5.7. SR 12-19-1994 rll -\j ( )j ~l}{ ITEM 5.7. MEMORANDUM TO: Mayor & City Council DATE: December 19, 1994 FROM: SUBJECT: Elk Hills Drive Improvement Project Feasibility Study A development project in the northeast corner of Elk Hills Drive and Highway 169 received preliminary plat approval and conditional use permit approval from the City Council on November 21, 1994. Associated with this development project are some desired improvements at the Elk Hills Drive/Highway 169 intersection, and, associated with this intersection improvement project, are additional street improvements on Dodge Avenue and 5th Street. . No one has been completely satisfied with the options for redesigning Elk Hills Drive at Highway 169. Currently, the City Engineer is working with MnDOT Officials to further explore design options for this intersection. Please see the attached 12/9/94 City Engineer letter on this topic. A representative for some of the busineses along Dodge Avenue has stated his desire to have this Elk Hills Drive intersection improved and upgraded before Memorial Day, 1995. A time line was put together that could accomplish this goal, and this time line was outlined in a 11/9/94 letter from the City Engineer (see attachment). At this time, everyone should understand that this project cannot be completed before Memorial Day, 1995. This is especially true when you take into consideration the preparation of the intersection that would need to take place before mid-April. Additionally, the City still needs to put together its financing package for this project, hold public meetings on the design options for the intersection, and go through the assessment process. This project can be completed in 1995, but I do not believe that it is realistic to think that it will be completed before Memorial Day. . council:ehdfeas 13065 Orono Parkway. P.O. Box 490. Elk River, MN 55330. (612) 441-7420. Fax: (612) 441-7425 MS l:ONSHTIN(, ENtlINEERS 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888- 2923 Fax: 612'644-9446 CIVIL ENGINEERING ENVIRONMENTAL . MUNICIPAL PLANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROlS OFFICES IN: . MINNEAPOLIS PRIOR LAKE S1. PAUL W ASECA DEe 1 2 1994 December 9, 1994 File: 230-246-10 Mr. Pat Klaers City Administrator City of Elk River P.O. Box 490 Elk River, MN 55330-0490 RE: 5TH STREET/DODGE/ELK HILLS DRIVE FEASffiILITY Dear Mr. Klaers: As you are aware, we are working on the feasibility study for the road improvements to 5th Street, Dodge, and Elk Hills Drive. The original schedule indicated the feasibility study would be presented to the City Council in late November or early December. However, based on comments we received when the original study was presented relative to the Elk Hills Drive/Dodge intersection, we are further exploring the option of a T intersection, which could be signalized in the future. We have contacted the traffic engineer from the Brainerd office of MnDOT, and asked him to assist in this process. They have agreed to analyze the effect the signal would have on their trunk highway system, and to provide us feedback relative to their position on such an installation. They indicated that their work would be available within the next two weeks. Therefore, I would like to hold-off presenting the final feasibility study to the City Council until sometime in early January, so that this item can be adequately addressed. We are continuing with the preliminary survey work and the preparation of a base map of the area, which could be used for the public informational hearing. I believe the slight delay in the feasibility study will not cause a great delay in the entire project schedule, should the City Council proceed with these improvements in the Spring of 1995. If you have any questions regarding this matter, please do not hesitate to call. Sincerely, MSA, CONSULTING ENGINEERS ~J1ItIl#UN Terry J. Maurer, P.E. TJM:pd 246-081O.dec 1326 Energy Park Drive St. Paul, MN 55108 612.644.4389 1.800.888.2923 Fax: 6 J 2.644.9446 CIVil ENGINEERING: ENVIRONMENTAL MUNICIPAL PLANNING .1IDWASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ElECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SODA SYSTEM CONTROlS OFFICES IN: .NNEAPOllS OR LAKE ST. PAUL W ASECA November 9, 1994 File: 230-246-80 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: ELK HILLS DRIVE / DODGE A VENUE / 5TH STREET POTENTIAL CONSTRUCTION SCHEDULE Dear Mr. Klaers: As requested by the City Council at their last meeting, I have prepared the following proposed schedule for the improvement of 5th Street, Dodge Avenue, and the intersection of Elk Hills Drive and TH 169. Based on discussion at the City Council meeting, the schedule shows initiating a project at the November 14th City Council meeting and starting construction early in the spring of 1995, with the project being completed at least through the first lift of bituminous surfacing by Memorial Day 1995, in an effort to minimize disruption to traffic along this commercial area. The schedule I would propose is as follows: November 14, 1994 - Order feasibility study. - Initiate plans and specifications. November 28, 1994 City Council accepts feasibility study and orders public hearing. December 1994 - Staff holds informational hearing with affected property owners. - City Engineer works with committee of business/ property owners on the design of the project. January 23, 1995 - Hold public hearing. - Approve plans and specifications and authorize advertisement for bids. February 16, 1995 Open bids. 2301246-0902.nov " . Mr. Pat Klaers November 9, 1994 Page Two February 21, 1995 City Council considers bids and orders assessment hearing March 13, 1995 - Hold assessment hearing. - A ward contract contingent upon successful completion of 30 day assessment appeal period. April 17, 1995 Begin construction. May 26, 1995 Construction complete through fIrst lift of blacktop. June 30, 1995 Entire project complete. . As you can see, this is a very aggressive schedule and assumes that many things will fall into place, such as public support and involvement in the design process, lack of assessment appeals, and weather for early construction. If the City Council would like to initiate work on this project, I have attached a resolution which authorizes the preparation of a feasibility study. I would also request that the City Council give direction to initiate work on plans and specifications. This would allow us to begin the survey work prior to snowfall and begin preparing base plans which can be utilized for informational meetings and design meetings with a committee of property and business owners. If you have any questions regarding this, please call. Sincerely, MSA,CONSULTINGENGThffiERS T2~ TJM:tw Attachment . 230/246-0902.nov