**CONSENT AGENDA ITEM 5.2.**
July 28, 1994
File: 230-216-30
Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
Post Office Box 490
Elk River, MN 55330
RE: FOREST LAKE CONTRACTING
CHANGE ORDER NO. 1
Dear Council Members:
Attached is Change Order No. 1 for the Forest Lake Contracting contract for the construction
of School Street, Jackson and Freeport A venues. The Change Order covers two items. The
first is a clarification of the hydrant salvaging and reinstalling of new equipment on School
Street. The Contractor's original bid was to only remove and reinstall the old equipment.
Municipal Utilities wanted new equipment installed. Therefore, the Change Order is being
written for the cost of the new material. It is in the amount of $1,403.00 for each of six
installations, for a total cost of $8,418,00.
The second item covered by this Change Order would be the construction of a Park & Ride
facility, located on the old City Hall site at TH 10 and Main Street. This will also operate
as a parking area for the new Chamber of Commerce office. There are two components to
this Change Order. The first is site grading, which is proposed to be accomplished on an
hourly equipment basis. The second is the construction of the concrete curb and gutter,
gravel base, bituminous surfacing, and striping of the parking area. The Contractor has
submitted hourly rates for the site grading work. It is anticipated that the total cost of this
work would be in the range of $3,000.00 to $5,000.00. The Contractor has also submitted
unit prices for the remainder of the construction. Based on the estimated quantities, the total
cost of this construction is $25,826.85. Therefore, the total cost of the improvement to the
parking area is estimated to be between $29,000.00 and $31,000.00,
We understand that this work is proposed to be financed by the HRA, however, they are not
scheduled to meet until Thursday, August 11, 1994. In an effort to keep this project
moving, we are recommending City Council approval of Change Order No.1, contingent
upon the HRA agreeing to pay for the Park & Ride facility construction.
.
Honorable Mayor and City Council
July 28, 1994
Page Two
If you have any questions regarding this information, I will be in attendance at your
August 1, 1994, City Council meeting,
Sincerely,
MSA, CONSULTING ENGINEERS
:Z!:~
TJM:pd
Attachment
216-2709.jul
.
.
.
.
.
CHANGE ORDER
( Instructions on reverse side) No. 1
PROJECT, Elk Park Center DATE OF ISSUANCE, August 1, 1994
OWNER: City of Elk River
(Name, 13065 Orono Parkway
Address) Elk River, MN 55330 OWNER's Project No. 210-'-16-30
CONTRACTOR, Forest Lake Contracting ENGINEER, MSA. Consulting Engineers
14777 Lake Drive 1326 Energy Park Drive
Forest Lake, MN 55025 St. Paul, MN 55108-5202
CONTRACT FOR, School St. . Jackson, &
Freeport Avenues ENGINEER I S Project No. 230-216 :W
You are directed to make the following changes in the Contract Documents.
Description: See Attachment
.
Purpose of Change Order: See Attachment
Attachments: (List documents supporting change)
CHANGE IN CONTRACT PRICE, CHANGE IN CONTRACT TIME,
Original Contract Price Original Contract Time
$ 1.673 J:l73.71 150 navs
days or date
Previous Change Orders No.--=..=.- to No.....=..:.- Net change from previous Change Orders
$ - 0 - - 0 -
days
Contract Price prior to this Change Order Contract Time Prior to this Change Order
$ 1. 673.873.71 150 davs
days or date
Net Increase (Beereas6.) of this Change Order Net Increase (Beerea.B :.J of this Change Order
$ 39.244.85 10 davs
days
Contract Price with all approved Change Orders Contract Time with all approved Change Orders
$ ] 713.118 56 160 ciav~
days or date
RECOMMENDED: APPROVED, APPROVED, ~
By by by <'U/
MSA, Consulting Engineers City of Elk River Contractor
EJCDC No. 1910-8-B (1983
Edition)
db:co# 1.230.216
.
FILE: 230-216-30
CHANGE ORDER NO. 1
SUPPLEMENTAL INFORMATION
DESCRIPTION:
This Change Order to the Forest Lake Contracting Contract for the construction of School
Street, Jackson and Freeport Avenues. Involves adding work associated with a construction
of a Park & Ride area on the old City Hall site located at the intersection of TH 10 and Main
Street. The construction involves concrete curb and gutter, gravel base, bituminous
surfacing, removal of miscellaneous concrete and bituminous, and grading of the site. In
addition, this change order also deals with the salvaging and installing of six new hydrants
on School Street. The original intent of the specifications was to salvage the existing
hydrants, and to provide them to the municipal utilities and have the Contractor install new
equipment. It is obvious from the Contractor's bid that his interpretation was to remove and
reinstall the existing equipment. Therefore, he has requested additional compensation in the
amount of the cost of the new equipment to be installed.
The following three areas breakdown the components of this change order:
. L Construction of the Park & Ride facility.
Item Unit Total
N.o... Item llnit .Ql}' .erice .erice
I Concrete curb and gutter, B612 LF 1,076 $ 7.75 $ 8,339.00
2 Concrete sidewalk SF 575 2.50 1,437.50
3 Pedestrian ramps EA 2 125.00 250.00
4 Aggregate TON 561 6.00 3,366.00
5 Bi tuminous base TON 230 23.00 5,290.00
6 Bituminous wear TON 128 32.00 4,096.00
7 Tack coat GAL 93 2.00 186,00
8 Pavement mark, 4" solid white line LF 456 0.85 387.60
9 Blue handicap symbol EA 3 35,00 105,00
10 Rip-rap Class 3 CY 4 60,00 240.00
11 Man-hole adjustment LS 1 500.00 500_00
12 Silt fence LF 40 2.00 80.00
13 Sodding SY 485 2.00 970.00
14 Remove bituminous pavement SY 267 1.75 467.25
15 Sawcut bituminous pavement LF 30 1.75 52.50
16 Remove concrete curb and gutter LF 40 1.50 MOO
. ESTIMATED TOTAL COST $25,826.85
.
.
3.
.
2,
Site grading at the Park & Ride facility is difficult to estimate on a unit basis.
Therefore, it is proposed to accomplish this work on a time and material basis. The
Contractor is obligated to import material from the School Street project as part of
that project's cost, however, he should be compensated for the time and equipment
needed to place the material for purposes of construction of the Park & Ride.
Following is a list of equipment and hourly rates. It is anticipated that the total cost
of this grading will fall in the range of $3,000 to $5,000.
EQUIPMENT RATES FOR GRADING WORK (OPERATED RATES)
Foreman w/pickup
Tandem dump truck
D3 dozer
D6 dozer
Bobcat .
Cat 950 loader
Cat 140 blade
Cat 613 scraper
Smooth drum roller
Turf tractor
Low boy tractor-trailer
$58.00/hr.
50,OO/hr.
70.00/hr.
78.00/hr.
42.00/hr.
80,00/hr.
78.00/hr.
80.00/hr.
75.00/hr.
42.00/hr.
95. OO/hr.
Cost of material for each of the six hydrant installations on School Street is