5. SR 11-14-1994 ,,-1-\) ( ); ~lll ITEM 5. MEMORANDUM MAYOR & CITY COUNCIL FROM: PAT KLAERS, CITY ADMIMTR NOVEMBER 14, 1994 ~ W SUBJECT: ELK HILLS DRIVE/HIGHWAY 169 INTERSECTION DATE: Please see the attached memo from the City Engineer on the possible construction timetable for this project. I believe that this construction timetable is very optimistic and will be very difficult to accomplish. The City Engineer indicates the same in somewhat softer terms at the end of his memo. e The City Council authorized a frontage road study in September just prior to consideration of the development proposal for the northeast corner of Elk Hills Drive and Highway 169. This development proposal is scheduled to be back before the Council on 11/21/94. We may want to see if this development project is moving forward this year before we spend City street funds on this street project. If the development project moves forward, it will be important to determine the financial participation of the developers in this street improvement project. This will determine, in part, the City's level of participation in this overall project. On Monday, 11/7, we just learned that the total cost of the improvements are in the $550,000 range and the City Council has not discussed our participation level (or our funding source) for this project. In order to meet a spring construction deadline, we have to initiate survey work while we are still doing a preliminary feasibility study. This is because we have to go out for bids by the end of January. (The survey work needs to be authorized on 11/14, but the plans and specifications can wait until 11/28 to be authorized). e The source of the City participation is going to have to be mainly, if not entirely, MSA funds. The level of our participation appears to be in the $275,000 or more range. We do not know what the exact status of our MSA funds are as we have just assessed out the Elk Park Center and the Western Area Phase II projects and the actual cost won't be determined until 1995. Also, MSA money for this Elk Hills project will not be received until 1996 and 13065 Orono Parkway. P.O. Box 490. Elk River, MN 55330. (612) 441-7420. Fax: (612) 441-7425 e 1997, so we will need to obtain a loan or do some internal financing in order to fund this project in 1995. At this time, I am sure if we do this project in early 1995, we will not have any other MSA money available for any other project in 1995 or 1996. We won't know if any MSA money is available for street projects in 1997 until we have finalized the Elk Park Center and Western Area Phase II projects in 1995. e e M~ I:ONSHTING ENGINEERS 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888- 2923 Fax: 612-644-9446 CIVIL ENGINEERING ENVIRONMENTAL MUNICIPAL _ PLANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL! MECHANICAL ENGINEERING HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: _MINNEAPOLIS PRIOR LAKE ST. PAUL W ASECA November 9, 1994 File: 230-246-80 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: ELK HILLS DRIVE / DODGE AVENUE / 5TH STREET POTENTIAL CONSTRUCTION SCHEDULE Dear Mr. Klaers: As requested by the City Council at their last meeting, I have prepared the following proposed schedule for the improvement of 5th Street, Dodge Avenue, and the intersection of Elk Hills Drive and TH 169. Based on discussion at the City Council meeting, the schedule shows initiating a project at the November 14th City Council meeting and starting construction early in the spring of 1995, with the project being completed at least through the first lift of bituminous surfacing by Memorial Day 1995, in an effort to minimize disruption to traffic along this commercial area. The schedule I would propose is as follows: November 14, 1994 - Order feasibility study. - Initiate plans and specifications. November 28, 1994 City Council accepts feasibility study and orders public hearing. December 1994 - Staff holds informational hearing with affected property owners. - City Engineer works with committee of business/ property owners on the design of the project. January 23, 1995 - Hold public hearing. - Approve plans and specifications and authorize advertisement for bids. February 16, 1995 Open bids. 230/246-0902.nov _ Mr. Pat Klaers November 9, 1994 Page Two February 21, 1995 City Council considers bids and orders assessment hearing March 13, 1995 - Hold assessment hearing. - Award contract contingent upon successful completion of 30 day assessment appeal period. ApriI1?,1995 Begin construction. May 26, 1995 Construction complete through first lift of blacktop. June 30, 1995 Entire project complete. _ As you can see, this is a very aggressive schedule and assumes that many things will fall into place, such as public support and involvement in the design process, lack of assessment appeals, and weather for early construction. If the City Council would like to initiate work on this project, I have attached a resolution which authorizes the preparation of a feasibility study. I would also request that the City Council give direction to initiate work on plans and specifications. This would allow us to begin the survey work prior to snowfall and begin preparing base plans which can be utilized for informational meetings and design meetings with a committee of property and business owners. If you have any questions regarding this, please call. Sincerely, MSA, CONSULTING ENGINEERS T~~ TJM:tw Attachment _ 230/246-0902.nov . _ e RESOLUTION 94 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION OF THE CITY OF ELK RIVER ORDERING A PRELIMINARY FEASffiILITY REPORT IN THE MATTER OF THE ELK HILLS DRIVE, DODGE STREET, DODGE AVENUE, AND 5TH STREET IMPROVEMENT OF 1995 WHEREAS the City has determined that it should consider improving certain property by upgrading 5th Street, Dodge Avenue, Dodge Street, and Elk Hills Drive (the improvement); and WHEREAS Council must first secure a preliminary feasibility study in order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: This matter shall be referred to MSA, Consulting Engineers, who is requested to provide to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 14th day of November, 1994. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk 230/246-0902.nov