Loading...
6.12. SR 02-20-2007 City of Elk River REQUEST FOR CITY COUNCIL ACTION Agenda Section Meeting Date Communi Develo ment Pebma 20, 2007 Item Description Conditional Use Permit Amendment for a building extension to Warehouse 2 for GRE Case# CU 07-05 Item Number 6.12. Prepared by Sheila Cartne , Senior Planner Reviewed by Jeremy Barnhart, Planning Manager Location 17845 East Highway 10, Great River Energy. Introduction The applicant is requesting approval to amend the CUP to allow an expansion/addition on GRE building No.2 for their mobile equipment. Attachments · Request for Action · Location Map Action Reauested Staff is recommending the City Council approve the request with the conditions as outlined. City Council Action Motion by _ Second by _ Vote Follow Up Case File: 07-05 Page 2 Zoning: Location: 17845 East Hwy 10 Adjacent Zoning: Site Area: Floor Area: Parking Conforms: I1 Land Use: Light Industrial N -R3, C1 E-BP S - I1 W - Highway 10 Adjacent Land Use: N - Public/semi public E - Highway Business S - Highway Business W - Highway 10 26 acres Building = 4,000 sq. ft. Addition = 2,304 sq. ft. Total =6,304 sq. ft. Land Use Plan - Yes Zoning Code - Yes Subdivision Code - Yes 60 Day Rule:Action must be taken on this request by April 19, 2007 (City extended). Overview As part of the plant operations Great River Energy uses front end loaders and vacuum trucks along with other mobile equipment, in order to have these machines operable in the winter indoor storage is necessary. Due to the size of this equipment it does not fit into existing buildings, therefore an addition to existing GRE building No.2 is necessary. Applicable Reaulations Conditional Use Permit The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: 1. Will not endanger, if!Jure or detrimentallY qffect the use and ef!Jqyment of other proper(} in the immediate vicinity or the public health, sqfety, morals, comfort, convenience or general we(fare of the neighborhood or the city. The proposed addition is to an existing building that is not visible off the property. It is not expected to affect other property. 2. Will be consistent with the comprehensive plan. The addition is to an existing building that is consistent with the Comprehensive Plan and predominant land use. 3. Will not impede the normal and orderlY development and improvement of surrounding vacant proper(}. Surrounded area is developed. 4. Will be seroed adequatelY ry and will not adverselY qffect essential public facilities and services including streets, police and fire protection, drainage, rifuse disposal, water and sewer !)Istems, parks and schools; and S:\PLANNING\Case Files\2007\CUP\CU 07-05 GRE Expand (Arneson)\CC 2-20-07.doc Case File: 07-05 Page 3 will not, in patticular, create trriffic congestion or interference with trriffic on atfjacent and neighboring public thoroughfares. It does not appear that the addition will interfere with traffic on adjacent and neighboring public thoroughfares. 5. Will not involve uses, activities, processes, materials, equipment and conditions of operation that Will be detrimental to al!Y persons or proper(y because of excessive trriffic, noise, smoke, fumes, glare, odors, dust or vibrations. It does not appear that the addition will be detrimental to any person. 6. Will not result in the destruction, loss or damage of a natural, scenic or historic ftature of mqjor impottance. The addition is proposed on an existing paved surface. No other impacts are expected. 7. Will fullY complY with all other requirements of this Code, including al!Y applicable requirements and standards for the issuance of a license or permit to establish and operate the proposed use in the city. As proposed the addition complies. If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. In the review of the standards for CUP as outlined, it appears that the addition is consistent with all of these standards. Analysis The GRE campus has many different buildings and uses, several of which are metal sided. The proposed addition will be metal sided and will match the existing building. The building extension/ addition will be insulated and heated. The location of the addition is on an existing paved surface, limiting site impacts. The addition is for storage of equipment that requires warm storage in the winter. The addition has minimal impacts to the site; it is basically an extension of building number 2. Recommendation The Planning Commission held a public hearing on this item at the February 13,2007 meeting and recommended approval. Noone spoke at the public hearing. Staff recommends that the City Council approve the CUP to allow the 2,500 square foot addition to existing building number 2; with the following conditions: 1. The building shall meet all applicable building codes. 2. The building shall meet all applicable fire codes. 3. The addition shall be a maximum of 2,500 square feet and 20 feet in height. Respectfully Submitted Sheila Cartney Senior Planner S:\PLANNING\Case Files\2007\CUP\CU 07-05 GRE Expand (Ameson)\CC 2-20-07.doc 178 177 /.,- ~ c ~ 1li '" ~ 5 8 0- J: ~ :;:: ~ 9 8 c:; ~ ~ " ~ '"' I 0 ~ ~ " ~ .ll w '" co "' 0 E l2; ~ ::l ~ 0 0 ~ 11 u: ill Sl co z 52 ~ 9> Vi r c) Location Map 1r N Case Number: CU 07-05 GRE Great River Energy Elk: River Station Equipment Storage Garage (extension to Warehouse 2) Great River Energy operates a power plant on the Elk River campus at the intersection of Highways 10 and 169. This facility operates around-the-clock (24/7) and has 43 employees, at least five (5) of whom are at the facility at all times. As part of the plant operation, large mobile equipment (front end loaders and vacuum truck) are used. To keep this equipment usable in the winter and to follow manufacturer's recommendations, indoor storage ofthis equipment is advised. This equipment is larger (height) than previous plant equipment and does not fit in any existing plant buildings. _i.L4J I rq; 1.-, 7;,i)L( :$ A ~'x 48'x lXi' building extension is planned on the north side ofGRE Building No.2 to store the large mobile equipment. The building extension will be a pole, framed building with metal siding, similar to multiple other facilities on the Elk River campus. The building will be heated and insulated and have two (2) l6'(h) x l4'(w) Energy Saver doors and one (1) service door. The area where this building will be is currently asphalted. No expected impact on the site is expected. DATE RECEIVED ld~ \t1-~ /-r :llfl1lNI S?f3W01Sn:J :31 If 0-11 '^3C1 f- :NlfWS3l\fS ~O/U/II :31lfO )/') :)..g NmlfClO ~I N ':JNI :J0\7' :3Ull gor (j) ~ 0 ~ " '" '" W i5 0 :z: <( <( 0 g " " f= "' CQl5 u "' ~ w l" w~ <J) "0 ...... --J 0... >-0 --J al'" <( ~6 => w" ,,~ ~~ <( 8~ "L ~ .v-.1' " ... 0 "' '" % ~~ ~ ~u ; W "''' <0 !t:02 <J)~ %0 3'" ~ ~ffi 85 W ~~ W -~ % lLU lL % < 0 ;{ ~~ ,-lL lL ~w in 'lL ~ lL" 0 "'0 % "'a lLO ~ "W ;J <... 0 Wo U" ...% co Q% Wu oj "'0 i W "'w "'... ~ -~ ~ ~~ ~~ ~~ ~O-,S ~:E ~:5 ww ~~ cjiJ \ I l' ~ o W W '" ~~ i~ o L1.I ffi~ 01 LU(S" o::~ LU~ ~---- o