Loading...
INFORMATION #2 09-26-1994 MS co~snmG ENGINEW CIVil ENGINEERING ENVIRONMENTAl /v1UNIClPAl PlANNING STRUCTURAl . SURVEYING TRAfFIC TRANSPORTATION 1326 Energy Park Drive · 51. Paul, MN 55108 612-644-4389 fax: 612.644-9446 .9800 5helard Parkway Minneapolis, MN 55441 612.546.0432 fax: 612.544.6398 SEP I 6 /99; INFORMATION September 14, 1994 File: 230-223-20 ((;'(Ql'%j)? -'1"\ .R ~",.....It" V,,,,r . \I \...:r ./.~\" e.""" Mr. Dave Granlund !" ~ 220 Morton Street Elk River, MN 55330 1"'7 RE: ORONO PARKWA Y/JOPLlN AVENUE IMPROVEMENTS Dear Mr. Granlund: Thank you for taking the time to meet with me last evening regarding the street improvements and their effect on the Sherburne County Fairgrounds property. As you requested, I have enclosed with this letter plan sheets from the Western Area Phase II improvement projects which show the reconstruction of Orono Parkway along the south border of the fairgrounds and Joplin Avenue along the west border of the fairgrounds. I have also enclosed the cross-sections for these two segments of roadway. Based upon our discussion last evening, we will make provisions for the following items in our improvement project: . A 48-foot wide driveway opening on Orono Parkway immediately across from the Hudson Street access to Country Crossings 1st Addition. Two similar sized accesses to Joplin Avenue. The plans will indicate one toward the northern portion of the fairgrounds and one toward the southern portion of the fairgrounds. These two openings will be located exactly in the field during construction. The fence surrounding the 1.3 acres of property purchased by the City will be removed and salvaged sometime this fall. We will attempt to coordinate the grading and staking of the northerly boundary of the 1.3 acre parcel so that you may facilitate the reinstallation of the fence yet this calendar year. We will extend a 24-inch diameter concrete pipe with a catchbasin at the approximate location of the gate in the fence heading toward the horse corral area. This is the area that we walked through and discussed drainage last evening. We will also work with you as needed to do minor grading and/or minor filling in this location to get runoff to the point that the catchbasin is located. The actual location of the catchbasin can be set in the field during construction. . . 223-1407..... . . . _.:_.....'A'." . Mr. Dave Granlund September 14, 1994 Page Two I understand from our discussion last night that you may also request the County to act on the storm sewer pipe to drain the parking area adjacent to the ballfields; At this point, this is not part of the improvement project but certainly could be added by change order if requested by Sherburne County. Once again, thanks for your time to review these items with me. We look forward to working with you during the construction of these improvements. Sincerely, MSA, CONSULTING ENGINEERS 5fJ1/~ Terry J. Maurer, P.E. TJM:tw cc: MP.Pat KJaers., €By" Jiilldliv<< Me. David Loch, Sherburne County 223-1407.....