Loading...
5.3. SR 08-01-1994 ~! ~"-( ( II fII< River ITEM 5.3. MEMORANDUM TO: MAYOR & CITY COUNCIL FROM: PHIL HALS, STREET/PARK SUPT. DATE: JULY 29,1994 SUBJECT: EDA SITE On July 28, 1994, Chris Leeseberg displayed his models of the EDA site for the downtown business group. There was a good deal of discussion regarding the different designs, the possibility of the park being returned to a building site, and the future of a riverwalk behind the business district. Rob VanValkenberg suggested that the heating/cooling water from the Cinema building artesian well be utilized for some type of flowing fountain or waterfall within the project. The business group voted unanimously to support Proposal C, with the large patio area at street level and the grass amphitheater, and a future . consideration for a concrete amphitheater if usage demands it. At this time, I have not received the cost estimates from the structural engineer for foundation support for the Cinema building, but I will bring the entire cost estimate to the City Council as soon as I receive the engineer's information. . P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425