4.4. SR 09-26-1994
I ~~(
( II
Ifi( River
.
.
ITEM 4.4
MEMORANDUM
TO:
MAYOR & CITY COUNCIL
FROM:
PAT KLAERS, CITY ADMINISTR..j\T~R
1)(
SEPTEMBER 23, 1994 \, l'
DATE:
SUBJECT: WWTPEVALUATION
Attached for your review is a report from the Minnesota Pollution Control
Agency (MPCA) regarding the annual evaluation and planning survey for the
Elk River Wastewater Treatment Plant. Superintendent Darrell Mack will
be in attendance at the Council meeting to discuss this report.
A couple of areas of concern are noted in Section 1 and 2 of the report. These
areas are being addressed by the Treatment Plant upgrade that is currently
under construction. Representatives of MPCA are aware that this upgrade is
taking place and totally understand the situation in Elk River. Overall we
believe the report to be accurate and fairly favorable.
It is appropriate for the City Council to formally accept this report after a
presentation and discussion.
P.O. Box 490. 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425
SEP 2 D 1994
.
Minnesota Pollution Control Agency
September 19, 1994
To Vhom It May Concern:
RE: 1993 Annual Evaluation and Planning Survey
Thank you for participating in the 1994 Annual Evaluation and Planning Survey
process. Ve have completed our review of your survey and enclosed is a report
based on your responses and a copy of the survey form for reference. In
addition, for all cities which discharge to a surface water, a summary of some
of your daily monitoring report data for the last year is also enclosed.
.
Ve recommend you discuss this report at an upcoming municipal council/board
meeting. In some cases, items identified in the report may require immediate
attention. At the least, it should help your focus your planning efforts to
meet future needs. After the meeting, the mayor should certify that the city
council has discussed the report, and submit this certification to the MPCA.
possible, this should be done within 30 days of your receipt of the report.
>*
If
Ve believe the AEPS will prove useful for both the municipalities and the MPCA.
The individualized report can be used as a planning tool for your municipality's
wastewater treatment system. If you need assistance in implementing suggestions
from the report, we suggest you contact the Agency or your consulting engineer.
Ve are in the process of combining data from all participants into several
statewide reports. This process should be completed within the next 60 days.
If you wish to receive a copy of the statewide summaries, please contact us
after that time.
Ve hope the report information will prove useful in planning for the future of
wastewater treatment in your municipality. If you need any assistance or have
any questions regarding the AEPS process, please feel free to contact me at
(612)296-8766 or 1-800-657-3864.
Sincerely,
.
D.u,~ ,~l-~~
Deb Lindlief
Operations/Training Unit.
Municipal Section
Vater Quality Division
DL:jmg
Enclosures
520 Lafayette Rd. N.; 51. Paul, MN 55155-4194; (612) 296-6300 (voice); (612) 282-5332 (TTY)
Regional Offices: Duluth' Brainerd' Detroit Lakes' Marshall' Rochester
Equal Opportunity Employer. Printed on recycled paper containing at leasl1O% fibers from paper recycled by consumers.
.
.
.
:>:>:> MUNICIPALITY: ELK RIVER
This reJ?Ort contains responses to questions you answered in the Annual
Evaluatwn and Planning Survey. Although you answered all the applicable
questions in the survey, not every answer recieved a response in this report.
We provided a response only when an answer indicated that there is an issue
which needs resolution.
MPCA staff have assigned a point value to the various questions in this survey,
with the exception of questions in Section 8, Future Needs. Points are given to
responses that indicate that there rray be a problem to be addressed. Each
section is worth 100 points. If your system received a score greater than 50 in
any section, you should carefully review the reJ?Ort responses for this section
to detemdne if your system is operating effect~vely and efficiently. We hope
this report proves useful both in planning for future wastewater needs and in
resolving current problems. If you need assistance in inplerrenting any of the
suggestions in this report or have questions concerning the report or survey
process, please feel free to contact the Operations/Training Unit of the MPCA at
1-800-657-3864.
:>:>:> SEcrION ONE: SYSTEM LOADINGS AND PERFORMANCE (from your I:MR's)
Based on the monthly D.M.R. data you have sutmitted over the last calendar year,
the following conclusions can be drawn:
Last year, you exceeded your effluent BOD limits at least once. This is a
pemdt violation. You should investigate the causes of the exceedence, create a
plan to rranage the loading problem and infonn the Agency of your plan as soon as
possible.
You exceeded 90% of your effluent BOD limits at least once in the last year.
Although this is not a permit violation, it indicates your system is reaching
the limits of its capacity to treat wastewater adequately. This rray soon lead
to nonccnpliance. You should investigate your BOD loading and create a plan to
rranage it.
Last year, you exceeded 90% of rour effluent solids limits at least once.
Although this is not a pemdt =olation, it indicates your system is reaching
the limits of its capacity to treat wastewater adequately. This rray soon lead
to nonccnpliance. You should investigate your solids loading and create a plan
to rranage it.
Score for SEcrION 1: 70, WHERE 0 IS BEST AND 100 IS TIlE MAXIMUM. If your score
is greater than 50, carefully review the survey you filled out and our report
responses for this section to detemdne if your system is operating efficiently.
:>:>:> SEcrION 'TWO: TREA'IMENT SYSTEM PHYSICAL mNDITION
Your responses to the questions 12, 14, 17, 18, and/or 24 demonstrate your
awareness that rrajor repairs or replacement are needed in the next five years.
As you are aware, this requires a great deal of planning, including funding,
construction, permit modifications, and choosing of a consultant.
Score for SEcrION 2: 100, WHERE 0 IS BEST AND 100 IS TIlE MAXIMUM. If your score
is greater than 50, carefully review the survey you filled out and our report
responses for this section to detemdne if your system is operating efficiently.
>>:> SEcrION THREE: mLLECITON SYSTEM
Question 28. Review the influent flows into your treatment system to detemdne
.
if infiltration and inflow are a problem and establish a plan for correcting any
problem identified.
Score for SECIION 3: 8, WHERE 0 IS BEST AND 100 IS THE MAXIMUM. If your score
is greater than 50, carefully review the survey you filled out and our rel?ort
responses for this section to determine if your system is operating effic~ently.
:>:>:> SECITON FOUR: SLUIx:;E
Question 36. Your system needs six months sludge storage capacity in tanks,
pits, or lagoons. This will ensure adequate capacity during the winter (when
sludge cannot be land applied) and sumner (when crops are present). Please
contact Jorja DuFresne at 1-800-657-3864 to determine storage requirements for
your system.
Question 50. Your responses to this question demonstrate your awareness that
rrajor repairs or replacement are needed in the next five years. As you know,
this requires a great deal of planning, including funding, construction, pemdt
modifications, and choosing of a consultant.
Score for SECIION 4: 10, WHERE 0 IS BEST AND 100 IS THE M1\XIMllM. If your score
is greater than 50, carefully review the survey you filled out and our reJ?ort
responses for this section to determine if your system is operating effic~ently.
:>:>> SECITON FIVE: SEPITlGE
.
Score for SECIION 5: 0, WHERE 0 IS BEST AND 100 IS THE MAXIMUM. If your score
is greater than 50, carefully review the survey you filled out and our report
responses for this section to determine if your system is operating efficiently.
:>:>:> SECITON SIX: TREATMENT SYSTEM OPERATION AND MAINI'ENANCE
Score for SECTION 6: 0, WHERE 0 IS BEST AND 100 IS THE MAXIMUM. If your score
is greater than 50, carefully review the survey you filled out and our rel?ort
responses for this section to determine if your system is operating effic~ently.
:>:>:> SECITON SEVEN: FINANCIAL AND ORDINANCE STATUS
.
The area of sewer service charge systems and sewer use ordinances is carplex and
confusing. Municipalities which received funding fran the federal or state
construction grants program or the State Revolving Fund (loan program) face
certain requirements in the area of ordinances. We have sample ordinances and
charge systems which you can use to create your own docurrents. If you have
questions concerning ordinances, charge systems, rate setting, or whether you
ITn.1st meet the reguirements of specific funding programs, please contact the MPCA
Operations/Tra~g Unit at 1-800-657-3864.
Question 80.5. Your sewer use ordinance should require annual notification of
cost to all users. Users should be notified annually regarding what is
encrnpassed in the user charge.
Question 81. Pretreatment agreerrents/permits with each significant industrial
user should be established wherever a wastewater treatrnent system serves
significant industrial users. Significant industrial users have: 1) flows to
the system in excess of 25,000 gallons per day or more than five percent of the
total flow received at the system; 2) loadings to the system in excess of five
percent of the design BOD capacity; or 3) the potential, in the opinion of the
pemdttee or the MPCA, to adversely impact the system. These users are usually
.
.
.
identified during the MPCA pemdtting process. Pretreatment agreements usually
contain limits for the industrial users.
Question 82.1. Since you have individual sewage treatment systems (such as
on-site septic tanks), your sewer use ordance should deal with such systems. As
one aspect of mmicipal wastewater treatment, you should require inspection and
maintenance plans for such systems.
Question 82.4. When new hares are constructed in your service area, you should
consider what is the optirral approach to treating the resulting wastewater. Any
new construction should be consistent with your municipality's long-range
developlleI1t plans.
Score for SECTION 7: 37, WHERE 0 IS BEST AND 100 IS THE ~IMUM. If your score
is greater than 50, carefully review the survey you filled out and our reJ?ort
responses for this section to detemdne if your system is operating effic~ently.
>:>:> SECTION EIGHT': FUTURE NEEDS
Question 89. Connection of currently unsewered horres to your treatment system
will add flows and loadings ,to your treatment system. If your system does not
have capacity for these additional flows and loadings, an expansion will be
necessary. In addition, a sewer extension rray be needed.
.
pemdttee: ELK RIVER
Pemdt No: MN0020788
1993 SUMMARY DATA
1-Sep-1994
Influent
Parameter Type
# of Times
Reported
# :> 90%- # :>
of Design Design
FLOW Ave. Quantity
12
o 0
Effluent Months of # > 90% # :> # Not
ParClIlEter Type Discharges of Limits Limits Reported
--------- ------------- ---------- --------- ------ --------
Pipe # 1 TSS Ave. Concentr 12 0 0 0
TSS Max. Concentr 12 1 0 0
TSS Ave. Loading 12 0 0 0
TSS Max. Loading 12 0 0 0
CBOD Ave. Concentr 12 6 5 0
CBOD Max. Concentr 12 6 4 0
CBOD Ave. Loading 12 1 1 0
CBOD Max. Loading 12 2 1 0
.
.