Loading...
6.1. SR 09-26-1994 MS CONSULTING I:NGlNEERS eNiI ENGINEERING: ENViRONMENTAL !v1UNICIPAt PlANNING STRUCTURAl . SUWEYING HAFFIC T,W','SPORTATlON 1326 Energy Pork Drive Sf. Paul, MN 55108 612-644-4389 Fox: 612-644-9446 . 9800 Shelord Parkway Minneapolis, MN 55441 612-546-0432 Fox: 612-544-6398 ITEM 6.1. September 23, 1994 File: 230-223-30 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: WESTERN AREA STORM SEWER Dear Council Members: Last Tuesday, September 20, I held a follow-up meeting with the developers of Mississippi Oaks and Heritage Landing regarding the various issues raised recently about the Western Area storm sewer. Those in attendance were Richard Kincannon, Dennis Chuba, Gordy and Erv Moldenhauer, and Ron Black representing the Moldenhauers. The meeting lasted approximately an hour and a half, and was held at Elk River City Hall. During the meeting, I explained the items outlined in my memo dated September 19, 1994, that I had presented to the City Council the previous evening. Those in attendance seemed only slightly interested in the issues relative to the size and depth of the trunk storm sewer in Orono Parkway. They were, however, quite interested in the issue of the small portion of Country Crossings First Addition which drains southerly through Mississippi Oaks to the Mississippi River. They questioned why they were not made aware during the development of Mississippi Oaks and Heritage Landing that additional areas north of County Road 30 would be included in the storm sewer flow in the future. It was their understanding that they paid 100% for that pipe and actually helped the City out by allowing a small portion of Fresno to be connected into it. We explained to them that 22 % (approximately 25 acres) of the tributary area for that trunk storm sewer line in Mississippi Oaks had been calculated for the area north of County Road 30 and that that portion of the cost had been funded by the City. They referenced to the feasibility studies for Mississippi Oaks and Heritage Landing which do not clearly spell out that the area north of County Road 30 also included a portion of the Country Crossings area. The point that caused the most contention was the method of financing the trunk storm sewer. After we explained that the City had paid the fair share for the area north of County Road 30 with the idea of collecting it in the future when that area develops, their concern turned toward the change in storm sewer financing policy. As you are aware, the Mississippi Oaks and Heritage Landing developments were assessed 100% of their pro rata share for the 2301223.2301.sep . Honorable Mayor and City Council September 23, 1994 Page Two trunk storm sewer. With the change in policy to a storm sewer impact fee, Country Crossings will be charged $100 per lot for their share of the cost to connect into these trunk lines. This results in a significant difference between the amounts of monies paid for trunk storm sewer on each development. We tried to explain that neither Mississippi Oaks nor Heritage Landing are at a competitive disadvantage because there have been other changes in policy which adversely affect Country Crossings. These would include the assessment of $30 per foot for Orono Parkway which is outside the plat boundary, and 100% of the cost of street and storm sewer for Joplin between County Road 30 and Orono Parkway. I attempted to go through an analysis of the cost for each plat divided by the number of lots as presented in my letter of Septemb~_. I believe that the participants at the meeting understood what the outcome of that would be and were not interested in hearing that entire analysis. . At the close of the meeting, I agreed to prepare a letter for Ron Black on Mississippi Oaks and for Denny Chuba on Heritage Landing that would spell out the construction costs for each of their developments versus Country Crossings. This, of course, will not be able to factor in the cost of the land nor the time value of the money they needed to borrow to do their developments. It will, however, give them an "apples to apples" comparison of the construction costs each development is paying for utilities and streets. These comparisons will be put together and mailed to the parties early next week. At the close of the meeting, I specifically asked those in attendance if my perception that all issues were resolved with the exception of the method of fmancing storm sewer. They all agreed that that was true. Their major concern, once again, was their feeling that they were being treated unfairly in having paid 100% assessment for storm sewer while Country Crossings would benefit from the change in policy and only pay a storm sewer impact fee. I suggested to them that they could submit a letter to the City questioning this policy, and it could then be brought forward to the City Council for their consideration. At this point in the meeting, Pat Klaers,City Administrator, had stepped into the room. I believe that he and I made it clear that even though they could make a request to the City Council for consideration, staffs position would likely be to recommend against a retroactive interpretation of the storm sewer policy. If you have any questions or comments regarding this information, please give me a call. Sincerely, . MSA, CONSULTING ENGINEERS ~}l~/ Terry T.Maurer, P.E. TJM:tw 2301223.2301.sep