their investment with us. Feel
free to speak with some of our current clients (see References section) to hear
their perspective.
54: Proposal for Architectural and Engineering Services: Elk River YMCA: January 2007
-I
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
f'
c::'
r---
ree Proposal
T-~
Fee Proposal
We have thoroughly reviewed the required services in your RFP. With our
experience and prior knowledge of the project, in conjunction with our team's
consulting partners, we have arrived at a proposed fee which we feel meets the
compensation goals noted on the previous page.
We have also made some assumptions where services might affect the fee proposal
but were not specifically addressed in the RFP. Where we have assumed a particular
service is not included, we would be pleased to discuss the addition of that service to
the contract if and as the YMCA or the City desires.
The Design Services Team (BWBR and its consultant team) proposes the following:
1. Fee for architectural, interior design, mechanical and electrical engineering,
civil engineering, landscape design, and aquatics design and engineering for
Schematic Design, Design Development, and Construction Documentation
. 5.95% of construction contract costl
2. Fee for Design Services Team for Construction Administration
1.35% of construction contract cost}
3. Estimated reimbursable expenses: Expenses incurred are billed at 1.15 our cost.
We will not charge for mileage incurred.
Estimated at 0.6%-0.8% of construction contract cost2
I Based on the assumption of a minimum construction contract cost of $9.1-$9.3 million
2 Based upon our experiences with past YMCA projects
4. Design services specifically not included in item 1 and 2 above:
LEEDs Certification process
. Commercial kitchen design consultant
Acoustical engineering
. Land surveying
. Audio/video system design
Proposal for Architectural and Engineering Services \ Elk River YMCA \ January 2007 \ 55
~
BWBR
~'7
.
\
Proposal for
Architectural and
t
, Engineering Services:
i' ~ mr 'II If '\ 1
i' ~'J
~
B_W BR
~CHI7
380 St. Peter Street
Suite 600
Saint Paul, MN 55102
651.222.3701