Loading...
5.3. SR 06-11-2007 ITEM # 5.3 MEMORANDUM TO: Mayor & City Council FROM: Lori Johnson, City Administrator DATE: June 11, 2007 SUBJECT: Budget Discussions We will start very general budger discussions on Monday with the public works departments, including streers, snow plowing, equipment services, engineering, and building maintenance. These budget worksessions with department heads and division managers are an opportunity for them to explain their staff and capital outlay requests and to present their 2008 goals to the Council. It is also an opportunity for the Council to ask questions, give staff their goals and program requests for the upcoming year, and to discuss other items of interest with each department head. We will not be discussing each department's budget in detail; budget detail will follow in August and September after the Council's preliminary comments are incorporated. First, we will be discussing the public works budgets, focusing mainly on staff additions, capital outlay, and program changes. Phil Hals, Street Superintendent, has several items he wants to discuss including policy changes for snowplowing and mailbox replacement. We also want to formalize a sidewalk and trail maintenance policy addressing the sidewalks and trails that the city will plow and the ones that are the responsibility of the adjacent property owner. Second, I would like some input from the Council on your target tax rate for 2008. For the past several years, the Council's goal has been to keep the tax rate constant; that goal has been met and the tax rate even dropped slightly for taxes payable 2007. We've seen increases in net tax capacity from 12-15 percent over the last few years that have allowed the city to increase the tax levy without increasing the tax rate. Obviously, the amount of new development, particularly housing, has slowed considerably and the value of existing property is not rising as quickly as in the past; therefore, we do not expect the net tax capacity to increase as much this year as in the past. In fact, the increase may be substantially less. The net tax capacity for taxes payable 2008 is based on the property value as of January 1,2007, which includes new construction started or completed in 2006. That, plus the addition of the YMCA debt, will affect the tax rate which ultimately determines how much tax revenue is available for other non-debt funds including the library and general funds. Before putting together projected budget numbers for presentation to the Council, I'd like to get a feel from the Council on where your target tax rate falls for 2008. Finally, here is a brief overview of the budget timeline that I will discuss in more detail at the meeting. The proposed budget and maximum levy need to be approved by the City Council for certification to the County by September 15. We are cunently compiling all the budgets that have been submitted by the division managers and department heads. One of the last pieces of information that we wait for before fmalizing the tax levy is the estimated net tax capacity; we typically receive it around the beginning of September from the County Assessor. We anticipate that schedule to be the same this year and would look for final approval of the maximum tax levy from the Council on September 10. The Council will have had an opportunity to review the entire budget prior to that time. Again at the July and August worksessions, department heads will be present to present in general their staff additions, capital outla.y, goals, and program changes. With the Council's input from these worksessions, we will put together a budget for presentation in detail later in August that will align the goals the department heads have developed and programmed into their respective budgets with the Council's goals. 2 REQUEST FOR ACTION To Ma or & Ci Council Agenda Section Consent Item Description Public Works Expansion and Associated Issues Meeting Date une 11, 2007 Item Number 5.3.A. Prepared by Phil Hals, Street Su erintendent Reviewed by Reviewed by Action Reauested Request to proceed with the purchase of two temporary office trailers. One for the Park Foreman's office and Park Department meeting room and one for the Street Superintendent and Assistant Street Superintendent's office. Backaround/Discussion In 2006, the City Council approved hiring Oertel Architects to provide a public works site master plan and to determine if the present location for the Street and Park Department will still be able to function efficiently in 20 or 30 years. The conclusion was that this site will work, but would not function as efficiently as a newly designed facility on an open piece of property. The price tag for Phase I was estimated at 6.5 million dollars. Using typical finance methods, Staff feels that it will be several years before construction could begin. Once started, construction will take about 12 months to complete. In the mean time, we need to address some pressing needs for the Street and Park Department. The most critical need is for offices and a meeting area for the Park Maintenance Department. Staff recommends the purchase of two temporary office trailers. One trailer to be used as the park maintenance office and meeting room, and the second trailer as offices for the Street Superintendent and Assistant Street Superintendent. Financiallmoact In 2006, the City Council approved spending up to $25,000 for temporary offices for the Street and Park Department. Attachments None Action Motion by_ Second by _ Vote Follow Up C:\Documents and Settings\ljohnson.ELKRIVERPD\Local Settings\ Temporary Internet Files\OLK45\6-6-07 Me memo Public Works Expansion.doc ITEM 5.3.A. MEMORANDUM TO: Mayor and City Council FROM: Phil Hals, Street Superintendent DATE: June 6, 2007 SUBJECT: Information on Sherburne County Funding of Composting Activities In March, the Sherburne County Municipal Recycling Board (Cities of Becker, Big Lake, Elk River and Zimmerman) applied for a SCORE grant of $50,000 through the Sherburne County Solid Waste Conunittee to fund the out of pocket expenses involved with grinding brush, composting leaves and grass clippings. The SCORE Conunittee recommends $48,000 for 2007 and a reduction to $40,000 in 2008. The volunteer conunittee feels that the money is better spent for educational opportunities. What this means for Elk River and the other three cities is that we will need to fund a portion of the grinding costs, as well as the labor and equipment costs that we now bear. It is the intention of the SCORE Conunittee to reduce funding by 15% each year until the cities are totally funding their own programs, therefore we must explore other funding options. One option is to charge a dumping fee and that would include installing control gates, a card access system and a video surveillance system at each compost facility. A small fee could be attached to a card system for residents and a more appropriate fee for conttactors that use this facility. The fees would help offset the reduction in grant funding. This type of controlled access could be impacted by the street garage building expansion at our compost drop site Another option would be for Sherburne County to fund the composting operations, since it is such a popular program through out the county. To offset the reduction in SCORE grant funding, the Street Department budget for 2008 contains a request for $2,000. 6-6-07 M&C county funding on composting.doc REQUEST FOR ACTION To Ma or & Ci Council Agenda Section Worksession Item Description Discussion on Snow Plowing Policy Meeting Date une 11, 2007 Item Number 5.3.A. Prepared by Phil Hats, Street Su erintendent Reviewed by Reviewed by Action Reauested Staff requests direction for revisions to the snow plowing policy. Backaround/Dlscussion After the heavy snowfall last February and March, it became apparent that we need to make some adjustments to our snow plowing policy. Since the explanation for some these items is rather lengthy, I will list the issues in the memo and plan to do the explanations during the discussion time at Monday's council meeting. I will then incorporate the Council's comments into a revised snow plowing policy that will then be presented for the City Council to adopt at a future workshop meeting. The issues for discussion are as follows: Mailboxes . Set standards for new developments and reconstruction projects regarding mailbox specifications and installations · Discuss criteria for mailbox repair . Establish a repair or reimbursement policy Cul-de-sacs . Discuss plowing concerns · Changes in plowing procedure . Center islands for snow storage Sidewalks · Define which sidewalks are plowed with City equipment and establish a policy to deal with future sidewalks · Define which streets, where sidewalks abut the back of curb will have snow hauled away and when. Miscellaneous · How to deal with residents that plow their snow across City streets Financiallmoact Attachments None Action Motion by _ Second by _ Vote_ Follow Up ~~ g-Si n n . - ~. . o x i~ :I:~ o n 3 " n 0 . , (DO;;: . - ~n Obl ~I m.i 3 ;;- . ~ [~ . Ii: Iii. ~'a. ;i.W 9'~ [ig 0"- . '" ~ ~ . 0 ~. 5"g ~, 0" Rlo ~1f: a..~ ~. " ~ .- n o ~ it ~ . 3 . .. "- < . .,- o ~ n ~ [ n ;; ~ ,.. fTlQU)r"Hf.l 1Tl:J:tr.lf ~q!!1g-g.(i~?;g. -U)(IlOO~ 0 ~a~o ~.2.!k. Q...:c ~~.~ ~g ~~ ~<nQ.3:r:7<-n ~ 0 -l CD ~ S!!. JJ 't1l6"9.SI:J<!!l- S("Q.~@"li~W ls:~~~m III xoJJ !~i~~~ <i ~[ iW .. t ~ i ~ ~ ii r ~ ~ [ ~ l\. ~ ~ f i!' ~ i '- < g. n ;. ~P-' ~~ll!~~:-,:-,~~ aoO WCClcn.....NCO ....w .::T.lCO-'CJOO1 ....N ~wO.{!o.OJ"'" ~ ~~NNN~ ~ ~. .!l0l~~~ W./l>o. 0:-' t119=':-L:-'p1~ {iOO .,......(1)-"0001 ...00 WOOCT.IW-....J "'00 O"'"-lo:DNN(T.I ~ NNNNNN < . ,. ~ 0- ~O"'" 'a.~l3It~..........~~ 2::;:::; ~~~~~~ ....... .....,CCWCClo:lOl N' NN'N~NH < . ~. c- ~O"'" 'C U1ll!:"""1'J w.,.. ~!: i;;l'j~::~~ ...~ ~~~~~~ ~ ~. cr ~O"" ~ ~Qo O~:-':-'~~ [~ wn~~~ < . .. ... :lo..... ~CJ)Cii". W .....f:oo !il..p g~:-':-'91:--J Ole N......U"I....o:ot11 000 .,..tD.,ro......on...... ...0 ..O:'OOWtD...... N' N'N'N'N'NN' ~ ~ o- f\.!' N O'lW ~~P'~~~~ ~ ~"'~~~ cn....o..... oN' MN'NN' n ~ '< ~ '" iil ... . w '" ~ "' ... e i;i w ... ~ w ill '" " ~ ~ ~ . " . w '" o !'l I;l Hi ~ ... ! -l -l -l :s:: ~ ""IJ:;; "'tI g, "IJ ll! ~ QI ~ -i~ !k.!I: ;<- alto~ozo::e. gz~ng~~~ -0 ll!=-I=~ -a'" aU::$ ll!::l Ci -l-jOlOXO ll!,.., O'ID n(ii CDXJ/PqWll!2: ; ~!k. ~ ~ CD ~. ~ '" ,'" N N g ~ ....., ~ ~ .....o:n 00......,......-' N.....~fT1N~N........ CCI-....lW""",(DtJ'lcn"" ~~~~~~~8 " ~ ~ ~ o 0 ~ '" ~ ~ :,.. ~C:Jiwat~o~::::: N'.....tf...jOi:DCo:"""u. (l)COLTI""'"UlW"","O X""'N(l)NWNO ~ '" w ~ en ~ ~ ......1'.) lJ1....................... en......w""'LTlU'I.....w ~~R3ldffi~~~ N01XUl~ONO '" ,""," pi p ......ffi gj....fg....~ ......~wco....wwt1l ~~~~~~~~ e. !N !N ~ ~ t1I to 0 ....0 0;)....(.0....1'.) ""'"~.,..~UlWt1l(l) ~~~~~tl~'8 '" '" ~ ~ .:,.(j ~.:,.~-"~ (l)(.OWOlCOt1l...... ~8~31l:g~~~ NO~.,..N."..XO gj ~ . ~ '" w io e. p,~"'~:::l":::,~ WI'.)NOOlWUlO OOl........OlOlWUl...... NwNw~NNCD r O.....""1J:;-otnoor-rn(D 9"c"o~."-Q'~" m x 2: III Ii ;3 ~ III 0 :00' a-t3t: r-U'J-<:! i.' l!. tn i:: 0 n ~ ~ Q;1lI0 III "TI\7' @'" i' ~ :::I:!l. 5~. ...,'C ~ S a. o' ~. ~ c'\'" , ~,.g ~ ~ :::I'!i:Q. ~ IC _ ~ 3 " ~ l'1 g)-Iv ,~;s: ~ ,(Dt!l,f:3 ~tll 8 l:SSlR ....('oOOOOUlCN ~ 91 ~~,.......N we ~ ~ro~ lHloo~on~ '" ,w,~~ ,at ffiffi~ (.00;110 0 'mo'.....i ffi~::n~ogo~gg;: ~ w W~ C:.N ~~ ~w '" ~ ,h~ g ~g~ ooowow . ,(l)p1~,~ ~ ~?a~ ................00 0 0')00 w~g80go~g~ ~~ ilIe. ",gj ~ N Ul ~ g;: grs:;;;:gJ& ~ 'i3""'''e. ONO. o owo. ~ ............ N W .wmw........m.... ................. rvt1l m 0 , , , b1 'O'l' , ::j1!ll1l;:jRl!!!~ z ". ~~ :0.. [ ~ n " ~ . ~ ~ Ii: -'" ~~ ~g ...~ ~ bo ~~ "'w "......... ~"' "w '" _RJ ~w ~~ ~ '" ~ "'~ .S ~w '" '" -~ ~o 'l1e. ...~ ~ -- ~~ ~~ ...~ . -~ -~ ~~ ...~ ITEM 5.3.B. ;!'~ i.. -~ ,,, H . ~. ,,0 ~ ~ ~ ~ .!!. ~I c: tn r- 0 ~i ;J:1L 3 n r ~a:[o 8.r-r-~ I;';~ .. "' '" bo bo '" '" ~ ~ ~ ~ '" w ~ bo ~ w '" ~ ~"'~ NWU, o~~ w-~ bllllbo UlooB o -~'" ou.u, o~~ ~~o ~~~ oow- o ,;ro.p1 "''''- ~~- o~oo n~ ~ o 0- glll ...~ ,'" f> ~ !!l ii'j" "-< o . n -< n . M ~~ M ~ ~ ~ '" w ~~ M " ",n !iJ~ rno ~;:; ...r ~~ 0< >rn )!'" ~ 13 w '" 00 '" ~~ M ~~ 00 00 ~w M ~~ M ~~ 88 ~- M '" o '" 00 !!l ~~ r '" W~~~~g ITEM 5.3.B. .II c c '" :2.5' m m ~ 3 I Q S QlD--33 "- () fJI fJI ~ 5 Gl CD 0 -" m ' , .,. S , it -10 m .. g. ~ " iil 0 ." , 0 c 0 " , is 0. <0 ~ '" n I "'0 O:S:::::::jO c: ~ m ~::!!!!!. m&. '" ., ~ ~ Q. @ ~.g ('II 0 9> ~~ ij1"8 ~ ~ "-(11:;';:+0 r ;:;:@~nCI.I""" Z :::I....,Q51t1-o2 m m lB' - ~ 3 I :;; (Jj :J _.(1:1 ." f] ;nl ~~ -- 0 o 0 -~ , '" a S - =i S" c'i" 16 6 ~ iii" .... z Q , '" ." "lJ"T'I"'''T'I"'O'''lJ ., -i-l-i-l-t-l :! ..................,t:. I """''''' " Ni'3~~t.:3 0 OONoo 0 00000 " <Xl CJ)a c:ooo m " 0. ~ ~ ." ~ a; In~ m N ~ ~ ~ ~ ~ 0" .. '" 0 COO1.j>.......l>o.O> ~if ;; " .. -mw'O:l-Ol-N- ~ 0 OOOQ10()'l , 0 0 0 000000 ~ ~ ~ In)> o 0. " .N "'''' W 0. 0; " 0; 0)-0'0 iii-= (f) ~ ~oo :>! '" 0 0 0 000 0 ." 0 ~ ." a> )> co I- 0 c 0 0 =< Gl .. <5 ~ 0" co. z O~ (f) 00 ~d i[ ~ ~ ~ ~ Ia'~ "8 a~ wO., m 0. 0. -- , '" '" ., I 0 .,,- __ c , 0. ~ m -0. 5- ITEM 5. 3.B, 2008 CAPITAL OUTLAY Department 11em Raquesled Amounl General Fund Fundi"!:! Source EquIpment Copllal Outlay Certificate Reserve 0"" Fund Department T<'''' Information Tech Phone System Upgrade at Fire Station 1 Microsoft licensing HP Storage Area Network BarracuDa S amMrus Firewall Re laeeman! 60,000 10,000 30,000 15,000 5,000 City Hall/Building Maintenance New vehicle with plow 2 water heaters 32,000 8,500 40,500 Building Scanning Equipment 55,000 55,000 Police 3-Mobile video cameras Squad Cars (3) Upgrades to 800 MHZ radio Mobile Squad computers (3) Police software - LETG repayment eso Vehicle 19,000 99,000 10,000 18,000 57,600 30,000 233,600 Emergency Mgmt Siren Mississi i Rd and Rawlins St NW Streets Front End Loacier (replaces 305) BackHoe Steel Roller Skid Loader Trailer Crack Router 1 Single Axle with Plow (replaces 223) Skid Loader Trade 4x4 telescopic lift Roof re air - Street Engineering 10,000 10,000 5,000 25,000 Sr. Citizens 10,500 20,990 31,490 Park Maintenance 49,000 7,500 23000 " 79,500 "" '"'0' 993,940 Linner 16,000 16,000 Boat Dock 3,800 Electronic checkout 18,000 Floor Scrubber 5,400 27,200 Electric Resurfacer 106,000 Replace battery in Electric Resurfacer 9,500 Li~hl fixtures in the Olvmpic rink 55,000 170,500 Wastewater Safety grates for wetwelis 35,000 New control panel - lift 15,000 Inew confined space entry tn-pod/lifeline 5,000 55,000 Liquor Total $1,262,640 $0 $0 $0 $0 $0 61712007