Loading...
3.7. SR 06-18-2007 REQUEST FOR ACTION To Ci Council Agenda Section Consent Item Description Adoption of Otdinances A. Repealing all of the Existing Section 30-416 Etosion and Sediment Control of the City Code of Otdinances and Adopting aNew Section 30-416-Excavation, Grading, and Erosion Control . Resolution Approving Summary Publication of this Ordinance Amending Chapter 30 by Adding Article VII-Storm Water Management . Resolution Approving Summary Publication of this Ordinance Meeting Date une 18, 2007 Item Number 3.7* Prepared by Rebecca Hau ,Environmental Admin Reviewed by Loti ohnson, Ci Administrator Reviewed by B. Action Requested Staff is recommending adoption of the attached Stormwater and Excavating, Grading, & Erosion Control ordinances. Due to the length of the ordinances, staff is also recommending adoption of the attaehed resolutions approving summary publication of each ordinance. Background/Discussion At the April 16, 2007 City Council meeting, staff gave an update on the City of Elk River's NPDES permit requirements. As stated at that meeting, a component of the permit is to adopt a Storm Water Ordinance. An ordinance was provided to you at the meeting for your review. One change that has been made since that meeting is in reference to penalties. This seetion has been omitted after review by the City Attorney. The City currently has a section in the ordinance on Erosion and Sediment Control (see. 30-416); however, it does not cover all of the areas we ate required to undet the NPDES permit. Staff is requesting that this section be repealed and replaeed with the attached Excavating, Gtading & Erosion Control Otdinance. It is much more detailed as to what the requirements are. The proposed Storm Water Ordinance is new. The language contained in this ordinance is similar to a majority of other communities such as Woodbury, Valley Branch Watershed District, Brown's Creek Watershed District, and Ramsey-Washington Metro Watershed District. The language is from sample ordinances provided by the Minnesota Pollution Control Agency (MPCA) and the Northland Nonpoint Education for Municipal Officials (NEMO) Program. One of the key components of this ordinance is to comply with the State's goal of obtaining a pollutant loading water quality model that will provide, at minimum, changes in Average Annual Flow Volume, Total Suspended Solids and Phosphorus. The following are the levels to be obtained with development: . Reducing the amount of phosphorus by 60% for new developments and 40% for redevelopments that do not currendy meet 60%. . Volume control measures to determine infiltration rates prior to approval of plans . 60% removal of Total Suspended Solids . Both ordinances refer to the City's Engineering Design Guidelines for other design criteria To meet the requirements of the NPDES phase II MS4 pertuit, the City will need to complete an assessment of the City's stormwater discharge. Staff will be soliciting proposals to complete a nondegradation report which will detail the assessment. Staff will be coming back to the Council with the proposal and projected cost. Staff also held a public meeting for builders, developers, excavators, and small utility contractors on Wednesday, February 28,2007 as well as several staff meetings to review the proposed ordinances. The attendees were asked to provide comments and the city did not receive any. The Planning Commission reviewed the proposed ordinances at their April 10, 2007 meeting and recommended the Council approve the ordinances. Attachments . Ordinance Amending Section 30-416 of the Elk River Municipal Code - Erosion and Sediment Control, by Repealing All of Section 30-416 of the Elk River Municipal Code and Adopting New Section 30-416 of the Elk River Municipal Code - Excavation, Grading and Erosion Control . Resolution Approving Summary Publication of above Erosion and Sediment Control Ordinance . Ordinance Adding Article VII, Storm Water Management, to Chapter 30 of the Elk River Municipal Code . Resolution Approving Summary Publication of the above Stormwater Ordinance Action Motion by_ Second by _ Vote Follow Up I ORDINANCE 07-_ CITY OF ELK RIVER AN ORDINANCE OF THE CITY OF ELK RIVER AMENDING SECTION 30- 416 OF THE ELK RIVER MUNICIPAL CODE, - EROSION AND SEDIMENT CONTROL, BY REPEALING ALL OF SECTION 30-416 OF THE ELK RIVER MUNICIPAL CODE AND ADOPTING NEW SECTION 30-416 OF THE ELK RIVER MUNICIPAL CODE - EXCAVATION, GRADING AND EROSION CONTROL THE CITY COUNCIL OF THE CITY OF ELK RIVER DOES HEREBY ORDAIN AS FOLLOWS: SECTION I. SECTION 30-416 OF THE ELK RIVER MUNICIPAL CODE IS HEREBY REPEALED. SECTION 2. NEW SECTION 30-416 OF THE ELK RIVER MUNICIPAL CODE IS HEREBY ADOPTED, AS FOLLOWS: SECTION 30-416. EXCAVATION, GRADING AND EROSION CONTROL (A) Purpose. The purpose of this chapter is to protect the public health, safety and general welfare by regulating grading on private property. (B) Scope. This chapter sets forth rules and regulations to control excavation, grading and earthwork construction, including fills and embankments; establishes the administrative procedure for issuance of permits; and provides for review of plans and inspection of grading construction. (C) Permits required. No person shall do any excavation or grading without first having obtained a grading permit from the city, except for the following: 1. Excavation, grading and filling necessary for approved development plans and the construction of structures, sewage treatment systems, and driveways under validly issued permits for these facilities do not require the issuance of a separate excavation, grading, and filling permit. However, the excavation, grading and filling standards in this section shall be incorporated into the issuance of permits for development plans and for construction of structures, sewage treatment systems, and driveways. 2. A permit is not required for incidental excavation, grading or filling for landscaping projects, including but not limited to spreading black dirt three inches to four inches in depth for seeding and sodding purposes and decorative rock gardens. I 3. An excavation below finished grade for basements and footings of a building, retaining wall or other structure authorized by a valid building permit. This shall not exempt the requirement for a permit for fill made with the material from such excavation nor exempt any excavation having an unsupported height greater than 5 feet after the completion of such structure. 4. Cemetery graves. 5. Refuse disposal sites controlled by other regulations. 6. Excavations for wells or tunnels or utilities. 7. Mining, quarrying, excavating, processing, stockpiling of rock, sand, gravel, aggregate or clay where established and provided for by law or ordinance. This shall not exempt these types of activities from the special use permit requirements set forth in portions of the City Code. 8. Exploratory excavations under the direction of soil engineers or engineering geologists. 9. An excavation which is less than two (2) feet in depth, or does not create a cut slope greater than 5 feet in height and steeper than two horizontal to one vertical (2:1). 10. A fill which is less than two (2) feet in depth and placed on natural teuain with a slope flatter than three horizontal to one vertical (3:1), or less than three (3) feet in depth, not intended to support structures. The fill shall not exceed fifty (50) cubic yards on anyone (1) lot and shall not obstruct a drainage course or infringe upon a ponding area or wet land. 11. Exemption from the permit requirements of this chapter shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this chapter. 12. State requirements for work in wetlands. Any excavation, grading and filling in a wetland must meet the requirements of Minn. Stats. 55 103F.612--103F.616. 13. Conditional use permit required for cerlain projects. Any wedand excavation, grading, or filling project where the wedand encompasses more than one parcel shall require a conditional use permit pursuant to subdivision III of division 2 of this article before any excavating, grading or filling activity can take place. D. General conformance. Whenever the city determines that any existing excavation or embankment or fill on private property has become a hazard to life and limb, or endangers property, or adversely affects the safety, use or stability of a property, public way or drainage channel, the owner of the property upon which the excavation or fill is located, or 2 other person or agent in control of said property, upon receipt of notice in writing from the city, shall within the period specified therein repair or eliminate such excavation or embankment so as to eliminate the hazard and be in conformance with the requirements of this code. The city may inspect any property for conformance with this chapter. E. Definitions. For the purposes of this chapter the defmitions listed hereunder shall be construed as specified in this section. AllProval means the proposed work or completed work conforms to this chapter in the opinion of the city. As-graded means the extent of surface conditions on completion of grading. Bedrock means in-place solid rock. Bench means a relatively level step excavated into earth material of which fill is to be placed. BOfTOW means earth material acquired from an off-site location for use in grading on a site. CifY means the administrative staff, or its agency, of the City of Elk River. CifY Council means the elected governing board of the City of Elk River. Civil Engineer means a professional engineer registered in the State of Minnesota to practice in the field of civil engineering. Civil Engineering means the application of the knowledge of the forces of nature, principles of mechanics and the properties of materials to the evaluation, design and construction of civil works for the beneficial uses of mankind. Contpaction means the densification of a fill by mechanical means. Designer means a person registered by the Minnesota Board of Architects: Engineers, land surveyors and landscape architects responsible for the preparation of the grading plans and specifications. Earth Material means any rock, natural soil or fill and/ or any combination thereof. Enrjneering Design Guidelines means the guidelines developed, published and periodically updated by the City. Engineering Geolorjst means a geologist experienced and knowledgeable in engineering geology. 3 Engineering Geololl means the application of geologic knowledge and principles in the investigation and evaluation of naturally occurring rock and soil for use in the design of civil works. Erosion means the wearing away of the ground surface as a result of the movement of wind, water and! or ice. Excavation means the mechanical removal of earth material. Fill means a deposit of earth material placed by artificial means. Geotechnical Engineer. See "Soils engineer." Grade means the vertical location of the ground surface. Existing grade means the grade prior to grading. Rt;ugh Grade means the stage at which the grade approximately conforms to the approved plan. Finish Grade means the final grade of the site which conforms to the approved plan. Grading means any excavating or filling or combination thereof. l:$! means a designed compacted fill placed in a trench excavated in earth material beneath the toe of a proposed fill slope. Site means any lot or parcel of land or contiguous combination thereof, under the same ownership, where grading is performed or permitted. Slobe means an inclined ground surface the inclination of which is expressed as a ratio of horizontal distance to vertical distance. Soil means naturally occurring superficial deposits overlying bed rock. Soils Engineer (Geotechnical Engineer) means an engineer experienced and knowledgeable in the practice of soil engineering (geotechnical engineering). Soils Engineering (Geotechnical Engineering) means the application of the principles of soils mechanics in the investigation, evaluation and design of civil works involving the use of earth materials and the inspection and/or testing of the construction thereof. Terrace means a relatively level step constructed in the face of a graded slope surface for drainage and maintenance purposes. 4 F. Grading permit requirements. 1. Pennits required. Except as exempted in, no person shall do any grading without first obtaining a grading permit from the city. A separate permit shall be required for each site, and may cover both excavations and fills. Changes or deviation from previously reviewed plans require an amended permit be applied for and approved before the work is performed. 2. When pennit mcg be applied for and issued. A grading permir may be applied for ar any time. On a site that needs City Council approval a grading permit may not be issued until such approval has been granted. 3. Application. To obtain a permit, the applicant shall first file an application in writing on a form furnished by the city for that purpose. Every such application shall: (a) Identify and describe the work to be covered by the permit for which application is made. (b) Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work. (c) Indicate the purpose of the proposed work. (d) Be accompanied by plans, diagrams, computations and specifications and other data as required in subsection (e) of this section. (e) State the valuation of the work. (I) Be signed by the permittee or his authorized agent. (g) Give such other data and information as may be required by the city. 4. Plans and pecifications. Each application for a grading permit shall be accompanied by five (5) sets of plans and specifications and supporting data. The plans, specifications and reports shall be prepared by an Engineer, Land Surveyor and Landscape Architect signed by a person registered by the State of Minnesota unless exempted by the city. 5. Infonnation on plans in pecifications. The plans shall include the information set forth in the grading permit application and the Engineering Design Guidelines. 6. Alternate materials and methods of construction. The provisions of this chapter are not intended to prevent the use of any material or method of construction not specifically prescribed by this chapter provided any alternate has been approved and its use authorized by the city. The city may approve any such alternate, provided the city finds the proposed design is satisfactory and complies with the provisions of this chapter and that the materia~ method or worked offered is, for the purpose intended, at least the equivalent of that prescribed in this code in suitability, strength, effectiveness, fire resistance, durability, safety and sanitation. The city shall require that sufficient evidence or proof be submitted to substantiate any claims that may be made regarding 5 its use. The details of any action granting approval of an alternate shall be recorded and entered in the files of the city. 7. Modifications. Whenever there are practical difficulties involved in carryIng out the provisions of this chapter, the city may grant modifications for individual cases, provided the city shall first find that a special individual reason makes the strict letter of this code impractical and that the modification is in conformity with the intent and purpose of this code. The details of any action granting modifications shall be recorded and entered in the files of the city. 8. Tests. Whenever there is insufficient evidence of compliance with any of the provisions of this chapter or evidence that any material or construction does not conform to the requirements of this chapter, the city may require tests as proof of compliance to be made at no expense to the city. Test methods shall be as specified by this chapter or by other recognized test standards. If there are no recognized and accepted test methods for the proposed alternate, the city shall determine test procedures. 9. Soils engineering report. The soils engineering report, when required, shall include data regarding the nature, distribution and strength of existing soils, conclusions and recommendations for grading procedures and design criteria for corrective measures, including buttress fills, when necessary, and opinions and recommendations covering adequacy of sites to be developed by the proposed grading, including the stability of slopes. Recommendations included in the report and reviewed by the city shall be incorporated in the grading plans or specifications. 10. Engineering geology report. The engineering geology report, when required, shall include an adequate description of the geology of the site, conclusions and recommendations regarding the effect of geologic conditions on proposed development, and opinions and recommendations covering the adequacy of sites to be developed by the proposed grading. Recommendations included in the report and reviewed by the city shall be incorporated in the grading plans or specifications. 11. Noise. Maximum noise level at the excavation, grading, or filling site shall comply with the limits or standards established by the Minnesota Pollution Control Agency (J'v1PCA) and the United States Environmental Protection Agency (USEPA). 12. Hours of operation. All excavation, grading and filling operations shall be conducted between 7:00 a.m. and 7:00 p.m., Monday through Saturday only unless prior approval is given by the city. The Council may restrict excavation processing or related operations on legal holidays if such activities cause noise or other disturbances to adjacent property owners. 13. Review and issuance ofpermit. The application, plans, specifications, 6 computations and other data filed by an applicant for a permit shall be reviewed by the city. Such plans may be reviewed by other departments of the jurisdiction to verify compliance with any applicable laws under their jurisdiction. If the city finds that the work described in an application for a permit and the plans, specifications and other data filed therewith conform to the requirements of this chapter and other pertinent laws and ordinances, and that the fees and security requirements for the permit have been provided, the city shall issue a permit to the applicant. When the city issues the permit where plans are required, the city shall endorse in writing or stamp the plans and specifications "Reviewed". Such reviewed plans and specifications shall not be changed, modified or altered without authorization from the city, and all work shall be done in accordance with the reviewed plans. The city may issue a permit for grading before the entire plans and specifications have been submitted or reviewed, provided adequate information and detailed statements have been filed complying with all pertinent requirements of this chapter. The holder of such permit shall proceed at his own risk without assurance that the permit for the entire project will be granted. 14. &tention of plans. One (1) set of reviewed plans, specifications and computations shall be retained by the city for a period of not less than ninety (90) days from date of completion of the work covered therein; and one (1) set of reviewed plans and specifications shall be returned to the applicant, and such set shall be kept on the site of the building or work at all times during which the work authorized thereby is in progress. 15. Validity ofpermit. The issuance or granting of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this chapter or of any other ordinance of the city. No permit presuming to give authority to violate or cancel the provisions of this chapter shall be valid. The issuance of a permit based upon plans, specifications and other data shall not prevent the city from thereafter requiring the correction of errors in said plans, specifications and other data, or from preventing grading operations being carried or thereunder when in violation of this chapter or of any other ordinance of the city. 16. Expiration. Every permit issued by the city under the provisions of this chapter shall expire by limitation and become null and void if the work authorized by such permit is not commenced with ninety (90) days from the date of issuance of such permit, or if the work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of one hundred eighty (180) days. Before such work can be recommenced, a new permit shall be first obtained to do so, and the fee therefore shall be one-half the amount required for a new permit for such work, provided no changes have been made or will be made in the original plans and specifications for such work; and provided further that such suspension or abandonment has not exceeded one (1) year. In order to 7 renew action on a permit after expiration, the permittee shall pay a new full permit fee. Any permittee holding an unexpired permit may apply for an extension of the time within which the permittee may commence work under that permit when the permittee is unable to commence work within the time required by this section for good and satisfactory reasons. The city may extend the time for action by the permittee for a period not exceeding one hundred eighty (180) days upon written request by the permittee showing that circumstances beyond the control of the permittee have prevented action from being taken. No permit shall be extended more than once. 17. Suspension or revocation. The city may, in writing, suspend or revoke a permit issued under the provisions of this chapter whenever the permit is issued in error or on the basis of incorrect information supplied, or is found to be in violation of any ordinance or regulation or any of the provisions of this chapter. G. Grading fees. Fees shall be charged in accordance with the provisions of this section and as set forth in the fee schedule adopted by the City Council by resolution from time to time. H. Financial security. 1. The city may require bonds in such form and amounts necessary to assure that the work is completed in accordance with the approved plans and specifications. 2. In lieu of a surety bond the applicant may file a cash bond or instrument of credit with the city in an amount equal to that which would be required in the surety bond. 3. If requested by the applicant, the amount of the financial security may be reduced by the city. Such reduction will be based upon the extent to which the grading and restoration have been completed and shall consider the continued need for erosion control. 1. Amended permits. Any changes desired to be made to the grading plan by the applicant following the issuance of a grading permit shall be submitted to the city for review. 1. No grading changes may be implemented by the applicant unless approved by the city. 2. Any desired change to the grading plan shall be supported by information showing the change desired, the reasons for the change, the effect the change would have upon buildings, structures, drainage facilities and patterns. The request shall be accompanied by any additional supporting information required by the city. 8 J. 3. If the changes requested by the applicant are acceptable, the city will issue an amendment to the grading permit. Cuts. 1. Generally. Unless otherwise recommended in the approved soils engineering and/ or engineering geology report, cuts shall conform to the provisions of this section. In the absence of an approved soils engineering report, these provisions may be waived by the city for minor cuts not intended to support structures. 2. Slope. The slope of cut surface shall be no steeper than is safe for the intended use and shall be no steeper than three horizontal to one vertical (3:1), for a short term interim period, unless the owner furnishes a soils engineering or an engineering geology report, or both, stating that the site has been investigated and giving an opinion that a cut at a steeper slope will be stable and not create a hazard to public or private property. Unless specifically approved, permanent slopes shall be no steeper than three horizontal to one vertical (3:1). 3. Drainage and t"racing. Drainage and terracing shall be provided as required by the Engineering Design Guidelines. K. Fills. 1. Generally. Unless otherwise recommended in the approved soils engineering report, fills shall conform to the provisions of this section. In absence of an approved soils engineering report, these provisions may be waived for minor fills not intended to support structures. 2. Clearing area to be jilled. All timbers, logs, trees, brush and rubbish shall be removed from the site. No burning of the debris will be allowed unless a burning permit is issued by the city. 3. Preparation of ground. The ground surface shall be prepared to receive fill by removing vegetation, noncomplying fill, topsoil and other unsuitable materials. The ground shall be scarified to provide a bond with the new fill and, where slopes are steeper than five to one (5:1) and the height is greater than five (5) feet, by benching into sound bedrock or other competent material as determined by the soils engineer. The bench under the toe of a fill on a slope steeper than five to one (5:1) shall be at least ten (10) feet wide. The area beyond the toe of fill shall be sloped for sheet overflow or a paved drain shall be provided. When fill is to be placed over a cut, the bench under the toe of fill shall be at least ten (10) feet wide but the cut shall be made both as a suitable foundation for fill. 4. Fill material. Organic material shall not be permitted in building pad or roadway areas. Except as permitted by the city, no rock or similar irreducible material with a maximum dimension greater than twelve (12) inches shall be buried or placed in fills. 9 Exception: The city may permit placement of larger rock when the soils engineer properly devises a method of placement, continuously inspects its placement and approves the fill stability. The following conditions shall also apply: (1) Prior to issuance of the grading permit, potential rock disposal areas shall be delineated on the grading plan. (2) Rock sizes greater than twelve (12) inches in maximum dimension shall be ten (10) feet or more below grade, measured vertically. (3) Rocks shall be placed so as to assure filling of all voids with fines. (e) Compaction. All fills shall be compacted to a minimum ninety (90) percent of maximum density as determined by the specified density method. In-place density shall be determined in accordance with AS1:M D698-70. 5. Slope. The slope of fill surfaces shall be no steeper than is safe for the intended use or three horizontal to one (3:1) vertical, whichever is less. 6. Drainage and terracing. Drainage and terracing shall be provided and the area above fill slopes and the surfaces of terraces shall be graded and paved as required by the Engineering Design Guidelines. L. Setbacks 1. Generally. Cut and fill slopes shall be set back from site boundaries in accordance with this section. Setback dimensions shall be horizontal distances measured perpendicular to the site boundary. Setback dimensions shall be shown on the grading plan. 2. Top 0/ tut slope. The top of cut slopes shall be made not nearer to a site boundary line than one-fifth of the vertical height of cut or a minimum of two (2) feet, which ever is greater. The setback may need to be increased for any required interceptor drains. 3. Toe 0/ fill slope. The toe of fill slopes shall be made not nearer to the site boundary line than one-half the height of the slope or a minimum of two (2) feet which ever is greater. Where a fill slope is to be located near the site boundary and the adjacent off-site property is developed, special precautions shall be incorporated in the work as the city deems necessary to protect the adjoining property from damage as a result of such grading. These precautions may include but are not limited to: (a) Additional setbacks. (b) Provisions for retaining or slough walls. (c) Mechanical or chemical treatment of the fill slope surface to 10 . .. . .n.u.nun1Ze erosion. (d) Provisions for the control of sutface waters. 4. Modification of slope location. The city may apptove alternate setbacks. The city may requite an investigation and recommendation by a qualified engineer or engineering geologist to demonstrate that the intent of this section has been satisfied. M. Erosion control. Purpose The putpose of this chapter is to protect sutface water quahty and safeguard private ropertty and public welfare by establishing etosion control. N. Scope This chapter sets forth rules and regulations to related to erosion control; establishes the administrative procedute for review of plans and inspection of Etosion Control practices Best management practices as defined by the MPCA, requitements of the NPDES Construction permit shall apply in the subdivision and development of land areas including construction sites permitted thtough grading permits or building permits. O. Storm Water Pollution Prevention Plan (SWPPP) 1. A Storm Water Pollution Prevention Plan (SWPPP) is requited for all construction sites with a distutbed area greater than or equal to twenty thousand (20,000) square feet. The SWPPP must be submitted for review and apptoved prior to any land distutbing activities. The SWPPP will desiguate the temporary and permanent etosion control measutes to be incorporated in the site development. The SWPPP must meet the requitements described in the MPCA NPDES construction permit, PART III as well as the requited contents and format of the SWPPP described in the City of Elk River Engineering Desigu Guidelines. 2. Sites with less than twenty thousand (20,000) square feet of distutbed area are requited to meet the ptovisions of the MPCA NPDES construction site permit PART IV related to etosion and sediment conttol. This requitement applies to consttuction sites permitted by a building and or grading permit issued by the City of Elk River. 3. Consttuction sites must have perimeter best management practices and consttuction site enttances installed and inspected before the City of Elk River will issue a permit for building. 4. Ftozen Ground Conditions do not exempt a site from complying with the requitements of this Chapter. At the applicant's request alternative perimeter 11 controls may be implemented in place of the required silt fence installation. A "Frozen Ground Agreement" must be completed, signed and submitted. 5. The following guidelines shall be applied at the city's discretion: (a) The development shall conform to the topography and soils so as to create the least potential for soil erosion. (b) Erosion and sediment control measures shall be coordinated with the different stages of development. Appropriate control measures shall be installed prior to development when necessary to control erosion. (c) The smallest practical increment of land shall be exposed at anyone time during development. (d) When soil is exposed, the exposure shall be for the shortest feasible period of time, (e) Where the topsoil is removed, sufficient arable soil shall be set aside for respreading over the developed area. The soil shall be restored to a depth of four inches and shall be of a quality at least equal to the soil quality prior to development. (f) Critical erosion areas exposed during construction shall be protected with temporary vegetation, mulching or other acceptable means. (g) Sediment basins (debris basins, silting basins, or silt traps) shall be installed and maintained to remove sediment from runoff waters from land subject to earth disturbance activities. (b) Diversions shall be installed to divert surface water runoff from slopes of ten percent or steeper. (i) Provisions shall be made to effectively accommodate increased runoff from slopes of ten percent or steeper. 0) Cut and fill slopes shall not be steeper than three feet horizontal to one foot vertical (3:1) unless stabilized by a retaming wall, riprap, or other acceptable means. (k) During grading operations, necessary measures for dust control, as required by the city, shall be implemented. (Code 1982, S 1008.14(8)) P. Inspection. (1) Generalb. All grading operations for which erosion controls measures are required shall be subj ect to inspection by the city. (2) Regular Site Inspection. The City shall inspect sites permitted for construction by 12 building permits, grading permits and subdivision development. The inspections will be made to insure conformance with the SWPPP and with the requirements of the MPCA NPD ES Construction Permit as they apply to the site. This regular site inspection does not relieve the applicant of their responsibility to conduct site inspections as required in the MPCA NPDES construction permit. (3) The costs associated with regular site inspections will be the responsibility of the applicant. In the case of sites less than twenty thousand (20,000) square feet this fee will be charged at issuance of the building permit at a rate set in the schedule of fees approved by the City Council. (4) &gular grading requirements. The city may require inspection and testing by an approved testing agency. The testing agency's responsibility shall include, but need not be limited to, approval concerning the inspection of cleared areas and benches to receive fill, and the compaction of fills. When the city has cause to believe that geologic factors may be involved the grading operation will be required to conform to "engineered grading" requirements. (5) Notification if noncompliance. If, in the course of fulfilling his responsibility under this chapter, the designer, the soils engineer, the engineering geologist or the testing agency finds that the work is not being done in conformance with this ordinance or the reviewed grading plans, the discrepancies shall be reported immediately in writing to the person in charge of grading work and to the city. Recommendations for corrective measures, if necessary, shall be submitted. (6) Transfer if responsibility jOr approvaL If the designer, the soils engineer, the engineering geologist or the testing agency of record is changed during the course of the work, the work shall be stopped until the replacement has agreed to accept the responsibility within the area of his technical competence for approval upon completion of the work. Q. Completion of work. (1) Final reports. Upon completion of the rough grading work and at the fmal completion of the work the city may require the following reports, drawings and supplements thereto: a. An as-graded grading plan prepared by the designer including original ground surface elevations, as-graded ground surface elevations, lot drainage patterns and locations and elevations of all surface and subsurface drainage facilities. The designer shall state that to the best of his knowledge the work was done in accordance with the final reviewed grading plan. b. A soils-grading report prepared by the soils engineer, including locations and elevations of field density tests, summaries of field and laboratory tests and other substantiating data and comments on any changes made during grading and their effect on the recommendations made in the soils engineering 13 investigation report. The soil engineer shall render a finding as to the adequacy of the site for the intended use. c. A geologic grading report prepared by the engineering geologist, including a final description of the geology of the site and any new information disclosed during the grading and the effect of same on recommendations incorporated in the approved grading plan. The geologic engineer shall render a finding as to the adequacy of the site for the intended use as affected by geologic factors. (2) Notification of completion. The permittee or his agent shall notify the city when the grading operation is ready for final inspection. Final approval shall not be given until all work, including installation of all drainage facilities and their protective devices, and all erosion-conttol measures, has been completed and turf has been established in accordance with the final reviewed grading plan and the required reports have been submitted. Reference nuisance language. R. Penalty. Any person convicted of violating this chapter shall be guilty of a misdemeanor and shall be subject to a fine or iruprisonment in the county jail, or both, as specified by state statute. Such penalty may be iruposed in addition to suspension or revocation of the grading permit. Section 3. This ordinance shall take effect upon adoption as provided by law. Passed and adopted this 18" day of June 2007 by the City Council of the City of Elk River. Stephanie A. Klinzing, Mayor ArrEST: Tina Allard, City Clerk 14 RESOLUTION 07-_ A RESOLUTION OF THE CITY OF ELK RIVER A RESOLUTION APPROVING NOTICE OF SUMMARY PUBLICATION OF ORDINANCE #07-_ AN ORDINANCE REPEALING ALL OF EXISTING SECTION 30.416- EROSION AND SEDIMENT CONTROL, OF THE ELK RIVER MUNICIPAL CODE, AND ADOPTING A NEW SECTION 30-416 OF THE ELK RIVER MUNICIPAL CODE, EXCAVATION, GRADING, AND EROSION CONTROL WHEREAS, on June 18, 2007 the Elk River City Council adopted Ordinance 07-_ Repealing Existing Section 30-416, Erosion and Sediment Control, of the Elk River Municipal Code, and Adopting a New Section 30-416 of the Elk River Municipal Code, Excavation, Grading, and Erosion Control; and WHEREAS, new Section 30-416 sets forth rules and regulations to control excavation, grading and earthwork construction, including fills and embanktnen ts; establishes the administrative procedure for issuance of permits; and provides for review of plans and inspection of grading construction; and WHEREAS, a copy of the full text of the ordinance amending Section 30-416 of the Elk River Municipal Code is available for inspection by any person at the office of the Elk River City Clerk, 13065 Orono Parkway, during regular business hours - 8:00 a.m. to 4:30 p.m., Monday through Friday. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Elk River, by ar least four-fifths vore, authorizes the publication of the title and summary of Ordinance 07-_ and that Ordinance 07-_ shall become effective upon adoption as provided by law. Passed and adopted this 18'" day of June 2007. Stephanie Klinzing, Mayor ATTEST: Tina Allard, City Clerk ORDINANCE 07- CITY OF ELK RIVER AN ORDINANCE OF THE CITY OF ELK RIVER ADDING ARTICLE V II, STORM WATER MANAGEMENT, TO CHAPTER 30 OF THE ELK RIVER MUNICIPAL CODE Section I. Chapter 30 of the Elk River Municipal Code is hereby amended to add thereto Article VII, as follows: ARTICLE VII. STORM WATER MANAGEMENT Sec. 30-2172. Generally. (a) The purpose of this division is to set forth minimum requirements for storm water management to diminish threats to public health, safety, public and private property and natural resources of the community by establishing standards that will: 1. Protect life and property from dangers associated with flooding; 2. Protect public and private property from damage resulting from runoff or erosion; 3. Ensure site design minimizes the generation of storm water and maximizes pervious areas for storm water treatment; 4. Promote regional storm water management by watershed; 5. Protect, maintain and/ or restore water quality from nutrients, pathogens, toxics and debris; 6. Promote infiltration and groundwater recharge; 7. Achieve a sixty (60) percent reduction in phosphorus load rates to waters compared to no controls for all new development, and a mean of forty (40) percent reduction in phosphorus load for redevelopment areas that do not currently meet the sixty (60) percent reduction standard and for street reconstruction where practicable. (b) No person shall develop any land for residential, commercial, industrial, or institutional uses without having provided the storm water management measures set forth herein to control or manage runoff from such development. All water entering the storm drain system generated on any developed and undeveloped lands, unless explicitly exempted by the city, shall be protected from illegal disposal/discharge and illegal connections. Section 30-2173. Definitions. Unless specifically defined below, the words or phrases used in this ordinance shall have the same meaning as they have in common usage. When not inconsistent with the context, words used in the present tense include the future tense, words in the plural number include the singular number, 1 and words in the singular number include the plural number. The words "shall" and "must" are always mandatory and not merely directive. Applicant means any person or entity that applies for a building permit, subdivision approval, or a permit to allow land-disturbing activities. Applicant also means that person's agents, employees, and others acting under this person's direction. Best Management Practices (EMP's) means erosion and sediment control and water quality management practices that are the most effective and practicable means of controlling, preventing, and minimizing the degradation of surface water, including construction-phasing, minimizing the length of time soil areas are exposed, prohibitions, and other management practices published by state or designated area-wide planning agencies. (Examples of BMP's can be found in the current versions of the Minnesota Pollution Control Agency's publications, "Protecting Water Quality in Urban Areas," and, "Storm-Water and Wedands: Planning and Evaluation Guidelines for Addressing Potential Impacts of Urban Storm-Water and Snow-Melt Runoff on Wedands," the United States Environmental Protection Agency's, "Storm Water Management for Construction Activities: Developing Pollution Prevention Plans and Best Management Practices," (as a reference for BMP's) and the Minnesota Department of Transportation's, "Erosion Control Design ManuaL") Buffer means a protective vegetated zone located adjacent to a natural resource, such as a water of the state, that is subject to direct or indirect human alteration. Such a buffer strip is an integral part of protecting an aquatic ecosystem through filtering, pollutants and providing adjacent habitat. The width of a buffer strip is the width along each bank of a stream. Therefore, a 30-foot wide stream with 100 foot buffer strips has a total width of 230 feet. Acceptable buffer vegetation includes preserving existing predevelopment vegetation and/ or planting locally distributed native Minnesota trees, shrubs and grassy vegetation. Alteration of buffers is stricdy limited. Buffer areas are designated with permanent markers. Developer means a person, firm, corporation, sole proprietorship, partnership, state agency, or political subdivision thereof engaged in a land disturbance activity. Discharge means the release, conveyance, channeling, runoff, or drainage, of storm water, including snowmelt, from a construction site. Energy Dissipation means the methods employed at pipe oudets to prevent erosion. Examples include, but are not limited to; aprons, riprap, splash pads, and gabions that are designed to prevent erosion. Erosion means any process that wears away the surface of the land by the action of water, wind, ice, or gravity. Erosion can be accelerated by the activities of people and nature. Erosion Control Refers to methods employed to prevent erosion. Examples include soil stabilization practices, horizontal slope grading, temporary or permanent cover, and construction phasing. 2 Erosion and Sediment Practice Specifications or Practice means the management procedures, techniques, and methods to control soil erosion and sedimentation as officially adopted by either the state, county, city or local watershed group, whichever is more stringent. Exposed SoilAreasmeans all areas of the construction site where the vegetation (trees, shrubs, brush, grasses, etc.) or impervious surface has been removed, thus rendering the soil more prone to erosion. This includes topsoil stockpile areas; borrow areas and disposal areas within the construction site. It does not include stockpiles or surcharge areas of gravel, concrete or bituminous. Once soil is exposed it is considered "exposed soil," until it meets the definition of "final stabilization." Filter Strips means a vegetated section of land designed to treat runoff as overland sheet flow. They may be designed in any natural vegetated form from a grassy meadow to a small forest. Their dense vegetated cover facilitates pollutant removal and infiltration. rznal Stabilization means that all soil disturbing activities at the site have been completed, and that a uniform perennial vegetative cover with a density of seventy-five (75) percent of the cover for unpaved areas and areas not covered by permanent structures has been established, or equivalent permanent stabilization measures have been employed. Simply sowing grass seed is not considered final stabilization. (Examples of vegetative cover practices can be found in the current version of the Minnesota Department of Transportation's publication, "Supplemental Specifications to the (year of the latest update) Standard Specifications for Construction.") Hydric Soils means soils that are saturated, flooded, or ponded long enough during the growing season to develop anaerobic conditions in the upper part. Hydrophytic Vegetation means Macrophytic (large enough to be observed by the naked eye)_plant life growing in water, soil or on a substrate that is at least periodically deficient in oxygen as a result of excessive water content. Impervious S uiface means a constructed hard surface that either prevents or retards the entry of water into the soil, and causes water to run off the surface in greater quantities and at an increased rate of flow than existed prior to development. Examples include rooftops, sidewalks, patios, driveways, parking lots, storage areas, and concrete, asphalt, or gravel roads. Land Disturbance Activity means any land change that may result in soil erosion from water or wind and the movement of sediments into or upon waters or lands within this government's jurisdiction, including clearing & grubbing, grading, excavating, transporting and filling of land. Within the context of this rule, land disturbance activity does not mean: A. Individual home gardens, minor landscaping, repairs, and maintenance work. B. Construction, installation, and maintenance of fences, signs, posts, poles, and electric, telephone, cable television, utility lines or individual service connections to these utilities, which result in creating under five thousand (5,000) square feet of exposed soil. 3 C. Tilling, planting, or harvesting of agricultural, horticultural, or silvicultural (forestry) crops. D. Emergency work to protect life, limb, or property and emergency repairs, unless the Land Disturbing Activity would have otherwise required an approved erosion and sediment control plans, except for the emergency. If such a plan would have been required, then the disturbed land area shall be shaped and stabilized in accordance with the city's requirements as soon as possible. Native Vegetation means the presettlement group of plant species native to the local region, that were not introduced as a result of European settlement or subsequent human introduction. Ordinary High Water Mark means the boundary elevation where the vegetation changes from predominately aquatic (Where "aquatic" broadly means that the vegetation can survive moist conditions.) to terrestrial. This elevation delineates the highest water level, which has been maintained for a sufficient period of time to leave evidence upon the landscape, commonly that point where the natural vegetation changes from predominantly aquatic to predominantly terrestriaL Water often reaches this elevation in spring. For rivers and streams the ordinary high water mark is usually the top of the bank. It is less well defined for lakes and wetlands. The definition in Minnesota Statute 103G.005, subdivision 14 says that the" . . . "Ordinary high water level" means the boundary of waterbasins, watercourses, public waters, and public waters wetlands, and: 1. the ordinary high water level is an elevation delineating the highest water level that has been maintained for a sufficient period of time to leave evidence upon the landscape, commonly the point where the natural vegetation changes from predominantly aquatic to predominantly terrestrial; 2. for watercourses, the ordinary high water level is the elevation of the top of the bank of the channel; and 3. for reservoirs and flowages, the ordinary high water level is the operating elevation of the normal summer pool. The term "ordinary high water mark" is further defined in Minnesota Rule 6120.2500, subpart 11. The Minnesota Department of Natural Resources' area hydrologist determines ordinary high water marks. Paved Surface means a constructed hard, smooth surface made of asphalt, concrete or other pavement material. Examples include, but are not limited to, roads, sidewalks, driveways and parking lots. Permanent Cover means "final stabilization." Examples include grass, gravel, asphalt, and concrete. See also the definition of "final stabilization." Receiving waters means the water where the discharge goes 4 Sanitary waste facility means all property, real or personal, including negative and positive easements and water and air rights, which is or may be needed or useful for the processing or disposal of waste, except property for the collection of the waste and property used primarily for the manufacture of scrap metal or paper. Waste facility includes but is not limited to transfer stations, processing facilities, and disposal sites and facilities. Sediment means the product of an erosion process; solid material both mineral and organic, that is in suspension, is being transported, or has been moved by water, wind, or ice, and has come to rest on the earth's surface either above or below water level. Sedimentation means the process or action of depositing sediment. Sediment Control means the methods employed to prevent sediment from leaving the development site. Sediment control practices include silt fences, sediment traps, earth dikes, drainage swales, check dams, subsurface drains, pipe slope drains, storm drain inlet protection, and temporary or permanent sedimentation basins. Soil means the unconsolidated mineral and organic material on the immediate surface of the earth. For the purposes of this document stockpile of gravel, aggregate, concrete or bituminous materials are not considered "soil" stockpiles. Stabilized means the exposed ground surface after sod, erosion control blanket, riprap, or other material that prevents erosion has covered it. Simply sowing grass seed is not considered stabilization. Storm Water under Minnesota Rule 7077.0105, subpart 41b storm water, "means precipitation runoff, storm water runoff, snow melt runoff, and any other surface runoff and drainage." (According to the Federal Code of Regulations under 40 CFR 122.26 [b][13], "Storm water means storm water runoff, snow melt runoff and surface and drainage."). Storm water does not include construction site dewatering. Storm Water Pollution Control Plan means a joint storm water and erosion and sediment control plan that is a document containing the requirements of Section 4 of the NPDES permit, that when implemented will decrease soil erosion on a parcel of land and off-site nonpoint pollution. It involves both temporary and permanent controls. Structure means anything manufactured, constructed or erected, which is normally attached to or positioned on land, including portable structures, earthen structures, roads, parking lots, and paved storage areas. Subdivision means any tract of land divided into building lots for private, public, commercial, industrial, etc. development. Minnesota Rule 6120.2500, subpart 17 defines subdivision as, " . . . land that is divided for the purpose of sale, rent, or lease, including planned unit development." Temporary Protection means short-term methods employed to prevent erosion. Examples of such protection include: straw, mulch, erosion control blankets, wood chips, and erosion netting. 5 Vegetated or Grassy Swales means a vegetated earthen channel that conveys storm water, while treating the storm water by bioflitration. Such swales remove pollutants by both filtration and inflitration. Waters of the State As defined in J\1innesota Statutes section 115.01, subdivision 22 the term ". . . "waters of the state" means all streams, lakes, ponds, marshes, watercourses, waterways, wells, springs, reservoirs, aquifers, irrigation systems, drainage systems and all other bodies or accumulations of water, surface or underground, natural or artificial, public or private, which are contained within, flow through, or border upon the state or any portion thereof." Wet Detention Facility means a permanent man-made structure, containing a permanent pool of water, used for the temporary storage of runoff. Wet Retention Facility The same as a wet detention facility. Wetlands As defined in Minnesota Rules 7050.0130, subpart F, " . . . "wetlands" are those areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Constructed wetlands designed for wastewater treatment are not waters of the state. Wetlands must have the following attributes: A. A predominance of hydric soils; B. Inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of hydrophytic vegetation typically adapted for life in a saturated soil condition; and C. Under normal circumstances support a prevalence of such vegetation. Sec. 30-2174. Storm Water and Urban Runoff Control. (a) Illegal disposal/ dumping 1. No person shall throw, deposit, place, leave, maintain, or keep any substance upon any street, alley, sidewalk, storm drain, inlet, catch basin conduit or drainage structure, business place, or upon any public or private plot of land, so that the substance might be or become a pollutant, except in containers, recycling bags, or other lawfully established waste disposal facility. 2. No person shall intentionally dispose of grass, leaves, ditt, or landscape material into a water resource, buffer, street, road, alley, catch basin, culvert, curb, gutter, inlet, ditch, natural watercourse, flood control channel, canal, storm drain or any fabricated natural conveyance. (b) Illicit discharges and connections 1. No person shall cause any illicit discharge to enter the storm sewer system or any surface water uuless such discharge: 6 a. consists of non-storm water that is authorized by an NPDES point source permit obtained from the MPCA; or b. is associated with fire fighting activities or other activities necessary to protect public health and safety; or c. is one of the following exempr discharges: water line flushing or other potable water sources, landscape irrigation or lawn watering, diverted stream flows, rising ground water, ground water infiltration to storm drains, uncontaminated pumped ground water, foundation or footing drains (not including active groundwater dewatering systems), crawl space pumps, air conditioning condensation, springs, non-commercial washing of vehicles, natural riparian habitat or wetland flows, dechlorinated swimming pools and any other water source not containing pollutant. 2. Dye testing is an allowable discharge, but requires a verbal notification to the city prior to the time of the test. 3. No person shall use any illicit connection to convey non-storm water to the city's storm sewer system. 4. The construction, use, maintenance or continued existence of illicit connections to the storm sewer system is prohibited. This prohibition expressly includes, without limitation; illicit connections made in the past, regardless of whether the connection was permissible under law or practices applicable or prevailing at the time of connection. 5. A person is considered to be in violation of this ordinance if the person connects a line conveying sewage to the storm sewer system, or allows such a connection to continue. (c) Good housekeeping provisions. Any owner or occupanr of property within the city shall comply with the following good housekeeping requirements: 1. No person shall leave, deposit, discharge, dump, or otherwise expose any chemical or septic waste in an area where discharge to streets or storm sewer system may occur. This section shall apply to both actual and potential discharges. a. Septic systems must be maintained to prevent failure. b. No part of any individual septic system requiring on-land or in ground disposal of waste shall be located closer than one hundred fifty (150) feet from the ordinary high water level in the case of DNR protected waters, or twenty-five (25) feet from the wetland boundary in the case of all other water bodies, unless it is proven by the applicant that no effluent will immediately 7 or gradually reach the water bodies because of existing physical characteristics of the site or the system. c. Recreational vehicle sewage shall be disposed of at a proper sanitary waste facility. Waste should not be discharged in an area where drainage to streets or storm sewer systems may occur. d. For pools, water shall be allowed to sit seven (7) days without the addition of chlorine to allow for chlorine to evaporate before discharge. 2. Runoff of water from residential property shall be minimized to the maximum extent practicable. Runoff of water from the washing down of paved areas in commercial or industrial property is prohibited unless necessary for health or safety purposes and not in violation of any other provisions in city codes. 3. Mobile washing companies (carpet cleaning, mobile vehicle washing, etc) shall dispose of wastewater to the sanitary sewer. Wastewater shall not be discharged where drainage to streets or storm sewer systems may occur. 4. Storage of materials, machinery, and equipment a. Objects, such as motor vehicle parts, containing grease, oil or other hazardous substances, and unsealed receptacles containing hazardous materials, shall not be stored in areas susceptible to runoff. b. Any machinery or equipment that is to be repaired or maintained in areas susceptible to runoff shall be placed in a confined area to contain leaks, spills, or discharges. 5. Debris and residue shall be removed, as noted below: a. All motor vehicle parking lots and private streets shall be swept, at a minimum of once a year in the spring to remove debris. Such debris shall be collected and properly disposed. b. Fuel and chemical residue or other types of potentially harmful material, such as animal waste, garbage or batteries shall be removed as soon as possible and disposed of properly. Hazardous waste must be disposed of at an appropriate disposal site and shall not be placed in a trash container. (d) Industrial or construction activity discharges. Any person subject to an industrial or construction activity NPDES storm water discharge permit shall comply with all provisions of such permit. Proof of compliance with said permit may be required in a form acceptable to the city prior to the allowing of discharges to the storm sewer system. All facilities that have storm water discharges associated with industrial activity, including construction activity must adhere to the following guidelines: 8 1. The owner or operator of a commercial or industrial establishment shall provide, at their own expense, reasonable protection from accidental discharge of prohibited materials or other wastes into the storm sewer system or watercourses through the use of structural and non-structural BMPs. 2. Any person responsible for a property or premise, which is, the source of an illicit discharge, shall be required to implement, at said person's expense, additional structural and non-structural BMPs to prevent the further discharge of pollutants to the storm sewer system. These BMPs shall be part of a storm water pollution prevention plan (SWPPP) as necessary for compliance with requirements of the NPDES permit. (e) Construction and building site activity. Construction sites and landscaping projects are especially susceptible to erosion and pollution. For this reason, construction site operators must control waste such as discarded building materials, concrete truck washout, chemicals, petroleum products, litter, and sanitary waste at the construction site that may cause adverse impacts to water quality. The developer shall be held responsible for adherence to these required prevention and conttol measures: 1. A designated area shall be provided on site for concrete truck washout. The area shall be constructed so as to contain washout material and be located at least fifty (50) feet away from any storm drain inlet or receiving water during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 2. The guidelines below should be followed concerning debris storage and disposal: a. Daily cleanup of construction site shall be performed to ensure that all litter is contained in an appropriate enclosure or container so as not to accumulate on the ground. b. Operators must keep solid waste materials in either a container or an enclosed waste collection area. c. Empty/unused chemical containers must be disposed of in accordance with label instructions. d. Potentially hazardous waste must be separated from non-hazardous waste. e. Recycling of waste materials is encouraged when possible. f. All construction site wastes must be disposed of at authorized disposal facilities. 9 3. Rock construction entrances shall be constructed at all city-approved entrances. Construction accesses not approved by the city should be adequately blocked to prevent unwanted traffic. a. Site access roads shall be graded or otherwise protected with silt fences, diversion channels, or dikes and pipes to prevent sediment from exiting the site via the access roads. b. Individual lots shall each be required to install and maintain a rock construction entrance throughout building construction until a dust free access has been installed. 4. Sanitary waste facilities shall be provided on site and be located as far from storm sewer inlets and receiving waters as practical on the construction site. 5. Chemicals, paint, petroleum, fertilizer, and pesticides must be stored in a covered enclosure and as far from receiving waters as practical on the construction site. (f) Notification of spills. Not withstanding other requirements of law, as soon as any person responsible for a facility or operation, or responsible for emergency response for a facility or operation has information of any known or suspected release of materials which are resulting or may result in illegal discharges or pollutants discharging into the storm sewer system, or water of the state said person shall take all necessary steps to ensure the discovery, containment, and cleanup of such release. In the event of such a release of hazardous materials said person shall immediately notify emergency response agencies of the occurrence via emergency dispatch services. In the event of a release of non-hazardous materials, said person shall notify the city no later than the next business day. (gJ Access to buildings for inspection, monitoring and/ or dye testing. 1. The city shall be permitted to enter and inspect all buildings under this ordinance as often as may be necessary to determine compliance with this ordinance. 2. Facility operators shall allow the city ready access to all parts of the premises for the purposes of inspection, sampling, dye testing, examination and copying of records that relate to the discharge of storm water. 3. The city shall have the right to set up at any building such devices as are necessary to conduct monitoring, sampling and/ or dye testing of the facility's storm water discharge. 4. The city has the right to require the discharger to install monitoring equipment as necessary. 5. Unreasonable delays in allowing the city access to a facility is a violation of this ordinance. 10 6. If the city has been refused access to any part of the premises from which storm water is discharged, and is able to demonstrate probable cause to believe that there may be a violation of this section, or that there is a need to inspect and/ or sample as part of a routine inspection and sampling program designed to verify compliance with this ordinance or any order issued hereunder, or to protect the overall public health, safety, and welfare of the community, then the city may seek issuance of a search warrant from any court of competent jurisdiction. (h) Suspension of storm sewer system access. 1. Suspension due to illicit discharges in emergency situations The city may, without prior notice, suspend storm sewer system discharge access to a person when such suspension is necessary to stop an actual or threatened discharge which presents or may present imminent and substantial danger to the environment, or to the health or welfare of persons, or to the storm sewer system or waters of the state. If the violator fails to comply with a suspension order issued in an emergency, the city may take such steps as deemed necessary to prevent or minimize damage to the storm sewer system or waters of the state, or to minimize danger to persons. 2. Suspension due to the detection of illicit discharge Any person discharging to the storm sewer system in violation of this ordinance may have their storm sewer system access terminated if such termination would abate or reduce an illicit discharge. A person commits an offense if the person reinstates storm sewer system access to premises terminated pursuant to this section, without the prior approval of the city. Sec. 30-2175. Post Construction Storm Water Management. The purpose of this section is to comply with the State's goal of obtaining a pollutant loading water quality model that will provide, at minimurn, changes in Average Annual Flow V olurne, Total Suspended Solids, and Phosphorus. This modeling will be based on two time periods: from 1988 (1988-1990) to the present (2000-2005), and from the present to 2020 or ultimate development, whichever will occur first. (a) The applicant shall consider reducing the need for storm water management performance standards by incorporating the use of natural topography and land cover. It shall also: 1. Minimize impact to significant natural features. 2. Review the site for wetlands, wooded areas of significance, rare and endangered species habitat, areas designated by the County Biological Survey (1993), and/or Elk River Natural Resource Inventory (NRI) (December 2004). These areas should not be developed. 11 3. Minimize impervious surface coverage to the maximum extent practicable. 4. In designated shoreland areas the development shall meet the impervious surface requirements of the Shoreland Ordinance regardless of conveyance systems. 5. Have a proposed design, suggested location and phased implementation of effective, practicable storm water management measures for plans designed, engineered and implemented to achieve the following results: a. Volume control Designer shall be tequired to provide soil boring analysis to determine the infiltration rate ptior to approval of plans. b. Phosphorus control Storm water shall be treated to remove sixty (60) percent of the post- development phosphorus load on an annual basis before discharge to natural water bodies. 'Where water quality ponding is exclusively used to meet the phosphorus removal requirement, the ponds must be sized to store the site runoff from a two and one-half (2.5) inch rainfall below the normal oudet elevation. c. Total Suspended Solids Treatment also must achieve a sixty (60) percent removal of suspended solids. d. Oil and wease control For all storm water plans for commercial or industrial developments and all other uses where the potential for pollution by oil or grease, or both, exists, the first one-half (0.5) inch of runoff will be treated using the best oil and grease removal technology available. This requirement may be waived by the city when the applicant can demonstrate that installation of such practices is not necessary. e. Runoff rate control Refer to city's design standards. (b) All storm water facilities shall be designed, installed and maintained to effectively accomplish the following: 1. Minimize predevelopment peak runoff rates for the two (2) year, twenty-four (24) hour storm event. 2. Minimize predevelopment peak runoff rates for the ten (10) year, twenty-four (24) hour storm event. At a minimum, the storm sewer system shall be designed for this storm event. Low areas must have an acceptable overland drainage route with the proper transfer capacity when the event is exceeded. 3. Minimize predevelopment peak runoff rates for the one hundred (100) year, twenty-four (24) hour storm event. 12 (c) Oudets. Discharges from new construction sites must have a stable oudet capable of carrying designed flow at a non-erosive velocity. Oudet design must consider flow capacity and flow duration. TIlls requirement applies to both the site oudet and the ultimate oudet to the storm sewer system or waterbody. Measures to trap floatables for energy dissipation must also be constructed. (d) Minimize impervious surface area and maximize infiltration. Where ditected by the city and based on site feasibility, projects shall use existing natural drainage ways and vegetated soil surfaces to convey, store, filter, and retain storm water runoff before discharge into public waters or a storm sewer system (permanent pool areas of wet ponds tend to lose infiltration capacity and will not be accepted as an inf11tration practice). The applicant shall attempt to limit the impervious surface of the developed site or subdivision by incorporating the following design considerations, consistent with zoning, subdivision, and PUD requirements: 1. Natural vegetation preserved wherever practical 2. Narrowing street widths 3. Reducing parking lot space 4. Sidewalk locations 5. Reducing setbacks and driveways 6. Maximizing open space while incorporating smaller lot sizes to conserve natural areas and reduce the amount of storm water runoff generated at the site 7. Using landscaping and soils to treat and inf11trate storm water runoff 8. E1iminate curb and gutrer where practicable, and use vegetated swales or equivalent 9. Look for vegetated areas that can fllter sheet flow, removing sediment and other pollutants, and increasing the time of concentration 10. Disconnect impervious areas by allowing runoff from small impervious areas to be ditected to pervious areas where it can be infiltrated or filtered 11. All runoff from downspouts, driveways and other impervious areas shall be ditected to pervious surfaces, where feasible, or unless the applicant can demonstrate that the practice is likely to result in groundwater contamination 12. Increase buffers around streams, steep slopes, and wedands to protect from flood damage and provide additional water quality treatment 13 13. Use shared parking facilities consistent with zoning requirements 14. Install semi-permeable/permeable or porous paving. (e) Pond requirements. For all projects creating more than one acre of impervious surface, ponding shall be required. At a minimum all pond design specifications shall conform to the city's Engineering Design Standards and the current requirements found in the NPDES construction permit. (f) Regional ponding. If the city determines the site is not suitable for on-site ponding, off-site storm water management and associated fees may be established, provided that provisions are made to manage storm water by an off-site facility, and provided that all of the following conditions for the off-site facility are met: 1. The facility is in place or the city has knowledge of future regional ponding on site; 2. The facility is designed and adequately sized to provide a level of storm water control that at least meets the ordinance standards 3. The city is satisfied that the facility has a legally obligated entity responsible for its long-term operation and maintenance. (g) Accepted alternative storm water treatments. Alternative storm water treatments, including but not limited to rain gardens and infiltration basins, may be installed. and shall be reviewed and approved by the city. (h) Maintenance of private storm water facilities. All private storm water facilities shall be maintained by the owner in proper condition consistent with the performance standards for which they were originally designed. 1. All setded materials from sumps, grit chambers, and other devices, including setded solids, shall be removed and properly disposed of on an annual basis. One (1) to five (5) year waivers from this requirement may be granted by the city when the owner presents evidence that the facility has additional capacity to remove setded solids in accordance with the original design capacity. 2. Ponds shall be inspected at least once every five (5) years to determine if setded materials should be removed. Setded materials shall be removed and properly disposed of when the pond is no longer functioning at the original design capacity. 3. When requested by the city, a maintenance plan must be provided that defines who will conduct the maintenance, the type of maintenance and the maintenance intervals of a private storm water facility before the facility is approved. 14 4. All storm water facilities must be designed to minimize the need for maintenance, to provide easy vehicle and personnel access for maintenance purposes, and be sttuctutally sound. It shall be the responsibility of the applicant to obtain any necessary easements or other property interests to allow access to the facilities for inspection or maintenance. 5. The city shall have the right to request and review inspection and maintenance records and shall have the right to perform an inspection of storm water facilities at any time if the city has probable cause to believe that the facilities are not being properly maintained or inspected. Section 30-2176. Enforcement. Notice of Violation. 1. Upon discovering that a person has violated a prohibition or failed to meet a requitement of this section, under the provisions of this article the city administrator or designee shall serve a notice upon the owner of the property upon which the nuisance exists. Such notice shall be given by certified mail at the last known address as shown on the property tax records of the county. Such notice shall advise that a nuisance exists and requite the property owner to abate the nuisance within a reasonable time, as established by the city administrator or designee and stated in the notice. Such time shall not be less than 14 days. Such notice may requite without limitation: a. The performance of monitoring, analyses, and reporting; b. The elimination of illicit connections or discharges; c. That violating discharges, practices, or operations shall cease and desist; d. The abatement or remediation of storm water pollution or contamination hazards and the restoration of any affected property; and e. Payment of a fine to cover administrative and remediation costs; and f. The implementation of source control or treatment BMPs. 2. Such notice shall also advise the property owner of the right to request a heating before the city administrator or designee to contest the contents of the notice. 3. If requested by the person upon whom the notice is served under subsection (a) of this section, a heating before the city administrator or designee shall be held at which the person may contest the contents of the notice. The request for such a heating must be made within five days after receipt of the notice provided for in subsection (a) of this section. After such hearing the city administrator or designee may affirm the notice, modify the notice or quash the notice. 15 4. If the property owner does not abate the nuisance as required by the notice provided for in subsection (a) of this section and has not requested a hearing before the city administrator or designee under subsection (b) of this section, authorized agents of the city shall abate the nuisance. The cost of such abatement shall be collected as a special assessment against the property upon which the nuisance was located. 5. If the property owner requests a hearing before the city administrator or designee under subsection (b) of this section, no abatement actions shall be taken until the hearing is held. If after the hearing the city administrator or designee affirms or modifies the notice and the nuisance is not abated as provided in the notice as affirmed or modified, authorized agents of the city shall abate the nuisance. The cost of such abatement shall be collected as a special assessment against the property upon which the nuisance was located. 6. Nothing in this section prevents abatement by the city of a public nuisance without notice and hearing in the case of an emergency in which there is an immediate and direct threat to the public health or safety. The expense of such an emergency abatement shall be collected as a special assessment against the property upon which the nuisance was located. Passed and adopted this 18'h day of June 2007, by the City Council of the City of Elk River. This ordinance shall take effect upon publication as provided by law. Stephauie Klinzing, Mayor ATTEST: Tina Allard, City Clerk 16 RESOLUTION 07-_ A RESOLUTION OF THE CITY OF ELK RIVER A RESOLUTION APPROVING NOTICE OF SUMMARY PUBLICATION OF ORDINANCE # 07-_ ADDING ARTICLE VII, STORM WATER MANAGEMENT, TO CHAPTER 30 OF THE ELK RIVER MUNICIPAL CODE WHEREAS, onJune 18,2007 the Elk River City Council adopted Ordinance # 07-_ adding Article VII, Storm Water Management, to Chapter 30 of the City of Elk River Municipal Code of Ordinances; and WHEREAS, the purpose of the ordinance is to set forth minimum requirements for storm water management to diminish threats to public health, safety, public and private property and natural resources of the cormnunity by establishing standards that will: Protect life and property from dangers associated with flooding; Protect public and private property from damage resulting from runoff or erosion; Ensure site design minimizes the generation of storm water and maximizes pervious areas for storm water treatment; Promote regional storm water management by watershed; Protect, maintain and/ or restore water quality from nutrients, pathogens, toxics and debris; Promote infiltration and groundwater recharge; Achieve a sixty (60) percent reduction in phosphorus load rates to waters compared to no controls for all new development, and a mean of forty (40) percent reduction in phosphorus load for redevelopment areas that do not currently meet the sixty (60) percent reduction standard and for street reconstruction where practicable; and WHEREAS, the Stormwater Management Ordinance provides that person shall develop any land for residential, cormnercial, industrial, or institutional uses without having the provided storm water management measures set forth in the ordinance to control or manage runoff from such developments; and WHEREAS, a copy of the full text of the Storm Water Management Ordinance is available for inspection by any person at the office of the Elk River City Clerk, 13065 Orono Parkway, during regular business hours - 8:00 a.m. to 4:30 p.m., Monday through Friday. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Elk River, by at least four-fifths vote, authorizes the publication of the title and summary of Ordinance 07-_ and that Ordinance 07-_ shall become effective upon adoption as provided by law. Passed and adopted this 18th day of June, 2007. S:\Resolutions\2007 Resolutions\Unapproved\Summary Ord Storm Water.doc ATTEST: Tina Allard, City Clerk Stephanie Klinzing, Mayor S:\Resolutiom\2007 Resolutions\Unapproved\Summary Ord Storm Water. doc