Loading...
6.2. SR 09-26-1994 SEP 1 B 1994 .MS,~ OONSULTlNG Er/GINEERS eNii ENGINEERiNG E.r.;'VIRQNlvlENTAl /vIUNIClPAl PlANNING STRUCTURAl .SURVEYiNG HAFFi'C TRANSPORTATION 9800 Shelard Parkway Minneapolisl MN 55441 612-546-0432 Fax:612-544-6398 .1326 Energy Park Drive St Paul, MN 55108 612-644-4389 Fax: 612-644-9446 ITEM 6.2. MEMO TO: PAT KLAERS, ADMINISTRATOR ELK RIVER, MINNESOTA CC: TERRY MAURER, MSA, CONSULTING ENGINEERS GEORGE STUEMPFIG, P.E. 6M<? FROM: DATE: SEPTEMBER 15, 1994 RE: ELK RIVER CORRIDOR STUDY This memo is intended to serve as a progress report on the T.H. 1O/T.H. 169 corridor study being conducted jointly by MnDOT and the City of Elk River. Thus far MnDOT has completed forecasts for the year 2015 on the Trunk Highways. MSA has completed forecasts for local and county roads at their points of intersection with the Trunk Highways. MnDOT is currently gathering turning movement count data at several of the more critical intersections. Following the data gathering, MnDOT will conduct level of service analysis for existing and forecast conditions, and develop future corridor concepts. Base mapping and concept layouts will be done by MSA. As this process continues, technical memoranda will be prepared, which will ultimately be compiled into a [mal report after the public involvement phase is completed. If you have any questions about what has been accomplished to date or the direction the corridor study is headed, please call me at 546-0432. 2301239-1401.sep