5.3. SR 08-06-2007
REQUEST FOR ACTION
To
Ci Council
Agenda Section
Administration
Item Description
Resolution Approving the Plans and Specifications and
Ordering the Advertisement for Bids in the matter of the
Wastewater Treatment Plant Phase II Improvement of 2007
Meeting Date
A st 6, 2007
Administrator
Action Requested
Consider adoption of Resolution Approving the Plans and Specifications and Ordering the
Advertisement for Bids for the Wastewater Treatment Plant Phase II Improvement and authorize
an expenditure not to exceed $4,500 for Ehlers and Associates to complete an updated utility rate
study.
BackKround/Discussion
As previously discussed with the City Council, the WWTP Phase II Improvement is the last
improvement at the Treatment Plant due to added treatment requirements by the Minnesota
Pollution Control Agency (MPCA). Future expansions of the WWTP will be driven by
development of the City and increased flow to the plant. The major components of the Phase II
improvement are as follows:
1. A new building containing a mercury reduction sand filter process.
2. Replacement and additional equipment in the ultraviolet disinfection building that
currendy exists on the site.
3. Providing permanent on-site generation for operation during electrical service disruption.
4. An addition to the garage building, adding an enlarged garage stall for the jet truck which
currendy just barely fits into the existing building. The garage stall freed up by the new
addition will be utilized to house smaller equipment.
5. Miscellaneous and piping improvements around the site.
Approval to bid Phase II is being requested from the Council now; however, the MPCA must
approve the plans before the project can be awarded so advertisement for bid will happen after we
receive preliminary approval from MPCA. The specifications and timing for the project call for
the majority of construction to start next spring.
The utility rate study is necessary since the last utility rate study was done many years ago. Sewer
rates have increased slighdy each year to help offset inflationary increases in operating costs.
Recent changes in our permit limits have required additional treatment which in turn increases
operating expenses. These additional treatment costs now need to be included in the rates. With
a projected slowdown in the SAC revenue, population growth, Phase II, and future Phase III
expansions it seems the appropriate time to review the rates for the Sewer Fund. Ehlers and
Associates have conducted numerous studies and would be ideal for the City of Elk River, since
the City uses them on all debt-related issues. They have quoted a price not to exceed $4,500 for a
rate study analysis. This would be completed yet this year in time to set 2008 sewer rates.
Financial Impact
The estimated project cost for the WWTP Phase II Improvements is 4.3 million dollars plus
engineering. Final project financing including the amounts financed with sewer funds and bonds
will be determined after bids are received.
Attachments
. Resolution Approving the Plans and Specifications and Ordering the Advertisement for
Bids in the Matter of the Wastewater Treatment Plan Phase II Improvement of 2007
. Sewer Fund Financial Statement
. Project Budget
Action
Motion by _
Second by _
Vote
Follow Up
S:\EngineedmprovProj\2007 Improvement Projects\ WWfP Phase n\08 06 07 CC memo revised LJ.doc
RESOLUTION 07-_
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS
AND ORDERING THE ADVERTISEMENT FOR BIDS
IN THE MATTER OF THE WASTEWATER TREATMENT PLANT PHASE II
IMPROVEMENT OF 2007
WHEREAS pursuant to City Council direction, the Project Engineer has prepared plans and
specifications for the Wastewater Treatment Plant Phase II improvement, which
plans and specifications have been reviewed by the City;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River,
Minnesota:
1. Such plans and specifications, a copy of which are available for inspection through the City
Clerk's office and incorporated herein by this reference, are hereby approved.
2. The City Administrator shall prepare and obtain the publication of an advertisement for bids
for the making of the improvement pursuant to the plans and specifications. The
advertisement shall be published once each week for three consecutive weeks and shall
specify the work to be done. No bids will be considered unless sealed and filed with the City
Administrator and accompanied by a cash deposit, cashier's check, bid bond, or certified
check payable to the City Administrator in the amount of 5% of the amount of such bid.
Passed and adopted this 6th day of August, 2007.
Stephanie A. Klinzing, Mayor
ATTEST:
Tina Allard, City Clerk
s: \EngineerImprovProj\2007 Improvement Projects \ WWfP Phase II\Resolution app plans&specs ad for bids.doc
BALANCE SHEET
CITY OF ELK RIVER
As of: 7/31/2007
Page: 1
8/3/2007
10:28 am
Balances
Fund Type: 20 Enterprise funds
Fund: 602 - W ASTEW A TER TREATMENT SYSTEM
Assets
Acct Class: 1000 Current Assets
1010 Cash
1012 Fair Value-Investments
1150 Accounts Receivable
1380 Interest Receivable
Acct Class: 1000 Current Assets
Acct Class: 1560 Other Assets
1560 Deferred Charges
Acct Class: 1560 Other Assets
Acct Class: 1600 Capital Assets
1610 Land
1620 Buildings & Structures
1630 Collection & Distribution
1640 Equipment
1650 Accumulated Depreciation
Acct Class: 1600 Capital Assets
5,942,030.88
18,283.00
431.25
29,885.00
5,990,630.13
23,836.51
23,836.51
Total Assets
411,094.98
8,725,665.93
23,195,212.81
483,551.13
-10,314,181.83
22,501,343.02
28,515,809.66
Liabilities
Acct Class: 2000 Current Liabilities
2040 Salaries Payable
Acct Class: 2000 Current Liabilities
Acct Class: 2250 Long-term Liabilities
2250 Bonds Payable
Acct Class: 2250 Long-term Liabilities
17,070.99
17,070.99
Total Liabilities
1,660,000.00
1,660,000.00
1,677,070.99
Reserves/Balances
Acct Class: 2400 Fund Equity
2400 Fund Balance
2600 Change In Fund Balance
Acct Class: 2400 Fund Equity
Total Reserves/Balances
26,460,512.43
378,226.24
26,838,738.67
26,838,738.67
28,515,809.66
Total Liabilities & Balances
CITY OF ELK RIVER, MINNESOTA
STATEMENT OF REVENUES, EXPENSES, AND CHANGES IN FUND NET ASSETS
SEWER FUND
YEAR ENDED DECEMBER 31,2006
Sewer
Current Year Prior Year
Operating revenues:
User charges $ 1,350,922 $ 1,250,222
Delinquency collections
Other 1,725 11 ,631
Total operating revenues 1,352,647 1,261,853
Operating expenses:
Personal services 341,620 303,247
Supplies 69,001 65,996
Purchased power
Other service charges 394,050 327,342
Depreciation 849,818 767,400
Total operating expenses 1,654,489 1,463,985
Operating income (loss) (301,842) (202,132)
Nonoperating revenues (expenses):
Connection charges 978,235 1,167,045
Interest income 280,208 147,214
Miscellaneous revenue
Interest expense (66,631) (130,661)
Bond issuance costs (3,027) (20,281 )
Gain (loss) on sale of capital assets (14,426)
Total nonoperating revenues (expenses) 1,188,785 1,148,891
Income before contributions and transfers 886,943 946,759
Capital contributions 1,134,740 556,429
Transfers in
Transfers out (272,175) (33,030)
Change in net assets 1,749,508 1,470,158
Total net assets - January I 24,711,004 23,240,846
Total net assets - December 31 $ 26,460,512 $ 24,711,004
1
Probable Project Costs
Wastewater Treatment Facility - Phase II Improvements
City of Elk River, MN
80M Consulting Engineers, PLC
Apr-07
Process Equipment
1 Filter Equipment (1)
2 Filter Equipment Installation
3 Filter Structure
4 Filter Control Building
5 Filter Enclosure
6 Miscellanous Improvements
7 Stand by power
8 Storm Sewer replacement
7 UV System
8 Garage Expansion
9 Trickling Filter Repairs
10 Site Works (10%)
11 Process Piping (10%)
12 Mechanical (6%)
13 Electrical, Instrumentation and Controls (10%)
14 Contingency (20%)
Subtotal
overhead and Profit (10%)
Total Construction Cost
Unit
Is
%
Is
sf
sf
Is
Is
ft
Is
sf
Is
Number
of Units
1
30%
1
1,000
2,880
1
1
500
1
1,350
1
Unit Costs
560,000
560,000
350,000
200
150
225,000
150,000
100
203,000
100
40,000
Opinion of
Probable
Capital Cost ($)
560,000
168,000
350,000
200,000
432,000
225,000
150,000
50,000
203,000
135,000
40,000
251,300
251,300
150,780
251,300
502,600
3,920,280
392,028
4,312,000
Note: (1) Equipment cost based on US Filter Hydro Clear sand filters.