Loading...
INFORMATION #3 10-10-1994 r / ~'\( ( II !Ii{ River INFO RMAr/ON MEMORANDUM TO: MAYOR AND CITY COUNCIL FROM: STEPHEN ROHLF, BUILDING AND ZONING ADMINISTRATOR 5R OCTOBER 5, 1994 DATE: SUBJECT: UPA AND NSP United Power Association (UPA) Attached to this memo is a letter dated October 3, 1994, from UPA to Mr. Todd Biewen from the Minnesota Pollution Control Agency. This letter is in regards to an exceedance UPA had on carbon monoxide. Carbon monoxide is an indicator of proper combustion. It is continuously monitored to show whether or not the refuge derived fuel at UPA is being properly burned to avoid the production of contaminants. . On September 29, 1994, UPA experienced an exceedance on the carbon monoxide standard in two of their three boilers. This was due to not enough air flow to these boilers for proper combustion. The reason for the restricted air flow was that the bag house filters, which remove particulates from the exhaust gasses, were plugged. Restricted air going out of the system caused the air entering the system to be restricted also. The exceedance is regrettable, but what is important with this issue is what UPA will do to keep this situation from happening again. In the past, other problems have caused UPA to change operational practices and/or equipment. UPA has been diligent at keeping problems from reoccurring. The corrective action for this exceedance can be found on the attached letter to Mr. Biewen. NSP . On October 4, 1994, at approximately 10:30 PM, a hot load of garbage (on fire) was delivered to the NSP Refuse Derived Fuel Plant in Elk River. The fire was contained by the Elk River Fire Department and the sprinkler system within the building. No fire suppression water left the building, therefore, the fire was of little consequence. cc-SRlCouncil P.O. Box 490 . 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 Page 2 . Fire Chief Bruce West, who was at the scene, was able to get a limited tour of the NSP facility. Staff will try to arrange a complete tour of both the NSP and UPA facilities for Mr. West, in the near future. . . OCT-04-94 TUE 09:57 AM UNITED POWER ASSOCIATION 612 2412454 P. e..1. . ~~ United Power Assooiatlon P.O,eol800 . ElkRlver.MN55330-0800 . (612)441-3121 October 3, 1994 File: 8-30-4 --------- Mr. Todd Biewen Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, Minnesota 55155 767' Oate fO Phone. Fad l-t42- c:.. -dod-O ~ ax' Dear Mr. Biewan: On September 29,1994 we experienced exceedances of the carbon monoxide (CO) emission limitation in Boilers 11 1 and #2 of the Elk River Station. These exceedances were reported on September 30 to MPCA (your voice mail and Jolm Morrill of your staft) and to the City of Elk River (Steve Rohlf). Those telephone reports and this . written report are made pursuant to permit #147-86-0T-I as amended and extended. The attached report provided the specifics of the exceedances. Please call us if you need additional infonnation. Sincerely, UNITED pQ"~rER A~IATION 4U-VI..~~ J sF. Eggen, ager nvironmental S rvices Power Generation . JFE:bjn Attach. c: City Council, City of Elk River Steve Rohlf, City of Elk River John Lichter, City of Elk River Wayne Hanson, UPA Carl Sulzer, UP A Mark Zaban, Hennepin County Julie Hendricks. MPCA-Brainerd OCT-04-94 TUE 09:58 AM UNITED POWER ASSOCIATION 612 2~12~54 P.02 . United Power Association - Elk River Station Notification of Exceed.nce MPCA Permit No. 147A4600T.1 Average Time Emission Corrective Unit Date Period Unit Emission Rate Cause Action Status 29-Sep-Q4 0800-1400 Boiler 1 CO 433 See Below See Below 10.7 29-Sep-Q4 0800-1400 Boiler 2 CO 426 See Below See Below 10.7 U nit Status: This is the average load in gross megawatts for the duration of the exceedance. It only includes time the units are on line and burning RDF. Cause: During a capability test on the plant the Cleaning system in the fabric filter failed to adequately clean the bags resulting in a flow restriction in this system. This restriction limited the amount of combustion air available to the boilers resulting in an increase in the generation of CO in the combustion process. .C . - errectlve Action: The operators adjusted air and fuel flows and burned natural gas in an allempt to get the CO below the 400 ppm limit. When the problem could not be corrected with these operational adjustments these units were taken off RDF fuel and run at minimum load on gas only. Air infiltration from leaks in the ductwork is believed to be a contributing factor to the high fabric filter pressure drop during high load operation. The ductwork will be inspected and repaired as necessary during the next scheduled plant outage. .