Loading...
5.7. PCSR 02-13-2007 . . . City of Elk River REQUEST FOR PLANNING COMMISSION ACTION Agenda Section Plannin Items Item Description Conditional Use Permit Amendment for a building extension to Warehouse 2 for GRE Case# CD 07-05 Location 17845 East Highway 10, Great River Energy. Introduction Item Number 5.7 Prepared by Sheila Gume , Senior Planner Reviewed by Jeremy Barnhart, Planning Manager The applicant is requesting approval to amend the CUP to allow an expansion! addition on GRE building No.2 for their mobile equipment. Attachments . Request for Action . Location Map Action Requested Staff is recommending the Planning Commission recommend approval of the request with the conditions as outlined. Planning Commission Action Motion by _ Follow Up Second by _ Vote Case File: 07-05 Page 2 . Location: 17845 East Hwy 10 . . Zoning: Land Use: Light Industrial It Adjacent Zoning: Adjacent Land Use: N - Public/semi public E - Highway Business S - Highway Business W - Highway 10 N - R3, Cl E-BP S -It W - Highway 10 Site Area: 26 acres Floor Area: Building = 4,000 sq. ft. Addition = 2,304 sq. ft. Total =6,304 sq. ft. Parking Conforms: Land Use Plan - Yes Zoning Code - Yes Subdivision Code - Yes 60 Day Rule:Action must be taken on this request by February 18, 2007 Overview As part of the plant operations Great River Energy uses front end loaders and vacuum trucks along with other mobile equipment, in order to have these machines operable in the winter indoor storage is necessary. Due to the size of this equipment it does not fit into existing buildings, therefore an addition to existing GRE building No.2 is necessary. Applicable Regulations Conditional Use Permit The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: 1. Will not endanger, il'!Jure or detrimentallY ciffect the use and el'!Jqyment of other properry in the immediate viciniry or the public health, safery, morals, comfort, convenience or general we!fare of the neighborhood or the ciry. The proposed addition is to an existing building that is not visible off the property. It is not expected to affect other property. 2. Will be consistent with the comprehensive plan. The addition is to an existing building that is consistent with the Comprehensive Plan and predominant land use. 3. Will not impede the normal and orderlY development and improvement of surrounding vacant properry. Surrounded area is developed. S,\PLANNING\Case Files\2007\CUP\CU 07-05 GRE Expand (Ameson)\pC 2-13-07.doc . . . Case File: 07-05 Page 3 4. Will be served adequatelY ly and will not adverselY qffect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer {)Istems, parks and schools; and will not, in particular, create trciflic congestion or interference with trciflic on aqjacent and neighboring public thoroughfares. It does not appear that the addition will interfere with traffic on adjacent and neighboring public thoroughfares. 5. Will not involve uses, activities, processes, materials, equipment and conditions 0/ operation that will be detrimental to a1'!Y persons or proper!J because 0/ excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations. It does not appear that the addition will be detrimental to any person. 6. Will not result in the destruction, loss or damage 0/ a natural, scenic or historic feature 0/ mqjor importance. The addition is proposed on an existing paved surface. No other impacts are expected. 7. Will fullY complY with all other requirements 0/ this Code, including a1'!Y applicable requirements and standards for the issuance 0/ a license or permit to establish and operate the proposed use in the ciry. As proposed the addition complies. If denial of such a permit should occur, it shall accompany recommendations or determinations by [mdings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. In the review of the standards for CUP as outlined, it appears that the addition is consistent with all of these standards. Analysis The GRE campus has many different buildings and uses, several of which are metal sided. The proposed addition will be metal sided and will match the existing building. The building extension/ addition will be insulated and heated. The location of the addition is on an existing paved surface, limiting site impacts. The addition is for storage of equipment that requires warm storage in the winter. The addition has minimal impacts to the site; it is basically an extension of building number 2. Recommendation Staff recommends that the Planning Commission recommend approval of the CUP to allow the 2,500 square foot addition to existing building number 2; with the following conditions: 1. The building shall meet all applicable building codes. 2. The building shall meet all applicable fire codes. 3. The addition shall be a maximum of 2,500 square feet and 20 feet in height. Respectfully Submitted Sheila Cartney Senior Planner S:\PLANNING\Case Files\2007\CUP\CU 07-05 GRE Expand (Arneson)\PC 2-13-07.doc , \ \ \ \, \ \" , , 1\ \ ' \--------..- '---/ { / \~ '\ \-:; \,\'r'l " 1 I \ \ ,.Ii: \~, 11 w" -', \(0 '" 1 1 \<in \-- 1 \ \1--' ~; \ \. I\ ~\i\, \ ~~ ~ I, ~, '/~/;~1' I I: ):___J"- Y .2 , ~ <9 i~ POINT) ,I ~ cF;/,'c<;", i~~"':; ,,<s~ ;7 I ~ ,","". - ',;J,v,', ',," I ~ "" :'~fl(\ i ~ /'~ ~ i <" 0 f' I g b 1 ~ , i 'I ! ~~~ ......... ' , o~:f, I l ' TM:T'irJ(R!E:4JSEfI' ~ ~~~~........ I I' rl,fjDr+ 11J'j,J!j),1~ '{'QWN~O\\1ES, ~--"''':-....I >-\. !;-II, C, 'fi ~~J':' 'C, I ' II !-f' I, I' Ii' " I ~ ilJl II ~~~~~'';'''''Ii I ..: II: "J~INI Iii I,) ~~ ~'~ I , ~, ,:: , '\ I !: hi ! i ~I I i \ ~-, '- J11 i i t'i~ ,/ I ',' 1'1'1 H I 1"'''-','' I i I ; eLi " !I~ . I -"'ID C I :=;y--:;--\ \\\\~2'FD I~ '/1 I ~j I \J \ II \ 1\' ,..,iI,1 '<'~:,~~,\( Ii ><r' J '.~ z <r --; ,:;:, -,- "---i '- '~ Location Map ~ N Case Number: CU 07-05 GRE . Great River Energy Elk River Station Equipment Storage Garage (extension to Warehouse 2) Great River Energy operates a power plant on the Elk River campus at the intersection of Highways 10 and 169. This facility operates around-the-clock (24/7) and has 43 employees, at least five (5) of whom are at the facility at all times. As part of the plant operation, large mobile equipment (front end loaders and vacuum truck) are used. To keep this equipment usable in the winter and to follow manufacturer's recommendations, indoor storage of this equipment is advised. This equipment is larger (height) than previous plant equipment and does not fit in any existing plant buildings. . :fJ I rq; 1-1 Wi s\1 A ~'x 48'x J;tj' building extension is planned on the north side ofGRE Building No.2 to store the large mobile equipment. The building extension will be a pole, framed building with metal siding, similar to multiple other facilities on the Elk River campus. The building will be heated and insulated and have two (2) 16'(h) x 14'(w) Energy Saver doors and one (1) service door. The area where this building will be is currently asphalted. No expected impact on the site is expected. . DATE RECEIVED ! <;}- let -61.p . c ~ QoK 7(;; 7 / 1L-[{ -~015 T.12 ~ fJ .--ed( , ~'t,l' ~~ ~~ ~ m m x~ ~ ,,,,, , , ~~ ... ~ ... ~g ~~ m Ii ~- m ...... ~~ m ~ ~ ~ 0" i!' J:p) ~~ 0:;: e Si1 1; Si1 ~ %-< '" ...> ~~ ~ m'" 0 0" ~fij o~ Si1 ", E~ ~ "" " -< m.. " ~-; ~" wU: ~ 0 rn ~ "'- mm " o~ ~8 >> <'" me . ;::r:;:r ~t;; -<e 0% " !!:!M1 " 0> R:'" ... " ~ n~ >'" " "tl~ ffi e ~ c ~~ Nm J-;o ~m 10 ()m ?;< m o . . 5'-0. )> ~~ "n ~~ E "m )> ,," r- 0'" r- -<0 -<-< (f' 0", "m m om (/ ..w ---< " <5 '" > :z :;: ~ ~ 0 ~ '" " ~ z " 1'"'-"1" (J) JOB. TITLE: AQC INC. \'.-.J I~ DRAWN BY: GK DATE: 11/22/0(, SALESMAN: ---< REV. It-DA TE: CUS TOMERS INITIAL: .. Ii ~ m/ l" ~ -< m i!' C',-< \ I 4-/