Loading...
5.3. SR 09-19-1994 Iff{ . . ITEM 5.3 MEMORANDUM River TO: MAYOR AND CITY COUNCIL STEPHEN ROHLF, BUILDING AND ZONING ADMINISTRATOR SEPTEMBER 14, 1994 51( SUBJECT: UPDATE ON THE STATUS OF THE 221ST AVENUE PROJECT FROM: DATE: City Attorney Peter Beck, is preparing the easement documents necessary to complete a new alignment of 221st Avenue. Mr. Beck is also preparing a 10 foot utility easement, requested by the Elk River Municipal Utilities, to put in a new 3 phase power line. Staff is hopeful that we will have these easements executed so that the 221st Avenue project can be advertised for bids this week or next. Mr. Beck is also preparing agreements for Class V to be donated by adjacent property owners. Originally, Midwest Asphalt indicated that they would give 2,000 tons of Class V. Barton Sand and Gravel said they would match this offer. Midwest may renege on their offer, but Barton Sand and Gravel has generously offered to supply the entire 4,000 tons, if necessary. Staff will also need to get this resolved prior to bids being advertised. Staff anticipates this project being completed this year. However, we are going through the Wetland Conservation Act process because the new alignment of 221st Avenue necessitates filling part of a wetland. If the wetland process is appealed by someone, or some agency, it could delay finishing the project until next year. Weather could also delay the completion ofthis project. As indicated in the attached memo from Terry Maurer, City Engineer, the project will be designed so that the existing roadway may stay in use until spring of 1995. After the project is complete, the old alignment of 221st Avenue would be vacated to the adjacent property owners. In summary, Staff feels this project should be started this year. Barring issues out of the City's control, we are hopeful it will also be finished in 1994. 221st-srfbz P.O. Box 490 . 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 MS September 15, 1994 File: 230-165-70 CONSULTING ENGINEERS eVil ENG,lNEER,'NG: fNl/IRO.r..,'ivlENTA( fliUNICf.DAl PlANNiNG STRUCTURAL .SUWEYj'NG TRAFFIC TRA"\iS,DQRTATlON Mr. Steve Rohlf Building & Zoning Administrator City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: 22lST PROJECT STATUS UPDATE Dear Mr. Rohlf: As your aware, the resolution of the wetland issue relative to 221st Street improvements is well underway. The local governmental unit has met to discuss that, and the permit application is in. As I understand from you, that permit could be issued as early as late October. Anticipating that, we have proceeded to advertise the plans and specifications for bids. The estimated bid date is October 12, 1994. As you are also aware, City Attorney Peter Beck has received the legal descriptions for the necessary easements, and is in the process of preparing the easement documents. Assuming those can be signed within the next few weeks, we would anticipate a contractor could start the work at the east end, staying away from the wetland until the permit is actually authorized. Given reasonable fall weather, it is realistic to believe that the work would all be completed by winter of 1994. We have set up the plans and specifications such that, in the event that the wetland mitigation permit is held up, or weather prohibits the completion of the project, the existing roadway would stay in use until spring of 1995, when the project would then be completed. Please let me know if you have any questions, or need additional information regarding this project. Sincerely, 1326EnergyParkDrive MSA, CONSULTING ENGINEERS SI. Paul, MN 55108 612-644-4389 Fax: 612-644-9446 . 9800 Shelard Parkway Minneapolis, MN 55441 612-546-0432 Fax: 612-544-6398 Terry J. TJM:pd !65.!409_..p SEP-16-94 FRI 10:06 MSA ST PAUL P.02 --.---.._----- MSA L_._.__,_~ September 16 1994 CONSIL1'1\I: r\lIImti File: 230-212-53 . .~,'~-ij tNGjNHfJf'>/lj FNVI~ONMtNIA{ vtiJNJO~A, PW>JN/N( .S!I?UCll1RAI .<'iI~;J(YINC . !RMfK ;'W~SP()~;Ar:I)"-, 1326 Energy Park Dri.. St. Po~, MN 55108 612.644-4389 Fox: 612-644-9446 . 9800 Shelord Mway M;nneapolis, MN 55441 612.546-0432 Fox: 612.54406398 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: CONCORD STREET EASEMENT STATUS Dear Council Members: There were a total of IS easement documents sent to individual property owners on the Concord Street project. Two property owners received two easement documents each. There was also one individual who has a large parcel of property which only touches Concord with a corner. It is questionable whether an easement is actually needed from this individual. As of yesterday, only six easement documents have been signed and returned to the City. Yesterday, I met with Grace Ostien regarding the status of these easements. Grace reviewed the file with me and recorded the names of the individuals who have not submitted their easements as of yesterday. She indicated she would contact each of these individually to determine the status. This morning I received a call from Sally Palmer, one of the individuals who has previously submitted her easement. She asked if she could receive her easement back. She was somewhat afraid that not all individuals would give their easements and hers would be recorded without any road improvement being made. I directed her to Sandy Thackeray, and told her she could either get the easement back or discuss the issue with Sandy, because I believe the City will not record the easements unless the project is to move forward. At this point in time, staff is in a holding pattern waiting to see what happens with the remainder of the easements. If you have any questions regarding this issue or the status of the project, I will be in attendance at Monday evening's City Council meeting. Sincerely, MSA, CONSULTING ENGINEERS ~j~~ TJM:lw 2!1-I603...p r I ~\.) ( ); Iff{ MEMORANDUM TO: MAYOR & CITY COUNCIL FROM: PHIL HALS, STREET/PARK SUPT. DATE: SEPTEMBER 15, 1994 SUBJECT: UPDATE ON EDISON STREET; RESIDENTS REQUEST FOR RESURFACING In late July, the City reviewed an informal petition from the residents of Edison Street, Fillmore Street, and 153rd and 154th Avenues requesting a street improvement. I prepared a preliminary cost estimate for the Council on a two inch thick bituminous overlay and Class 5 shoulders. On September 22, 1994, Terry Maurer and I will host an informal meeting for the residents and give them the following information: . 1. 2. 3. 4. Such projects, in the past, have been assessed. Assessments will be in the $1,500.00 range. This project would be done in 1995. A public hearing would be held by the City Council prior to the project or assessments. I will report the results of the informational meeting back to the Council in about two weeks. . P.O. Box 490 . 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 SEP-16-94 FRI 10:09 MSA ST PAUL P.03 . MS _,,<I.. 1994 m'sfijiri.~G K'lilj~I}:JlS File: 230-240-70 Mr. Pat K1aers City Administrator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 CIVIl ~NGINHRri>JG fNViiONMfNTA. MUNI(IPAi V~ANNIN(; .:r~()(r(JIJA/ '<!}~VFYI~(, ;?/,/fl( ~I'" r~$~ )k;',A r!j~.' 1326 Energy Park Drive SI. Paul, MN 551 OS 612-644-4389 Fax0612-6~4-9~~6 . 9800 Sholard Parkwoy Minneap~i" MN 55~41 612.546-0432 Fox: 612'5~~-6398 RE: GATES AVENUE I mIRD STREET INTERSECTION Dear Mr. Klaers: As you are aware, Councilmember Holmgren has previously suggested that the City investigate cul-de-sacing Third Street east of Gates Avenue to at least temporarily improve the safety of the intersection. With the increase of traffic, the offset nature of Third Street as it meets Gates Avenue has become more of a concern. The City Council directed me to investigate the opinions of the various people that would be affected by such a closure. In doing so, I contacted Police Chief Tom Zerwas, Carol Mills (Executive Director of Guardian Angels), and Cliff Skogsted, Fire Department member. All three individuals were opposed to any closure of Third Street east of Gates A venue. Both Chief Zerwas and Cliff Skogsted indicated that emergency vehicles utilize this route in accessing both the Guardian 'Angels facilities and the apartments located on Third and Evans. Both felt that during peak traffic times, to route emergency vehicles along Main Street to access Evans Avenue would add significantly to the response time and possibly add a more dangerous route for the emergency vehicle. Carol Mills was very opposed to the closure of Third Street because it provides an access for elderly drivers to Main Street. Carol felt that it was just as dangerous, if not more so, for an elderly driver to try to access Main Street via Evans Avenue. All three of the individuals I contacted strongly suggested that the City pursue the realignment of Third Street at Gates Avenue. As you are aware, this would require the acquisition of a small amount of property on the north side of Third Street and would include the removal of a large diameter tree. At this point, I have not pursued with the property owner the potential of acquiring the amount of land nece~sary for the realignment. Please let me know if you would like me to pursue this issue further. Sincerely, MSA,CONSULTINGENGINEERS T~~~ TJM:tW:249-160J5...,