6.2. SR 09-26-1994
SEP 1 B 1994
.MS,~
OONSULTlNG Er/GINEERS
eNii ENGINEERiNG
E.r.;'VIRQNlvlENTAl
/vIUNIClPAl
PlANNING
STRUCTURAl
.SURVEYiNG
HAFFi'C
TRANSPORTATION
9800 Shelard Parkway
Minneapolisl MN 55441
612-546-0432
Fax:612-544-6398
.1326 Energy Park Drive
St Paul, MN 55108
612-644-4389
Fax: 612-644-9446
ITEM 6.2.
MEMO
TO:
PAT KLAERS, ADMINISTRATOR
ELK RIVER, MINNESOTA
CC: TERRY MAURER, MSA, CONSULTING ENGINEERS
GEORGE STUEMPFIG, P.E. 6M<?
FROM:
DATE:
SEPTEMBER 15, 1994
RE:
ELK RIVER CORRIDOR STUDY
This memo is intended to serve as a progress report on the T.H. 1O/T.H. 169 corridor
study being conducted jointly by MnDOT and the City of Elk River. Thus far MnDOT
has completed forecasts for the year 2015 on the Trunk Highways. MSA has completed
forecasts for local and county roads at their points of intersection with the Trunk
Highways. MnDOT is currently gathering turning movement count data at several of the
more critical intersections.
Following the data gathering, MnDOT will conduct level of service analysis for existing
and forecast conditions, and develop future corridor concepts. Base mapping and concept
layouts will be done by MSA. As this process continues, technical memoranda will be
prepared, which will ultimately be compiled into a [mal report after the public
involvement phase is completed.
If you have any questions about what has been accomplished to date or the direction the
corridor study is headed, please call me at 546-0432.
2301239-1401.sep