Loading...
3.5. SR 08-13-2007 REQUEST FOR ACTION To Item Number City Council 3.5.* Agenda Section Meeting Date Prepared by Consent August 13, 2007 Gary Leinnoe, Chief Operator, WWTP Item Description Reviewed by Lift Station Wet Well Safety Grates Terry Maurer, Public Works Director Reviewed by Lori T ohnson, City Administrator Action Requested City Council is requested to approve a budget revision in the amount of $26,500 for the sewer division to allow safety grates to be installed on all existing wet wells (25 of them) in 2007 rather than waiting for 2008. Background/Discussion In recent years, we have changed our policy regarding new lift station construction. We now require safety grates on the wet wells to prohibit accidental falls into the structure when working around them. Our most recent lift station constructed in the River Park addition has such a safety grate included with it. In 2008, retrofitting all of the existing 25 lift stations with these safety grates was included in the sewer division budget. Due to the safety nature of this installation, we are requesting a budget amendment of $26,500 to install safety grates in 2007. The sewer division received four quotes that ranged from $23,336 to $39,338. Financial Impact Funding would come from sewer division reserves. Attachments · Copies of the four quotations Action Motion by _ Second by _ Vote Follow Up c: \Documents and Settings \jrniller\Local Settings \ Temporary Internet Files \ OLK3E\Lift Station Safety Well Grates 08 13 07 (3).doc Aug 02 07 10:36a robert crooks NORTH STAR 952 469 5246 p.1 " North Star Pump Bob Crooks 24645 Iceland Path Lakev~le. MN 55044 phone 612-597-7373 Fax: 952-469-5246 City of Elk River 248 Railroad Drive Elk River, MN 55330 Att: Gary Leirmoe Fax: 763-635-1177 From: Mike Riippa Cell: 612-597-2284 Re: Sanitary Lift Station Hatch Opening Safety Grating Gary, We are pleased to offer you our quotation for safety hatches for your sanitary lift stations to be installed below existing aluminum hatch covers to protect the safety of your operators. The following is a description of the scope of materials and labor provided on this project. Scope of Materials (23) Special safety grates consisting of dual hinged aluminum grate designed for a 300'PSF loading and will be furnished with 316 stainless steel hold open rods, hinges and hardware, aluminum pull-open arms, a staple for a padlock, stainless steel anchoring hardware, hatch angle supports, and a safety orange finish. Grates do vary in dimensions for site to site and have been measured accordingly. (1) Lot of labor for installation of all hatches provided. and necessary relocating of pump guide systems upper brackets and cable racks in order to complete safe and functional grating at all specified lift stations. (1) Lot of travel and mileage to and fromjobsites in order to complete project, along with removal of all job related debris. Total Price: $23.336.00 Dlus tax Please let us know if there is any questions or comments, thanks again for the opportunity to quote your project. Aug 02 07 10:36a ,.' robert crooks NORTH STAR North Star Pump Bob Crooks 24645 Iceland Path l.akeville, MN 55044 phone 612-597.7373 Fax: 952-469.5246 952 469 5246 p.2 If there is any part of the materials list that needs to be followed up with more specification please let me know. ~lY~ Mi Riippa ~ , 07/18/2007 WED 9:12 FAX 952 758 7778 .. .............~ 001/002..,,,.,... .-' BR1\IJN 'l:ltTM:.- & (;t)Nl~I.'flLS July 18, 2007 Post-it" Fax Note 76716;~'i~..::f:Tr~TI~.[(;?j:.;.~:)..m""" ...............-.-........--.-.----..--:--.--................. ..;............'.O.............-.7j-.--...{6._.......... ~~-0W~~""7""4!JL~~..Q..~.mmF.'.~.I;."f1~1,_.1~{.l.[M~1-............ ~:~~~~~I!~j;Jt_JSJ.sLf.::1~_..._._?~'.L!.LQti,J.J__. ~.l.:~:(n (/ __..._. Phono II PI")n(') /I q6":'~.,.. 7(}?:' .,(f(jif;() ~~~~.'r;'.:jLe=;.:...,[1J~i~f::::.ICIT ~:'~.:~~.:::.:::.::...~.....~..~~~~=::~~=~~:~:.~~ Gary LeimlOC City ofEJk .Rivcr 13065 Orono Parkway Elk River, MN 55330 Rc: Retrofit Safety Grutes n)r Hatch Covers Dear Gary, We arc pleased to orCer this quotation f()r the installation of safety grates in you hatch covers. All o('tl1o safety grates quoted arc designe:::d for 300 PSF loading and will be furnished with 316 stainless steel hold-open rods, hinges and hardware, aluminum pull-opcn arms, a staple for customer supplied padlock, stainless steel anchoring hardware, hatch net angle supports and a safety orange f1nish. Thirteen (13) .Retrofit Safety Grates for 30" x 48" Hatch Covers Total Installed Price $ 15.172.30 Two (2) Retrofit Safety Griltes for 36" x 48" Hatch Covers Total Installed Priee $ \889.30 Two (2) Retrofit Safety Gl'ates for 48" x 71" Hatch Covers Total Installed Price $ 7,547.50 Two (2) Retrofit Safety Gratcs for 48" x 72" I-latch Covers Total Installed Price $ 7,547.50 One (I) Retro/it Saf(;:ty Gnllc f()J" 54" x 72" Hatch Cover I_Qt~UJ1Stgl1cd Price $ 3.962.00 Grand Total $ 38,118.60 201 4th Ave. S.W. · P'(} Box 187 G New Prague, Minnesota 560'71 952-758-6600 .. Fax 952-7.58-7778 ~ 002/00l,,,..._., 07/18/2007 WED 9:12 FAX 952 758 7778 t Pricing docs not include freight charges or sales tax. Note: Estimated lead time is 4~5 weeks allcr receipt of order. Note: We will offer a deduct if the City supplies one person to assist our Service Technicians at all times while work is in progress. If you have any questions please feel free to call me. Thank You, Sincerely, DOJJ ( /3 ((};JiJ I Cp Davo Braul1'- DB/jb 08/07/2007 TUE 11:42 FAX 320 558 2002 TRI-STATE PUMP & CONTROL ~001 TRI-ST ATE PUMP & CONTROL 20092 21 st AVENUE EAST PO BOX 7 CLEARWATER, MN 55320 USA 320.558.2000 OR 1-800-537-2040 F~: 320-5oa-~002 ~mail: trislate@lristatepump.com Y'IWW.trislatepump.com Order NumberB20897 Customer ELKRIV Bill To: THIS IS A BID/ESTIMATE ShIp To: CITY OF ELK RIVER 13065 ORONO PARKWAY PO BOX 490 ELK RIVER, MN 55330 USA ArrlV; GARY CITY OF ELK RIVER 13065 ORONO PARKWAY PO BOX 490 ELK RIVER, MN 55330 USA ,Y:;:::::.T,:Date:, ::~:::;,:,:;:;;;:,:':\::;::.,:,;:/:::,:.;:Shlti\:Mia;:::;;:;(:,::':;:;;,;;:';::I:;:;;:"':;:c:~::::::::::;:FiO;B~ :i:;;;:; ....:::,::.... 08/071M UPS" ... . I .. ...... .....', I N30 ,.,: ;,:::' .i..:, :i:. ;':::F::.:.::::;Purchase:E>rder:Nurntll;l~:::;:;:';:;'::::;::D;:;;;:;!::: ;;C)tder;D:!lts:I:$~i1asoers:6ri! .!:,::":,:;i:::;i;::i+H;;i'.::Our"Order,,Number,,'::.y:';:,::.::::!i.i/'::;: ::Re~;:,,::'~'~~~;;-':"~;Oi:+ S~7...1 BB : :,::: :,y:gi~:T~~ ,I,q~'.~"Ef!~~:' ~ fAX 763-~3S--- //71 o NOTE EA N 0.00 0.00 INSTALL 22 SAFETY GRATES AT 18 LIFT STATION I.OCATIONS 1 0 MISC LOT SAFETY GRATES SIZED PER MEARSUREMENTS EA Y 0.00 0.00 1 0 MIse SUPPLIES FOR GRATE INSTALLATION EA Y 0.00 0.00 1.0 0.0 LF2 LABOR IN FIELD, 2 MEN HR N 0.00 0.00 1.00 0.00 LSP PACKAGE PRICE PER QUOTE EA Y 36937.14 36937.14 . VISA & MASTERCARD ACCEPTED NET 30 DAYS -1.5% MO. THEREAFTER ;;:"'--=;;;--> NO RETAINAGE ALLOWED <:..======='" VISIT OUR WEBSITE AT WWW.TR1STATEPUMP.COM Nontaxable Taxable Subtotal Tax (6.500%) Total Order 0.00 36937.14 2400.91 <:';:,:::~,:):~~~~~~g~ Page 1 Customer Original .1 " Quali~y Flow Systems, Inc. 800 - 6th Street NW PH: 952-758 - 9445 New Prague, MN 56071 Fax: 952-758-9661 To: City of Elk River " Fax: 763-635-1177 Att: Gary Leirmoe Quote 60074 From: Jun Pettit Date 7/17/07 Subject Retrofit safety grates for hatch covers 13 Retrofit safety grates for 30ill X 48in hatch covers .'Total1;1stalled price per station........ .$1,875.~0 each + tax ~'~ 13 x. ~1,,875.00 ;;;; $24,375.00 + tax 2 Retrofit safety grates for 36in x 48in hatch covers Total installed price per station: .... .. . .$1,875.00 t tax 2:, $1,875.00 "" $3,750.00 + tax . . "_ t{ 2 ..- Retrafit safety grates for 48in x 7lin hatch covers ,.Totanrista11ed price per station........ .$2,350.00 + tax ,. . 2 x $'2~~50.00;;;; $4,700.00 + tax ' 2 Retrofit s~ety grates for 48in )l: 12m.hatch co.~l:$ -. t , Total installed price per station........ ..$2,350.00 + tax :.2 x '$2;350.00 =$4,700.00 + tax 1 Retrofit safety grates for 54in x 12in hatch covers Total i~~stall~d price per statiOll.... . ... .$2,450.00 + tax . . , .' . Total price for above listed equipment labor.............. .$39,975.00.00 + freight & tax The abo~':quote includes all stainless steel hardware, Grating panel with spring loaded lift handlej:hold open ann with latch, pivot side support bracl<et and is rated for 300 psf loading '. . ... Delivery is 4 to 5 weeks after receipt of order . . If you have any questions are we can be of further assistance please give us a call Thank Yau, Quality FIQ.,w Systems Inc. ~IR.:ro-- l 'd 6LOO 'ON 1996 8jL ~j6 SAS MOlj A1IlVnO ~d80:~ LOO~'9l'lnr