Loading...
5.2. SR 08-29-1994 r I ~'\( ( i! !Ii{ River ITEM 5.2. MEMORANDUM TO: MAYOR AND CITY COUNCIL STEVEN B. ACH, CITY PLANNER~ AUGUST 29, 1994 SUBJECT: UPDATE ON PROPOSED MODIFICATIONS TO DEVELOPMENT PLAN, ELK PARK CENTER PUD FROM: DATE: ISSUE Consider development plan for Elk Park Center PUD ATTACHMENTS . Letter from Kraus-Anderson Inc., Revised Development Plan, Previously Approved Development Plans OVERVIEW Last week, Kraus-Anderson was informed that Target would not longer be pursuing a "super store" concept at Elk Park Center. Target has gone back to their original proposal of a 90,000 square foot store, which is consistent with the development plan originally approved by the City Council. Given this turn of events, Kraus-Anderson has submitted a development plan which is identical to the original plan approved by the City Council with the following exceptions: . Driveway onto Jackson Road would remain within the power line easement, which is the location as approved on the development plan for the super target concept. . An easement along the north side of Target would need to be vacated and reestablished within the power line easement. . . Target's lot line needs to be adjusted approximately fifty (50) feet for a distance of three hundred (300) feet to correspond with the adjustment of retail space. P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 CC, Elk Park Center August 29, 1994 Page 2 . The development plans submitted by Kraus-Anderson do not contain any new elements the City Council have not seen in the past. However, one element that has continued to change with each new development plan is the total square footage has been reduced as follows: . Original Development Plan (12/20/93) . Super Target Dev. Plan (7/5/94) . Current Development Plan (8/29/94) 369,903 Square Feet 337,900 Square Feet 311,393 Square Feet SUMMARY The new development plan is in keeping with the spirit and intent of the previous plans approved by the City Council. The City Council did allow staff the ability to make minor adjustments to the development plan without coming before the City Council. However, the most current plan includes elements of both plans approved by the Council and staff wanted to present this to the Council to ensure a blending of the two development plans is acceptable. . Several utility improvements have been installed at Elk Park Center and Target is preparing to receive a building permit within the next week. Kraus-Anderson is requesting the new development plan be accepted by the City Council and allow the project to continue on schedule. RECOMMENDATION It is recommended the City Council approve the submitted development plan which is within the spirit and intent of previous plans approved for Elk Park Center PUD. On the other hand, if the Council feels this is a significant change, staff should be directed to proceed with a formal amendment which requires a public hearing before the Planning Commission and City Council. . epc.council AUG 25 '94 11'31AM KRAUS ANDERSON P.2/3 ELK PARK CENTER LIMITED PARTNERSHIP . August 25, 1994 Mayor Hank Duitsman and City Council Members City of Elk River Elk River, MN 55330 Re: Elk River Shopping Center Dear Mayor Duitsman and Members of the city Council: It is my understanding the City planner will bring before you at your next Council meeting our revised site plan for our Elk Park Shopping Center. My purpose for writing you at this time is to let you know of the many difficulties and frustrations we have experienced in this development project and to ask for your patience and cooperation. . We have changed our site plan back to what essentially was our originally approved site plan with the minor exception of the southerly access to Jackson Road. This access road to the rear of our center was moved approximately 400 feet to the north. It was approved on our site plan when we submitted a revised plan for a Target superstore. As you probably are aware at this time, for reasons we can only specula te upon, Target has decided to cancel their plans for a 162,000 sq. ft. superstore and has reverted back to their original plan to construct a 90,000 sq. ft. Target store. With changes of this type, a developer really has no choice but to accept the change. If a supermarket operator decides to locate elsewhere, a developer has little choice but to find alternative users or adopt a workable plan which addresses these problems. We and Target would like to start constructing the Target store as well as buildings "5" and "e" and the site improvement work from our south property line through our Jackson Road access drive as soon as possible. It is my understanding that the original Target store which we will now be building has been submitted to the building inspection department for plan review. It is our intention to start that portion as soon as the plan review has been completed and approved and a building permit issued. We have been contacted by two major supermarket operators who have expressed a high degree of interest in having a store on the northerly portion of our land. I would expect we could finalize this part of our development and begin building within the next 60 . 523 South Eighth Street. M.inneapolis, MN 55404 . 612/332-1241 . Fax 6121332-8940 . . . AUG 25 '94 11'31AM KRAUS ANDERSON P.3/3 ELK PARK CENTER LIMITED PARTNERSHIP Mayor Hank Duitsman Page Two August 25, 1994 days. Our goal is to have a simultaneous opening of both elements of the center in July of 1995, which is a date Target has set for its opening, I ask your cooperation in accepting these necessary changes which have taken place in this shopping center development. These changes are not of our choosing and have been very costly to us. We want to finally begin construction of buildings as soon as possible as we have experienced what happens on a project when it is not started on a timely basis. If there is any doubt in the mind of any city official whether this project is worthwhile, I can only say that besides the millions of dollars in taxes the project will bring in, we have also invested $2.6 million in public improvements. By developing our property, we have also made it possible for other property owners in the area to develop their commercial property. without our paying for utilities and Freeport Avenue, these utilities would not be available for the other commercial property in the area. In consideration of these other commercial developments, I would ask the city council to afford them the same fine cooperation you have extended to us; and conversely that they not be assessed to any greater extent that we were for utilities and other city services. I thank each the plan you construction development. of you for your receive will be and hopefully patience reviewed achieve and understanding and hope favorably and we can begin a July opening of our Sincerely, ELK PARK CENTER LIMITED PARTNERSHIP By Kraus-Anderson of Elk River, Inc. Burton F. Dahlberg President BFD/mmm cc: Steve Ach, city Planner Patrick Klaers, city Administrator 523 South Eighth Street. Minneapolis, MN S5404 . 612/332-1241 . Fax 612/332-8940 [ID =::::::: ~ === ,i" ~ ~ ~~] .~ : ~!i ~'iii~~ P t~~ii ...",;;:'$-0: lif ~;~~~ ,,~ ~~~~~ [Hjg; I :ih!~ : mill I~ - ~ ;~~~ i' ~<8 \ \ - ! 1 \ \ \ J ,.- Cl en r ~? ~i ~ !; ~ ;~ ~ ~. ~ i~~ ~~ O~~~;~~ I: ~~;l~~! :5 d ~ 6' ~ ".., ;----~ , ' I ' ! ) / / J \ \ \ \ I \ t I I I I -----~ --------~ I I z ~'1 ~! ~~ r~ I' lil:jl! ~ . cz::::: ~ I III f;!; === ,:I 11,' .'" == Mid III Ill.; 111m j~ ~~'" ] . I- i v~ 8' , ) \ - .r_' ~. I I i I . I , " - 1 . '1 I~i d~\ I \ ~ \i \ .+h-----j I ~,ilfi I I ,- I i , \ '1.1OEMM "lo.W rg ij3lN30 )(ijYd )113 :S~'1~ I": Jd Iin ~ T-: T"'- <( ---'-, i '- ~ '" , . ! !I , 'I g . . ~ il l- ll! ~i i ,'.- '-. ~I~ ~r "'1'/ I ili.l= un 11 ! ~ ' . J ~ i Ii! Ii . iiii L . ~ ~ ~:i:i n:i:i:i:i , . nH~!p!H I . j! I ~ I · !! l' / dl/!/i!;h ~ :i;:i: ifi j i i ~ i ! ~ 9 ~::-:;- ~:;-::-::-::-::::::: .. Ii :i :i :i :i :i :i ~' ~. :i :i :i .. :i :i :i :i :i:i :i:i:i:i:i:i:i:i:i:i:i:i n!n!H!!!!!!!!!J H~!g~Un~ i lillillljjjllllll lmmnn i ..iV~~~UV~1~~~~~f~~.~W~~~W~11~W::l! ~ J:; ~ ~ :; ~,i ~ ~ " ,; ~ ; , , , ~ ~ : I. 2 ~ :; I . . ;: i " ~ : ~1;1'ljIJI'lil ""l'" ' ~m~DI nOSl""'" 'VJ^'V ~1J ~]lN):} )/lj'fd )(13 ;;"on, 1 N'fld 3115 () J..l. iEI :r: ", 'X \ 1.1.1 ", ~ .M m , 0 C\/ , C\/ ,.... ....I t) Z :J 0 Z () \ <l; >- \ ....I f- a. t) f- >- Z W CO :2: Cl a. w 0 > ....I 0 W a: > a. w a. Cl <l; nn in 1 , , ~ ~ :;: .:: 1l " , x '" w "' 0 0 " z 0 'or ~ .., Z 9!lSSS ~ " ! "001 , w ~ ! !!iL. , , z .., , , w "- 0 , , , , :i ~ :i :i :i , , , ! ill !!!! I ~ ! ; ...... I 0 . , "" ~ ~ ; . ;~~~..:~~ ~ ~ 1 ~ ~ i i 9 ~ ~ S ! ! ! 0 , ~ . a - --. " . "" . , ~ ~ ! , t- i ,; ,. ., a~ ~~ .0 'I ~2 z i~' ~~ in"': -, ,.. " . II ~ ~~ ), ~~ 3" ;<1 ~ ~~ ~~ 2 ~~ i~ ~~ ~:; ~.;l:'lt:: ~! ~~~.. ~ jl-,!i; d a.. " " " " . & ~ . " " ~~ fa~ ~ I" ::i ...: ;'1 j': ...: ...: ...: :i ::i ::i:i ~."" :i :i:i:i:i ii~i~iii~ ~3~~_!.. ~..,~~,i ~ !!~_!.. ' .. :0 - - - . ~ ~ <> ~ ~ ~jj~Si~~ ~ i"" I 'ill ~ ' ~ t 5 . 'i~ ~ ~ ~':l~1~~~1~~ , ~ ~ l .. " ~~~;: i~ ~ ,H " 1 ~~!~~..dao:i 2 .0 . 0, 0 : ~I : ,;0 ;? .:: ~ i1: a:;ij Ii! 5 ~ ~ i ~ ~ : :: ~ ~ 2 . ~ ~ ~ .;l c: : ~ "",..."".,.... ,.".,."""'-"""'...,,,--,....:. \ . C- \ \ '01 \ \ \ \ , \. \ \ \ \ \ '. '" ., '\ LAZA 1 2 ELK F ARK CENTER SCHOOL STREET u.s. HIGHWAY NO. 169 TO . GATES A VENUE 4 . MS, oom.mc mImJS ~, ;I .', \ '':'' - .. \ \. -~ "\.. v''. 8,0 \ \.... \ \ \ ~ ~b{lJ=[]n~Oii" ~(Q) I I OUTLOT A: I I I I I I BARR . . . EQUITY. MANAGEMENT, INC. August 29. 1994 Mayor Duitsman & City Council Members Ladies & Gentlemen: An issue demands your immediate attention. The issue is last week's construction project that reduced the outbound (west bound) traffic lanes at the intersection of 169 and Elk Hills Drive from 3 lanes to 2 lanes! This ill advised action was taken at a time when traffic volume at that intersection is increasing daily. We either outright or through partnerships pay well over $100,000 a year in taxes in Elk River. It is unacceptable to us that the safety and convenience of the many customers to our businesses that access Dodge Avenue via the 169 and Elk Hills Drive intersection be so adversely affected. Also, the many home owners and other residents on the east side of 169 have been adversely affected by this ill advised reconstruc- tion of this intersection. We urge you to insist that city staff immediately undertake the rather simple project of adding a third west bound lane on the east side of this intersection. This additional lane should be a right hand turn lane. The additional lane also serves to provide better alignment of Elk Hills Drive with .the just constructed School Street access to 169. Enclosed is a picture taken at that intersection that clearly points out that a serious alignment issue now exists. . Thank you for your attention and support to correct this serious safety and access issue. Sincerely, Russ and Linda Norha 650 DODGE AVENUE, ELK RIVER, MN 55330 (612)441-8833 . / ,J . 1 I I