Loading...
5.3. SR 11-21-1994 NOU-1B-1994 12:39 FROM EOS ARCHITECTURE-INC TO 4417425 P.02 . .EOS Arcllitects and Engineers OffIces i.1) .Rochc~lcr ..",,1 M.ill"""I'"I;", MS TSPIEoS ZI Wal"'l 3lW,",l Rxcclsil1T. MN :i53~1 FAX (612) 474-3928 TEl. (612) 474-:1291 Member Q{TSP Group: Ru.;lw:;L;:r, MN MinncHpoli.~. MN Dent'cr, (:0 GUlette, Vi)' Rapid City. SD Sh\\ridall. wy .5J.OU:r.: Fa.lIs. SI) Mll.r.<halltnwn.IA e e An ~quaJ ()ppormnlry, AftirmarNe Action Employer ITEM 5.3. MEMORANDUM TO: Patrick Klaers - City .f\dminilltrator City of Elk River FROM; Rick G. Wessling- TSP I Eoe ArcbiteoWre DATE: 11-17-94 Be: Elk River Library Expansion On November the 1st. TSP I Eos Architecture reviewed the CODStn1cticm at tho libmry aDd gCDoru.tod a "pUDch list" CUWD.OJUting the miscellaneous items which need to be colTeCted. We found the project to be substantially complete and the board has CODcUlT8d with our dctcnDmaticm, therefore we will prooocd to issue the certificate of SlIbstantial completion dated November the 1st. This corresponds with the contractom required date of substantial oompletion of October the 31st. This is the date which establishes the beginning ofwornmty periods for equipment. The library is rurmiD&' under its new arrangement with. only minor items to be COlTeCted. The contractor has indicated his intent to have all the -punch list" items completed by the end of the month. The only itBm which will need to be completed in the spring is the complete charging of the air conditioning compressor. This is aD acceptable schedule to us. In regard. to the funding VB. actual conatl"uction costs the attached summary indicates the estimated amounts by line item VI. the actual cost. At the bottom is the amount of funds remaining ($32,095.00) These moines could be used to fund t\uuishingB au.d equipment needed in the new larger facility. PleaBe do not hesitate to call if you have any questioDs. End of Memo 94103\D0C\C0UNCIE-DOC NOU-18-1994 12:40 FROM EOS RRCHITECTURE-INC TO 4417425 P.03 ..os e e Artbitec:ts lUld Engineers ()fticc.'" in Rlx:he.~ter il.I:ld MinncQpolill. MN TSP/t:OS 2\ War.eT S..r<;C,. E;\ce1!'ilJr. MN 55331 FAX (612) 474.3928 'l"Ii:L (612) 11-1 ~291 Memba ofTSP Group: R",-he~\c;", MN Minneapolis. MN Den~'cr. CO Oi.II"u.:, wy Rapid City, SD Sho::ridm. wy Siuu.\ l"iUh. SD M.ar:~bal1.tov.1l, .IA A.. ~u,,1 Oi'l".1I Wllil.)' , Afljclnati\'e Actiou Employer EL1t RIVER LmRARY ADDrnON.AND REMODELING BUDGET SUMMARY November 15,1994 PRELIM. EST CaNST IAe:mAL TOTAL CONSTRUCTION 440,000.00 439,897.00 CONST. CONTINGENCY (7%) 80,800.00 0.00 CONTRACT ADJUSTMENTS 0.00 8,426.00 MOVING FURNITURE 0.00 3,910.00 RElMBURSABLES 6,000.00 6,000.00 TESTING 7,000.00 2,500.00 SURVEY 3,000.00 0.00 F.F.E. 0.00 0.00 ADMINISTRATIVE COSTS 12,500.00 12,172.00 BUILDERS RISKS 0.00 1000.00 ARCffiTECTURAL FEES 44.000.00 44.000.00 TOTAL PRO.JECT COST 543,300.00 1517,905.00 FUNDS AVADABLE TOTAL PROJECT COST I11NDS REMAINING 550,000.00 1517.901$.00 32,095.00 MI08\BOGStJMA