Loading...
6.6. SR 06-18-2007 REQUEST FOR ACTION To Ci Council Agenda Section Communi Develo ment Item Description Request by Riverside Companies for Interim Use Permit for Spectrum High School, Case No. CU 07-13 - Public Hearing Meeting Date une 18, 2007 Item Number 6.6. Prepared by erem Barnhart, Plannin Reviewed by Scott Clark, Community Development Director Reviewed by Action Requested Approval for an interim use permit, as illustrated on drawings dated 6/6/2007, with the following conditions: 1. All comments of the City Engineer's memo dated June 7, 2007 shall be addressed. 2. All comments and conditions of the Sherburne County memo dated May 11, 2007 shall be addressed. 3. The development of the site shall meet all applicable fire codes. The Fire Chief shall verify the location of all fire hydrants, and may require additional hydrants necessary to preserve the health and safety of the residents. 4. A wetland buffer of 25 feet apply to all wetlands and a structure setback of 20 feet from the buffer applies. 5. A NPDES permit is required prior to construction. 6. A letter of credit in the amount of 100% of the cost of the landscape, site stabilization improvements, to a maximum of $50,000 shall be submitted prior to the releasing of the Building permit. 7. Interim Use Permit shall expire on July 1, 2010. Background/Discussion Spectrum High School received an interim use permit in 2006 allowing the school to operate at the Elk River Boy and Girls Club until 2010. The Spectrum High School enrollment has increased faster than anticipated, causing them to outgrow the Boys and Girls site. The applicant seeks an interim use permit to operate their school in modular buildings on site of their anticipated permanent home. The modular units will be used to continue to grow the enrollment, allowing them to use other funding mechanisms to finance the permanent structure. The interim use permit is requested for 3 years until July 1,2010. The City Council reviewed the proposal as a concept at the May workshop meeting. Case File: CD 07-13 Page 2 Spectrum High School Riverside Companies Financial Impact N/A Attachments . Location Map . Memo from City Engineer dated June 7, 2007 . Memo from Sherburne County Public Works dated May 11, 2007 . Applicant's Narrative . Site Plan dated June 6, 2007 . Architecturall)ravving General Information Applicant 60 Day Rule Requested Action location and Size Riverside Companies The application has been deemed complete as of Apri130, 2007. The City must take action by June 30, 2007. Interim Use approval, to July 1,2010 Approximately 40 acres north of Co Rd 12, south of Trott Brook. location Existing Use land Use Plan Designation Current Zoning Subject Ag Urban Residential R-1d Property North Ag Urban Residential R-1d South Tovvnhomes Urban Residential R-3 East Ag Urban Residential R-1d West Ag Urban Residential R-1d Overview Spectrum High School, as part of their interim use permit, vvishes to construct a 10,500 square foot temporary modular building for classrooms, offices, and common areas. The building vvill be located to the north of a proposed parking lot, and northvvest of the future proposed high school. The parking lot vvill be eventually converted as bus and staff parking. Applicable Regulations Conditional Use Permit The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: C: \Documents and Settings \jmiller\Local Settings \ Temporary Internet Files \ OLK3E\Staff report CC 6-18-07.doc Case File: CD 07-13 Page 3 Spectrum High School Riverside Companies 1. Will not endanger, i,!jure or detrimentallY qffect the use and etyqyment if other properry in the immediate viciniry or the public health, sqfery, morals, comfort, convenience or general we!fare if the neighborhood or the ciry. 2. Will be consistent with the comprehensive plan. 3. Will not impede the normal and orderlY development and improvement if surrounding vacant properry. 4. Will be served adequatelY fry and will not adverselY qffect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer !)1st ems, parks and schools; and will not, in particular, create trqjjic congestion or interference with trqjjic on acljacent and neighboring public thoroughfares. 5. Will not involve uses, activities, processes, materials, equipment and conditions if operation that will be detrimental to a'!Y persons or properry because if excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations. 6. Will not result in the destruction, loss or damage if a natural, scenic or historic feature if mqjor importance. 7. Will fullY complY with all other requirements if this Code, including a'!Y applicable requirements and standards for the issuance if a license or permit to establish and operate the proposed use in the ciry. If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. In the review of the standards for CUP as outlined, it appears that the request is consistent with all of these standards. Analysis Staff has been working with the applicant for the last several months, to identify and resolve any issues discovered during the review: Safety During the concept review by the City Council and at the staff level site plan review, it was noted that during a case of severe weather, there is no place for occupants to go. In other, previously approved modular building applications, there has always been a permanent structure for this need. To address this concern, the proposal includes the construction of a 70 x 40 concrete block building east of the modular building. Natural Resources Wetlands - There are no wetlands or wetland buffers proposed to be impacted with this interim use permit. Floodplain - The floodplain for Trott Brook is adjacent to the development, but no grade changes are proposed that would impact or otherwise alter this floodplain. Transportation Access to the site will be via a single access off of County Road 12. The County has expressed concern with this access, and would prefer it line up with Johnson street, about 360 feet to the west. The County has also suggested a turn lane for left turning traffic entering the school. Co \Documents and Settings \jrniller\Local Settings\ Temporary Internet Files\OLK3E\Staff report CC 6-18-07.doc Case File: CD 07-13 Page 4 Spectrum High School Riverside Companies Staff, the applicant, and the county have been working together on the resolution of this issue. The challenge with shifting the access to the west (lining up with Johnson street) is that the applicant does not yet have control over that land. It has been suggested that a temporary access be permitted as shown, and the permanent access, when the enrollment and traffic turning into the site increase. Additionally, the bypass/ turn lane would be built with the permanent access, again because the traffic will increase at that point. The applicant would be required to attain a permit from the County regarding the access. Utilities Water - City water and sewer will serve the site. Much of these service connections will be used for the permanent building. Storm Sewer/water - Storm water falling on the parking lot will sheet drain to a low ditch on the west side of the property, and flow overland to a storm pond north of the modular building. Landscaping Lot Trees - Landscaping is proposed along the southern property line and throughout the site. As this is a temporary use, it is suggested that more attention to the landscaping be part of the Conditional Use Permit for the permanent building. Planning Commission Discussion The Planning Commission held a public hearing on this item at their meeting June 12,2007. There were no comments received in support or against. The Planning Commission discussed the access question, and whether a school was an appropriate use on the property. The Commission questioned if the school would impede growth of adjacent property. Staff responded that the school, city, and county continue to work together regarding the access, and supported the use of the land for a school, noted the immediate County road access, and adjacent floodplain. Recommendation Staff and the Planning Commission recommend approval of the interim use permit to July 1,2010 for the installation of 10,500 square feet of modular school space for Spectrum High School as illustrated on plans dated June 6, 2007, subject to the conditions outlined above. Respectfully Submitted Jeremy Barnhart, AICP Planning Manager Action Motion by _ Second by _ Vote Follow Up C: \Documents and Settings \jmiller\Local Settings \ Temporary Internet Files \ OLK3E\Staff report CC 6-18-07.doc o o ~ 'oj 1) ~ o 8 "- :J: ~ ~ ~ 00 " o o N ~ '" ~ ~ >: Q ~ ~ w U ~ o ~ 5 ~ ~ --- Vl M " o => ~ => !,! 11 u: " ~ '" z Z z ~ Vi L o -~-- ( ~ I Oi i ~ ~~-^ ~!~ :Cr.i !11 /i 101... Hlf,LSlDE l --..2 m__ CITY _--L1-~__ PARK I I __L Location Map 1r N Case Number: CU 07-13 SPECTRUM HIGH SCHOOL MEMORANDUM TO: Jeremy Barnhart, Planning Manager FROM: Terry Maurer, City Engineer DATE: June 7, 2007 SUBJECT: Spectrum Charter School Site Plan File #226-171 P As requested, we have reviewed the proposed site plan for the temporary and permanent development of the Spectrum Charter School. The site, as you are aware, is located on the north side of CSAH 12 just opposite Kliever Lake Fields Addition. The proposal is to eventually construct a 60,000 permanent school building with amenities on the site. The initial proposal is to construct temporary classroom facilities. I have met with the developer's engineer regarding sewer and water service. Sewer service will be accomplished by directional boring an 8-inch sewer line under CSAH 12 from the lift station located in Kliever Lake Fields. From this line, a service will be extended to service the temporary school building. This service will be available in the future to serve the permanent building. From a water standpoint, the Elk River Municipal Utilities are just completing an extension of trunk watermain along the north side of CSAH 12, looping Kliever Lake Fields Addition to the watermain on Cleveland Avenue. This newly constructed trunk watermain will provide an opportunity to extend a service directly into the temporary building, ultimately serving the permanent building. Fire hydrants will be placed as required by the Fire Chief. Initially, storm drainage will be accomplished by constructing a pond at the north of the site just outside the floodplain. Drainage to the pond will be via overland flow. An initial parking lot is proposed on the west side of the future permanent building. It is showing an access directly out onto CSAH 12. A permit will be required from Sherburne County for this access. This access would be considered temporary. When the permanent school building is constructed, given the much larger scale and additional traffic that will be generated, the access point will need to be moved westerly to line up with Johnson Street. At that time, additional improvements along CSAH 12 may be necessary for that access, based on Sherburne County conditions. If you have any questions regarding any of these issues, please contact me. S:\PLANNlNG\Case Files\CUP\CU 07-13 Spectnun\06 07 07 Engr's comments.doc 13880 Highway 10 West Elk River, MN 55330 (763) 241-7013. 800-594-5208 Sherburne County PUBLIC WORKS DEPARTMENT May 11, 2007 MAY 1 "2007 City of Elk River Attn: Jeremy Barnhart City Hall 13065 Orono Parkway Elk River, MN 55330 RE: Spectrum High School Dear Mr. Barnhart: Public Works has reviewed the proposal for locating Spectrum High School on parcel 75- 136-4300, which lies adjacent to CSAH 12. We have multiple safety and transportation concerns with regard to locating a school in this location. We offer the following comments for your consideration. The access location indicated on the drawing is unacceptable and will not be approved. Our staff agrees with Terry Maurer, City Engineer, that if approved the access should align with Johnson Street, in order to obtain approval. The access will become a future street that will allow for the development of the Anthony Froland parcels (40 Acres, half of which appears developable). A standard right turn lane must be constructed on CSAH 12 to match the existing section, at the developer's expense. The 2003 traffic volume for this segment of CSAH 12 was 6600. The projected future volume is 12,000 MDT. According to our transportation plan and the MnDOT District 3 turn lane policy (which we utilize) a full left turn lane is necessary, based on projected traffic volumes on CSAH 12 and the proposed school access. A bypass lane is inappropriate for this application and cannot be approved. Based on the projected traffic volumes a four lane section will likely be necessary for this segment of CSAH 12. If a four lane section were constructed, the left turn lane requirement could be eliminated, however these improvements are not currently included in the County's five year Capital Improvements Plan (CIP). In the meantime Public Works staff is available to discuss options for design and construction and the developers' cost participation that is deemed appropriate. If approved, this construction will require permits and fees. We do not support any proposal that does not include left turn or four lane design. Consideration for trail facilities and location will also be required. As we all know the traffic volumes are rapidly escalating within the City of Elk River. The County's first responsibility is to manage the safety and overall operations of the County road system. Whenever schools are part of the equation the concern for safety is paramount and these concerns are shared by the whole community. The County wants to work with the City and the school to address these safety concerns as part of this process. Please call if you have any questions or comments (763-241-7013). Sincerely, ~tU- Richard D. Corbin Sherburne County Public Works Cc: Edward Youngquist, Riverside Companies John Menter, Public Works Director Rhonda Lewis, County Engineer RIVERSIDE !t FILE COpy COMPANIES ....................................................... ....................................................... Riverside Development Company Pioneer Investments, LLC LC Development, LLC Phoenix Enterprises, LLC CM Points Holdings, LLC Franklin Development Inc. April 30, 2007 City of Elk River - Planning Department 13065 Orono Parkway Elk River, MN 55330 RE: SpectIum High School - Project Narrative Elk River's Spectrum High School received its Charter in 2006 and opened the doors last fall- operating out of the Boys and Girls Club of Elk River. In the first year, the Charter High School has outgrown its present facility. It isthe intention ofthe Spectrum School Board members to relocate the High School within the City of Elk River. They are interested in building a permanent facility East of Higb.way 169 on C.S.A.H. No. 12 (North side of Main St.) - between Johnson Street and Fillmore Street. Detailed site maps have ,been supplied. Spectrum Charter High School operates like any other educational facility. Hours of operation are typically 8:00 am to 3 :OOpm - with some extra curricular activity traffic. The anticipated enrollment for the 2007-2008 school year is 120-150 students. It is estimated that 25% of the enrolled students would be drivers - along with 25 staff members. The maximum enrollment is projected at 500 students for grades 8-12. An estimate of 5 0 staff members will be needed to accommodate the projected enrollment. ,The Preliminary Site Plan demonstrates meeting parking requirement for the interim as well as the permanent use. The educational use of this property staggers the traffic patterns and may relieve some peak traffic-flow time periods. The Preliminary Site Plan demonstrates how well the school pr~serves the natural features of this parcel. The property is environmentally very sensitive. The proposed school and parking area Is located closer to C.S.A.H No. 12 - away from Trott Brook. All construction is proposed outside of the current Flood Plain with no wetland mitigation needed. and minimal tree impact. The natur~'setting of the proposed school lends itself to Spectrum High School'~ strong math, and science clll1iculum. A soils report prepared by ITT dated June 16, 2000 suggests typical construction practices with spread footirigs for building fOllndations and a R - 30 pavement section (1.5/2110-7 ton and 1.5/3/12-9 ton). The subsurface water table was observed between 5 and 8 feet. Theschool can be serviced with city sewer and water. Also, small utilities such as Qwest, ERMU, Centerpoint Energy and Northstar Access can provide service to the High School. DA TERECEIVED .~gd-tr7 19230 Evans Street NW. Suite 115. Elk River, MN. 55330 Phone: 763-241-1801. Fax: 763-241-1399 RIVERSIDE !t COMPANIES .................................................................. .................................................................. Riverside Development Company Pioneer Investments, LLC . LC Development, LLC Phoenix Enterprises, LLC CM Points Holdings, LLC Franklin Development Inc. Spectrum High School needs to operate on the proposed site in a temporary Modular facility. When the enrollment reaches 285 students, bonding can be applied for and construction of the. permanent facility can commence. It is anticipated that this enrollment numbercanbe achieved in a short period oftime. There is a great need in the area - as demonstrated by the waiting list at PACT Charter School in Ramsey, Minnesota. The modular building is placed on a concrete block foundation and is recognized by the State of Minnesota as a permanent structure. The exterior of these temporary buildings can be very attractive (See sample Architect Plan). Landscaping can be incorporated as screening (See sample Landscape Plan).' The modular classrooms must comply with all local and state building codes. It is the hope of Riverside Companies and Spectrum High School that the City of Elk River will work with us to make this dream a reality. Please contact me with any questions or if additional information is needed. Thank you. Sincerely, Edward oungquist Riverside Companies 19230 Evans Street NW. Suite lIS. Elk River, MN 55330 Phone: 763-241-1801. Fax: 763-241-1399 , , ,Vi : - - - - - - - - - - - - ill:: L - - or ':' "is N~:_~~!_ -/'Ii ~------ 1 /1: : ! III : II : -I, : I I, : 1____ I I \ I, ) I, / I~--''''''' III1 'I............ 1 II' j............................ I...... I I /...... v I , I /:...............................)/ I (............../ I )"j I:" . III I II , : ----------------~-~ I 01 ~ ,.i,1 ~ 1'11' ~ III b II 6! I ~ I: 1 :1" N I'; I I II' I I I r j 1 I 1 Ii II;: I I II - - - - - - - - - - ~~ ~ - - - - _ J~ _____~I_L~_~~-~~j V , / /<\ " \/\ \ // \ \ ~ \ .> \ // \,./ \ / >/ -' ,-' L__ ---1 I I I 1 I I I I I :--1 ~B' --- HI l___l__i UJ --I m DA 'IE" RE'vISlONS i fi; { '1 ", .' / '1 '1 if It / / } /1 I ,';, G) ;0 I,}"~ }, }E; K ----=----------006:::J!' " w x899.0 ~ ~~---1r1 II.? 9 II III I , ( / / / / I , .cJ> c...., z' fTlO o o \J r '" o o I I I I I 1 1 I I ! 1 1 i 1 . 1 1 1 1 1 1 1 I 9 111 c;) c ,'] OC: --I Zc 0:;0 --UP1 )> o lD CD lD ~-------------~---------- c =r => c =r => c =r ~5_=:> _ _'- _ _ _L _ _ _1_ _ _L _ - -1- - - -1- - - -1- - -1- - - -,- - - -,- - w - -,- , - -1- - ~~im ~f mi~J ~f __1__ - -1- - (1) - -1- - - --1- - 1 1 - "I I c_=> c_=> CI:_=> c=r=> ::::::,::: ::: - -1-- - -,-- - _1__ - -1-- - -,-- ::: :::,:::::: - -1-- \ '-- --- -- - - -- ..,....--- - -- - - - -- -- I I I / I -L I '( ~J I I I I I I & I ~ ~~..-J ______J ...i ao au ~ CYi ",,,,\ r " (~ ,- \ I / -\-j/- - ~- )> /\ :I! / \ , '11 ~q '" Oa& ~ '17 Pl \ " 0, ....., \' ~~ \T- \J I ~ \ z J) ,y . i ( I I --1 I I STORM POND -' 1-- - I I I I I I L ~ ~ ~ & Q tl n BY OWNER/!lEVROPER fIYBlBI)E cot.t"ANEB 19230 EVANS STREET. SUllE 115 ElK RIVER, MINNESOTA PHONE: 763 241 1801 ATTN: Edward YoungquIst SPECTRUM HIGH SCHOOL B.J( RIVER - ~A J c;) ;0 ~t) > .. "ll c ::I In n j VI (") i' > r;; { .'{ \ }. ;j o ---J ---J I -.J r?vl )> :D o ::I: DAlE" BY REVISIONS FILE COpy _/DfVEl.OPEII FIIrEfIBCE COMPAtES 19230 EVANS STREET. SUllE 115 ElK RIVER. lllNNESOTA PHONE: 763-241-1801 ATTN: lAr. Oar)! Thompson CONCEPT FLOOR PI...ANS - BUI..DtKi B.EVAllONS SPECTRUM HIGH SCHOOL ax FIVER - WfESOTA