5.6. SR 09-19-1994 I ~\.( ( II IXil River . . **CONSENT ITEM 5.6.** MEMORANDUM TO: MAYOR & CITY COUNCIL FROM: LORI JOHNSON, FINANCE DIRECTOR DATE: SEPTEMBER 13, 1994 SUBJECT: PAY ESTIMATES PAY ESTIMATE #4 - LIBRARY EXPANSION PROJECT Kue Contractors, Inc., has submitted Pay Estimate #4 for work completed on the Library expansion. The Pay Estimate is in the amount of $100,559.00. The City is holding retainage of $14,902.00 on this project. PAY ESTIMATE #4 EXPANSION WASTEWATER TREATMENT PLANT The second attachment is a copy of Pay Estimate #4 to Gridor Construction, Inc., in the amount of $125,208.00. Gridor has pledged securities to the City of Elk River to cover the maximum amount of retainage possible on this project. Therefore, no retainage is being held. PAY ESTIMATE #3 - ELK PARK CENTER STREET IMPROVEMENTS The third attachment is a copy of Pay Estimate #3 in the amount of $333,410.73 payable to Forest Lake Contracting, Inc., for work completed on the street and turn lane improvements related to the Elk Park Center improvement project. The City is holding retainage of $83,693.69 on this project. Also related to this project is Change Order #2 which incorporates minor signal modifications requested by the Minnesota Department of Transportation at a cost of approximately $5,400. All of the Change Order costs will be fundable through MSA and turnback funds. PAY ESTIMATE #3 - ELK PARK CENTER TRUNK IMPROVEMENTS ArCon Construction, Inc., has submitted Pay Estimate #3 in the amount of $185,191.48 for trunk sewer and water main improvements completed as part of the Elk Park Center project. The City is holding retainage of $38,296.85 on this project. P.O. Box 490. 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 Pay Estimates September 13 ,1994 Page 2 , FINAL PAY ESTIMATE - 1993 NORTHEAST AREA IMPROVEMENTS The Final Pay Estimate for the 1993 Northeast Area improvements has been submitted by Richard Knutson, Inc., in the amount of $2,200. This brings the total contract paid to $159,852.87 which is slightly less than the contract amount of $163,065.20. Richard Knutson, Inc., has submitted all of the appropriate paper work in order for the Final Pay Estimate to be approved. FINAL PAY ESTIMATE IMPROVEMENTS DEERFIELD III STORM SEWER Attached is a Final Pay Estimate in the amount of $1,909.70 payable to W.B. Miller, Inc., for the completion of the Deerfield III storm sewer improvements. The contract was in the amount of $138,944.00 with a final construction cost of $138,048.71 which is slightly less than the contract amount. The contractor has submitted all of the necessary paper work in order for this project to be finaled. . FINAL PAY ESTIMATE - MEADOWVALE HEIGHTS UTILITY IMPROVEMENTS The last attachment is a Final Pay Estimate in the amount of $1,000 payable to Richard Knutson, Inc., for work completed on the Meadowvale Heights utility improvement project. The final project cost was $463,459.63 which is up very slightly from the contract amount of $463,103.70. Again, this contractor has completed all of the necessary paper work in order for this project to be finaled. STAFF RECOMMENDATION Rick Wessling of Eos Architecture has reviewed the Pay Estimate to Kue Contractors, Inc., inspected the work, and recommends payment. The remainder of the Pay Estimates have been reviewed by MSA Consulting Engineers. MSA recommends payment to each of the contractors as noted above. In addition, MSA Consulting Engineers recommends that Change Order #2 to Forest Lake Contracting, Inc., be approved in order to facilitate the necessary signal modifications. . . c o '" c .9 ti 2 :;; e- N o f'. " t-< Z ~ :2 ;:J u o Cl -< <: .!z w :lE ~ a.: a: o u. w ~ () - u. - l- e:: W () C Z <( Z o - ~ .~ ..J lJ. Q. <( "' w <) if. '" 9 f-o::2 c ~ u .9'" t:: ~ ;~~i- .o~~8 .~ 0 -< u i5D!i1lDDD ~ o w Z o w <) if. U "0 .~ ~ ~ v > u . "'1"'1 0\0 "',..-1 ..-I'" ":MO"I 0, Zco ., z Vl o .. 0 _gz I;;: !-o uOu -0'" i;o 0..",,,, -< 0.. 0.. >. >< ., >< .a ..... 0 HQ)M ::lM vall'l ..... Q)lI'I rl > .a..:Z ::l ::;: "" >< o . ><-1-1>< Q) V Q) > 0 > ..... ><..... ~""~ ..1<:""..1<: rl..-lrl ~...~ 1'-' u '" 0' '" 0.. >.0 "1"'1 ><il'M Q)..I<:lI'I >><lI'I ..... ., ~""z ::;: ..I<: 0 rl a . ~ 0 >< >< Q) ....0> o ..... U'l~ >.1.0 -1-10..1<: .,..jM,....f Url~ '" '" z ~ o ::2 ... 0\ , N rl , 'J} '" I;;: o !-o ~ f-o Z o U ..-I 1"'1 1"'1 Q) U'l EJ-I-IU'l ~~~ -1-1 U) - ..... 4 '<:><0 V Q)..... ~~~ :;:: QJ Ul V ~;;j&j G '" f-o s: U '" -< -< :;: . V a H.jJ - $:i:l l'l b:;: ~ o U) lI'I .jJ .jJ V g:5~ e 40 -1-1 ..jJ1.O ... c: a rl Ul 8 81.O'~ l~g:tl ='...., ;';rl:;:: '" g u -< '" f-o Z o u :>: o '" ... ~"E~~~ '-::: U .... 0.."0 .= C.$'O :> . E c. ~o:g~g "3Ut'\l"O", - C 0.. v._ 2:: I\) c ~ c g~~.~'~ ~~.o~v Yl.J::: v o.c o ..... ~ ~ c tJE.ccg gE~I\).c c: >. c:: E <Il c~=>-.... uc::...OI"OlC .... Eo.. v "g..9t'\1'-E ..::: c::::..s ~ 0,2 o:>;l VJ 0.. v; ~ ~ 8 c: ~.~..c: [1 u 0) 0.. ....R5 :: .c: o..~ t:: ~ ..... < c:: OJ u ~:2E~~ t'\I....:l ::I.... -5.sg,9" r; -0 Q () ~ ~ ~ t: C5......h E~~.c~ v 8 c'~ i:t s-t:8~0 ~gu~] t:?..c:.E- c:u....~E oJ:..c:~o U~,::.f;J '"' 'OIU~~'- U:..:::: -0 ~~ ~.E ~ '~-o;w'o .g~"E@~ c c: 8 ~ 11:I ::I ,g U c E 1: C"l ro; 0 \,I f-o E.5 u E rl ., ~ c: & ti ~ " o I-u Z.s W.o :H ~ .~ a.;ti " a:2 08 11. c:-ci .- " Z ~--a 0.911 -~ ~ ~ c: ,~ <tU ~...; .cR ::::i :0 a.. C"l c a.. -' " .A 5 E ..... E e :0-0 (f) 1i 0 t; "" .... < c( 0:.2:( c: 0".... f-o UI- -g ~ t5 E;;:j (J <(,~ c:; ...J a: c.g :2 1-.9;; a Z;;;:: - v. 0: O'6.g 0 u~8 ~ o ... !-o U -< '" f-o Z o U l:w"- ,. '" w~>s: ...JU)I-- I~ 5~5ct wioi :;)'0.... ~s.2'(/) d. cisz.n .... > ~crJ' a:>~ ..:a:.... ::;: ~(/) :f' 0J ~ ~ ~ ~ 5, ",. ~ "F:: t ~! c o !d'i:j :g 'E 0.. E :0-0 . U ;J ~ :0- Z :>: v ;; o . V a H v .8 v~ ~ 0 9 ~ "0 '" c E~l:5 0...., U) " ... Q) ::E .. '0 N U} '0 v .0 >,'_ v: C v :s ~ "' o .0 V U ~ E o o . ..... 0\ co co 1"'1 ... ~ ~ .. :;: ::> C/) w N !c( o ~ ~ 0 ~ w 2. cc ~ C/) '" o- w::;' f-or-- Wl:> ..Jc ~o Ol:> U c ..J ~ ~.2 08 1-- -H ~ '" " i5 W ~ 8, 0 ; ~ .c U :;: '" ::> .c en 8, t; c ..: .. 0: .c f-o " Z ;; 0 z U N l'l"', '<l" "'" .. -" g - " ?::::::' '': ~ r ~ ~:..::; v,... ~c ~~ () + '00 W~<r. ~1e E Z2 - c ;5 U W - a: <i .. .. o .c~ '''0 r-- +CJ :;;:..-., ..... "? ~ l;::' 0 ~f::v- o(,JCc:: r./),..:iE ~o 0 \,I'=: ... 00 0 1*H~ 8- ,Q -"~ .n ~ .. I- Z W :iE ~ a.. a: o u. W !cc U iL I- a: W U (f) l3 W I- J: U a: <t C"l il.! V '"' , ;; -5 -S 2 ~","\ "0,- . v vo'O~ -5~~c "'0 u V 0 c..c:,ou C"l t.I C V ~ -5 ';;; oS ,9 0 ~ "0 """'-oc ~ " & C"l. v -5 V ::s B '"' Ot c: o g 0 v v ~ '- E ..... ~ 0. =' ';;;0 <I) ~ evECl o..c:..:.:: .... c:: .... '- v 09&r:ci -0 lI".I? .... t:.l vo~c:::- Ir.l t.:::..c: 0 (.L. .B'E':u~ . ~ II.) v Q::; ~v==-5t:.l 5v~-5:: E Q,) "0 ,- r ::l'~ ,... ~ Z v-6RQ,):J o'-cvo Q < ,2;;::E C~E"2< :::: - c 0 Q,) cc-o~-e 02"2 C"l "- u....,._ c:: 0 v C .'-.... c -5;=: ~.~ 5 w -5 8:'2~ E u: '-('l~o>-i= t3':'~o~8..a: ~-5C::llJo w C 00":':: -5.... (J -a.s-:'o"E 10- .... <I') u _ z 8 .~.~ ~'E :J u,......:::;;: c: 0 :o;! <;: :..; C": tJ :E oS 8.< g.,~ < o 0 o 0 . U'l 0\ ..... U'l lI'I U'l N 0 co 0 ..-l ..-I .. .. .. W Cl ..: z ~ W o:~ en';: mo WF ..J", o v W c Z:J 0:", ~2 ..J'" ;:; ~ o .~ 1-:::. f-o Z W :;: ~ Q. 0: o LL C/) W ""'. <s- Uo; ~ ;_~ w f-o.- ::> 0:" 0 W ~ 10- (J\.) Z (/J C W :J':: ::E o c.. ~ ;; E Q. W ~ l- e: J:i Z a..,.... w cn~ c: en c 0: w.- ::I' ...J =::. (J '"' t- co 0'\ ~.8 :~ ':$ .::~ ~ ~ ~ -2.'S ~ ~ ~ ~ "'- ~.g " - Si ~ ~ g ~ -"'> ~ ~ .9 - - - ~ ~ ~ o ~ ~.~ " ~ ~ \)0 ::"'.. ~~ "'S ~ ~ '_ 0 ~" ~~""" v 'ti C: ;: 00 U-" o .~ -= ~ " - . :0-" C E 'd o u ~ _E" .J::. >- 0 ~8..u " c..'C ,~ ~,~ -5 ;; 0 ~ u Cl Lt.l c:; 1:1 ti:: is c i= e-::l f5 ~ 9 UCll~ I-"Ot: z c ~ ~ " 0 O"U :>:". EO . rjo ~ v g-S O"'~ ~..!!:l 0 c: C ~ ...., ._ .c 0000 c: t";: .~..c >. ~ '0 ~ " " ~E9 'E ~ ~ ~....:o 0" V'- g K Vl Z 0 f:: u ~ 0 '" 0 Vl Z 0 f:: Ci 0 -< Vl ~ ...J U '" '2 >- is 0 '" u " ~ ~ -< c ;9 :>: "0 ~ " i! :>: 0 ~ ~o :>: [j Vl 0:0- "' .~ ~. '" 0. ~ .0 '" 0."' ,,-= Vl 0 "0 '" '" ~ c " l:> " 0 , 0 oo~ 0 Z c c c.. -< '" ~ '" :r: l:> u ~ Q. Z 0 " u -< - .:; " f-o :r: II ~ ~ '" u F: c.. z W Cl ..: :i!:.. ;5 W 0: Cl z is 3 U z :i en zG' ii:u o .~ f-o- w::l u.!! z"" ..: u ~ .:: Ill:::' N .,; en ~ en 0 ~ ~ N " 0 0 ;;, .... Cl ~ ~ m '" 1: ~ E ~ 0 0 " ~ ~ .t: ;. "" ~ "'15 ~~ 0 0 0 ~'" :0- '" z~ E ~ '" .....fti '" ~i' " 6; f ~ w~ 0 '" xii .c 0 u15 ~ ~> .c ~. (; 0;; ~ ~l 3' f--" '" j;;ii ~ 0> ze c ;;;. '" .t: 611 0 ". 1;; :q ,s '" <- ~ ~1: ~ f-'" '" "C '" . it '" NO " ;;;u ~ @u) :~ .::1 5 '" ~ ~!! '" -. <15 .,; . ;; ~ ~2' .~ E~ " ~i ~ :5 ;;;.., ;;, -0. C ~'* .2 'S ~c: '" ,,8 u ~:e '" ~~ ~ ~ .. '" 0" '" ~z .t: ::.:z .t: 5'" u -~ :E ~ ;. ~ . " wN ~ ue- E N Q~ ~ ~~ 0 0 " ~N '" -0 <1 ~cj ;; ~z c - ~ :~ ~~ ..-:~ 5 . z ~ N - R~ m ~ "" '" f-" ~ z. " ~~ :; ~z 0 O;",j .t: '" 0", ~ Cz ,.w ~ :;~ z 110 I 'JI~ .. U -' GRIDOR CONSTR., INC. 1886 BERKSHIRE LANE . P.O. BOX 41246 PLYMOUTH, MN 55441 612-559-3734 OWner CITY OF ELK RIVER Date 9/6/94 For Period 8/1/94 to 9/6/94 Request No. 4 Engineer MAlER STEWART & ASSOC. REQUEST FOR PAYMENT Wastewater Treatment Plant Expansion SUMMARY: I ORIGrnALCONrnACTAMOmrr $ 918,500.00 . 2 CHANGE ORDER-ADDITION $ 3 CHANGE ORDER - DEDUCTION $ 4 REVISED CONTRACT AMOmrr $ 918,500.00 5 VALUE COMPLETED TO DATE $ 273,900.00 . 6 MATERIAL STORED $ 96,005.00 7 AMOmrr EARNED TIllS PERIOD $ 369,905.00 8 LESS RET AINAGE - 10% $ 0.00 9 SUB-TOTAL $ 369,905.00 10 LESS AMOmrr PREVIOUSLY PAID $ 244,697.00 II AMOUNT DUE THIS REQUEST $ 125,208.00 Reconunended for Approval by: MAIER STEWART & ASSOCIATES, INe. ~~~ q?.z/9P' Eil Chang ~ Date Approved by Contractor: Approved by Owner: G~~INe. City of Elk River 9/6/94 . Robert Meyer Date Specified Contract Completion Date: Date EQUAL OPPORTUNITY EMPLOYER . '-. PARTIAL PAYMENT ESTIMATE NO. 3 FROM: AUGUST 6, 1994 TO, SEPTEMBER B, 1994 CONTRACTOR, FOREST LAKE CONTRACTING. INC. ADDRESS' "777 LAKE DRIVE, FOREST LAKE. MN 55025 OWNER: CITY OF ELK RIVER, MINNESOTA PROJECT, ELK PARK CENTER STREET IMPROVEMENTS (230-216-30) COMPLETION DATE ORIGINAL: NOVEMBER 1.. 19.. REVISED: . DESCRIP1l0N SCHEDULE 1.0 SCHOOL STREET (SAP.204-107-04)-TOTAL SCHEOULE 2.0 JACKSON AVENUE (SAP.204-'04-l>I)-TOTAL SCHEDULE 3.0 FREEPORT/191STREET-TOTAL SCHEDULE '.0 FREEPORT AVENUE (SAP. 204-12...,2)- TOTAL SCHEDULE 5.0 TH. 169 RIGHT IN RIGHT OUT (SAP. 204-010-02)-TOTAL SCHEDULE 6.0 LEFT TURN LANE T.H. 169 (SAP. 2<W-Ol0-02)-TOTAL SCHEOULE 7.0 T.H. 10 TURN LANE (SAP. 204-010-03)- TOTAL SCHEOULE 8.0 CHANGE ORDER NO.1-TOTAL SCHEDULE 9.0 CHANGE ORDER NO. 2- TOTAL AMOUNT OF CONTRACT, ORIGINAL $ REVISED $ 1,673,873.71 TOTAL THIS PERIOD TOTAL TO DATE 213,598.36 36,810.30 80,994.65 8,450.00 6.476.30 14,101.95 0.00 9,927.50 0.00 483,741.07 56,436.46 251.187.67 8,450.00 9,364.30 18,705.55 0.00 9,927.50 0.00 . 230216-3.wk4 . 230.216.30 3 I ! ! j 3 . ~ 3 .. .. t . e ; . .. . __._ il . ; _._-~- =: I i' 5EP 14 '94 U:B4 FLC, INC. 4644722 CE14NGB ~ IrDstruct10Ds on revers~ $idel Nil. 2 . l'l\OJECT, :z~::c ~ark: cente:: D.l'4'l!l or :I~: S41S>tClRber 1, 1994 . ~R: m;ome , Add:...,.) City of Elk River 1306~ O~ono parkway Ei~ a1ver, ~ 55330 ~arest Lake contracting 14777 Lake Drive For.."t !'o'k", MN 55112S ~GINUlt.: Ml!A.. Co=ultinQ' !ngi~6..r" 1326 Bl\~Y ParI< Ilriva st. pau1, XN $:109 ENGIN3ta'. Pro act No. 23ll-216-30 VWNZR'. project ~o. 130w21'-30 C<>>lTAACTOl\ : =;u>.C:'1' FOR: School Stre"t, JacUolt , ''''''''Port Av..nu.... Tou are directed ~" ~ke th~ fo'low1ng changes 1= the eontra",t Documents. Oe$cl'ipti<>n: 'rhe 0...Dge Order il\vo1ves 1Ilin<>,r !Il041f1eations to \:ha tour signal syste= 01'1 the preject. Purpose of change Order: roodificat.,i..."" to t.h<I tour project. bid. i'he C;,anqe Order was a re..ult at :r;~......"d..d llIinor l>1gnal sy..~ received fro", ~r ::ftc the ~t. of 'the Attachments: (List dOCumeAt& supporting changej CI!J'~Ge :IN CONTAAC'l' PRICE. original C~tract Price C!al\NlE Iii o:lilTll."DlI TIME: . $-- 1,613,gn.71 original CDnerac~ ~i=e 1~o:l .:L1YS aj.a:..saa Pr<lviou$ Chang. orders No.--1.. to ND.--L., S 39}244.S~ Net C~9. ~~ ~~&~1ou. Chang_ Crd&r~ 10 de .. . Cnnerace ~r1c. prior eo this Change Order Contr"ct '1'1_ P,rio;c to tll". CI\&n9" Or<14% ".. 1, '713, 118 ..'~ l~ dil " - N&t Incraa.. of this ChAnge O~er Net Incr....". of t~11' Chal1.;1_ orde% s__ 5,401.00 ..,.. -0- Contr..ct P~1~. ~th all ..ppr~ved Chang. or.:lar. Contract ~~ with 111 approved Change Orders s_ ---b.718,519.5li loS') d~ .... ., APPROVED: ME-RVVZD: 5yL4,~~ . !o:C$t ~ t . ~ln;J ~ lily Qty of tllt bver EJCDC Ro. 1910-8-. . CQU-UO.21& :Z::12l-"" ! ~ g ; : 2 ; ! j. i ~ I - - 'i ii ! . ~ i 5 . . . I Ii . 'nu~ ~s ~sw a~:~l Q3H ~6-~J-~~~ . . . 230215-3.WK4 PARTIAL PAYMENT ESTIMATE NO.3 FROM: JULY 7,1994 TO, SEPTEMBER 8, 1994 CONTRACTOR, ARCON CONSTRUCTION, INC. ADDRESS' 903 E. FOREST, MORA, MN 55051 OWNER: CITY OF ELK RIVER, MINNESOTA PROJECT: TRUNK SANITARY' WATER. ELK PARK CENTER (230-215-30) COMPLETION DATE ORIGINAL: REVISED: AMOUNT OF CONTRACT, ORIGINAL $ REVlSED $ 510,897.71 765,936.95 DESCRIPTION TOTAL THIS PERIOD TOTAL TO DATE SCHEDULE 1.0 STREET CONSTRUCTION - TOTAL SCHEDULE 2.0 WATERMAlN - TOTAL SCHEDULE 3.0 SANITARY SEWER - TOTAL SCHEDULE 4.0 CASING PIPE INCREASE (CO #1)- TOTAL SCHEDULE 5.0 HillSIDE CROSSING SANITARY (CO #2) SCHEDULE 6.0 HilLSIDE CROSSING WATER (CO #2) SCHEDULE 7.0 HillSIDE CROSSING STORM (CO #2) 25,933.97 73,349.46 (5,810.02) 13,386.75 26,875.46 11,623.96 52,401.88 36,333.97 218,882,37 241,288.67 13,368.75 28,875.48 11,623.00 52,401.86 230~215~30 .' FINAL PAYMENT ESTIMATE NO. 4 (FINAL) FROM, JULY 18. 1994 TO: SEPTEMBER 8. 1994 CONTRACTOR, RICHARD KNUTSON, INC. AODRESS: 12585 RHODE ISLAND AVENUE S., SAVAGE, MN 55378 OWNER, CITY OF ELK RIVER PROJECT: 1993 NORTHEAST AREA UTILITY IMPROVEMENTS (230.190-30) COMPLETION DATE ORIGINAL: REVISED: AMOUNT OF CONTRACT: ORIGINAL $ REViSED $ 163,065,20 DESCRIPTION TOTAL THIS PERIOD TOTAL TO DATE SCHEDULE 1.0 SITE GRADING-TOTAL SCHEDULE 2.0 SANITARY SEWER-TOTAL SCHEDULE 3.0 WATER MAIN-TOTAL ADDITIONAL WORK-TOTAL 1,200.00 0,00 0.00 0.00 19.322_90 54,457.22 84,402,75 1,570.00 . . 230190-4.wk4 230-190-30 . . . FINAL PAYMENT ESTIMATE NO. I (FINAL) FROM: AUGUST 3. 1994 TO: SEPTEMBER 8. 1994 CONTRACTOR: W.B. MILlER, INC. ADDRESS: 16765 NlITRlA stREET. RAMSEY, MN 55303 OWNER: CITY OF B.K RIVER. MINNESOTA PROJECT: DEERFIEUlIII STORM SEWER IMPROVEMENTS (23O-1~ COMPLETION DATE ORIGINAL: REVISED: AMOUNf OF CONTRACT: ORIGINAL S REVISED S . . DESCRlPllON SCHEDULE 1.0. SrTEWORK-TOTAL SCHEDULE 2.CJ....STREET CONSTl'lucnON- TOTAL SCHEDUlE 3.0 STORM DRAINAGE-TOTAL SCHEDULE 4.0 WATER MAlNISANITARY SEWER-TOTAL SCHEDULE 5.0 STORM DRAINAGE AODmONAl-TOTAL SCHEDULE 8.0 EX'lRA \NORK- TOTAL TOTAL lliIS PERIOD 207.50 193.20 0.00 0.00 0.00 0.00 TOTAL TO DATE 5.353.50 31.312.36 78,595.2.5 _.00 20,813.00 3.090.80 TOTAL BID 400.70 ti~illlil!i~'f-;lil SI38.048.71 !:;!~}tjt~fuflMIl~ilf~it1fu%. SO.OO ~!~~lllit1~t}i~11il;jm~ir~m~i~~!J~~[fl$1 S69.420.83 ~;[tJitm:[*tf:llli!f,igJli~~~:iIf~l!!t%llimf&~ S89.42O.63 d!m~I~m~lHffE:0~~~liE~~1~!~TD:{~It.ili~;r 122.307.00 138.944.00 138.048.71', . . . FINAL PAYMENT ESTIMATE NO. 6 (FINAL) FROM: JULY 20,1994 TO, SEPTEMBER 8, 1994 CONTRACTOR: RICHARD KNUTSON, INC. ADDRESS: 12585 RHODE ISLAND AVENUE S.. SAVAGE, MN 55378 OWNER, CITY OF ELK RIVER, MINNESOTA PROJECT, MEADOWVALE HEIGHTS TRUNK UTILITY IMPROVEMENTS (230.171.30) COMPLETION DATE ORIGINAL, DECEMBER 8,1993 REVISED, AMOUNT OF CONTRACT: ORIGINAL $ REVISED $ 463,103.70 DESCRIPTION TOTAL THIS PERIOD TOTAL TO CJATF SCHEDULE 1.0 SANITARY SEWER-tOTAL SCHEDULE 2.0 WATER MAIN-TOTAL SCHEDULE 3.0 SITE WORK & STREET IMPROVEMENTS-TOTAL TOTAL OF EXTRA WORK 0.00 0.00 0,00 0.00 257,025.90 171.244.23 33,942.00 1,247.50