5.2. SR 08-13-2007 5, ~ . MEMORANDUM TO: Mayor and City Council FROM: Lori Johnson, City Administrator DATE: August 13, 2007 SUBJECT: Street Capital Improvement Plan At Monday's meeting, we will begin discussions for approving the 2008 - 2012 five year capital improvement plan (CIP) with review of the streets projects. The parks CIP will be reviewed in September with others to follow in preparation of approval of the entire CIP before the end of the year. The biggest challenge with capital improvements is that there are always more needs and wants than there is money available. Staffs goal is to help the Council prioritize and fit projects into the funds that are available and then complete the projects approved by the Council. Of course, there are projects that will need to be delayed or maybe even not be done because others take priority. The CIP is approved with the understanding that the first year of the plan, in this case 2008, is generally set, but the rest of the plan is fluid; every year after that will be re-evaluated annually to take into consideration emergency projects, projects that may not have been considered earlier, and changes in priorities and funding. As we review funds available for future street projects, we need to keep in mind the two big projects currendy underway. In 2007, the third street rehabilitation project was approved. It was a large project, essentially taking on two rehabilitation projects in one year. This was done because of the condition of those streets and the desire to fix both of those areas now before additional deterioration occurred and rehabilitation became even more cosdy. However, that means we will likely not be able to do another large rehabilitation project until 2011 because of the impact of the city's share on the tax levy. In addition, the 193rd extension is proceeding and that project will use all the city's MSA funds for the next five years. That essentially means that there are very limited funds available for projects of any size until additional MSA money becomes available in 2012 or 2013 (depending on the actual costs of 193rd and the repayment schedule for funds borrowed). Even though MSA funds are not currendy available, there are reserve funds set aside for street projects. The City currendy has three street reserves that we are requesting be combined into one for easier administration. Additional information on that is provided in the attached memo from Finance Director Tim Simon. In 2005 I worked with Ehlers and Associates to review the tax impact of street rehabilitation projects so the projects could be timed and sized to keep the tax rate constant. When that Financial Management Plan was presented to the Council, it included a recommendation that the city maintain a $1,000,000 street improvement reserve. The reserve is necessary to fund emergency street projects, offer a cushion for the tax levy for street rehabilitation projects, and maintain adequate cash flow until MSA or bond funds are received. Weare carrying this recommendation through in the proposed CIP. As I said earlier, the 2007 street rehabilitation and 193rd projects have utilized most of the available street funds for the next several years. There is money available on an on-going basis each year for some projects depending upon the Council's priorities. For example, the proposed CIP includes funds for improvements to railroad crossings to decrease the whisde noise. If the Council decides not to do those improvements, more funds are available for other projects. The proposal also includes funding the Highway 10 geometric study in 2007 and purchasing rights-of-way for Highway 169 and County Road 33. The Council will need to decide how to proceed with acquiring the rights of way that will be needed for both of these projects. Along with discussing the 2008 - 2012 CIP, there is one 2007 project that staff wants to discuss, Main Street and Jackson Avenue. With construction nearing completing on the four projects in that area, consideration of a project to improve the streets should take place. The developers were required to restore the street; however, there are other improvements that could be made to improve pedestrian movement and improve the appearance of the streets. A memo on this project from Public Works Director Terry Maurer is attached. Next, we will go into discussion about the projects that are programmed from 2008 through 2012, focusing mainly on 2008. Priorities may change and projects may come to the surface that we cannot anticipate now so those will be adjusted each year as we annually approve the CIP. The attached summary sheet tided Project & Funding Sources by Department provides a listing of all the projects for the next five years, the funding source, and the estimated project cost. A description of each project is also attached. Terry Maurer will be present to discuss the projects in more detail at the meeting. In conclusion, Council approval is not expected at the worksession; this is a time for discussion and input from the Council so that we can prepare a final CIP. However, staff would like direction on the Main Street and J ackson Avenue project so that can proceed this fall. S: \Council\Lori\2007\CIP Streets 08 13 07.doc MEMORANDUM TO: Mayor and City Council FROM: Tim Simon, Finance Director DATE: August 13, 2007 SUBJECT: 2008-2012 Street Capital Improvement Program The purpose of this meeting is to provide information regarding projects proposed for funding in the 2008-2012 Capital Improvement Program (CIP) which will be adopted later this fall. City Engineer Terry Maurer would like to discuss a 2007 project which will be discussed in conjunction with the 2008-2012 CIP. There are a number of projects being proposed in which we identified the resources available to fund these projects. To meet the number of projects being proposed, the Council is asked to consider combining capital project fund 401 (Capital Projects Fund), 403 (Street Improvement Reserve), and 408 (permanent Improvement Revolving Fund) into one capital project fund designated for street improvements/ capital projects. While all three funds are treated in a similar fashion today, one or two funds would make reporting and tracking the reserve balances easier for the Council. Once all three funds are combined into one street/capital project fund, I would propose to establish a minimum cash reserve amount for unexpected expenditures/projects. That amount would be at a minimum of $1,000,000. With that in mind, the 2008-2012 street CIP has been formulated to maintain the minimum cash level. Part of the challenges and timing of these proposed projects are the projects committed to in 2007, which are the 2007 street improvement reconstruction project and the 193rd Avenue project. With the 193rd project the City Council committed over 5 years of Municipal State Aid to the project. The 2007 reconstruction project added over $100,000 to the tax levy for the next 10 years. With that in mind, the 2008-2012 CIP is constructed to maintain the reserve requirement and priority of the projects being proposed. There are always projects that will come up as being unfunded with the long-term planning that takes place with as-year CIP, the Council can re-prioritize the proposed projects on a yearly basis and adjust the CIP. I have attached copies of the 2008-2012 CIP being proposed and the additional 2007 CIP request form for the Jackson/Main Street overlay project. While this is a great tool for long- term planning of the street projects, we will again review the proposed projects in the 2009- 2013 CIP next year. Capital Improvement Plan City of Elk River, Minnesota 2007 thru 2011 Project # OV-04 Project Name MainSt/Jackson Ave Overlay Type Maintenance Useful Life 15 years Category Street Maintenance Priority 3 Important Contact Engineer Department Infrastructure Improvements Description Milling and overlay of Main St. from THIO to Lowell Avenue and Jackson Avenue from THlOto Main Street. The project will also include decorative cross walks and bump outs at Main Street and Jackson Avenue. Justification After the construction activities of two new buildings, a remodeled expanded building and a city park the condition of the streets is poor due to open cuts for utility connects and construction activities. Expenditures Construction/Maintenance 2007 350,000 350,000 2008 2009 2010 2011 Total 350,000 350,000 Total Funding Sources Street lTT)provement Reserve Total 2007 350,000 350,000 2008 2009 2010 2011 Total 350,000 350,000 I Operational Impact/Other 2006 elP Draft 05/30/06 Page 1 MEMORANDUM TO: Mayor and City Council FROM: Terry Maurer, Public Works Director DATE: August 13, 2007 SUBJECT: Downtown Overlay and Intersection Geometric Improvements Bill Maertz, Park and Recreation Director, Jeff Beahen, Police Chief, Scott Clark, Community Development Director, Phil Hals, Street Superintendent, and I have been discussing the potential need for improvements to Main Street and Jackson Avenue in the downtown area, along with potential improvements that could be made to the geometrics at the intersection of Main Street and Jackson Avenue to make the area much more pedestrian- friendly. As the Council is aware, we are nearing the end of three major building projects, which will in total add several million dollars of investment to our downtown area. Main Street and Jackson Avenue were last reconstructed in 1988. Through the building projects and other instances, they have been open cut and patched, and are generally showing their 20-year age. The staff mentioned above feels it is appropriate to discuss whether or not the city should invest in an overlay and re-striping of Main Street from TH 10 to Lowell Avenue and Jackson Avenue from Main Street to TH 10. In addition, we have been looking at potential improvements to the intersection of Main Street and J ackson Avenue, which would make the entire area much more pedestrian-friendly, along with extending the park features into the intersection, tying in the north side. I will have a brief PowerPoint presentation showing the various types of improvements that could be made. I will have a recommendation from the staff mentioned above along with a cost estimate and timing for an implementation strategy. The City Council is requested to discuss and determine if there is a need for a downtown overlay and intersection geometric improvement. If the Council feels that this entire improvement or portions of it are appropriate, staff would request further action to authorize bidding and preparations for implementation. MEMORANDUM TO: Mayor and City Council FROM: Bill Maertz, Parks and Recreation Director DATE: August 13, 2007 SUBJECT: Downtown Crosswalk Improvements Staff has reviewed the proposed crosswalk improvements included as an option in the overlay project for downtown streets. These improvements would provide for a safer pedestrian environment. In light of the number of people visiting River's Edge Commons, many of whom are young children, any improvement in pedestrian safety is highly desirable. In addition the look of the pavers used in the crosswalk improvements will compliment and enhance the new park As Parks and Recreation staff continues to develop more events at River's Edge Commons there will likely be large crowds on a regular basis. Staff believes that the crosswalk improvements will be a positive both from an aesthetic and safety standpoint and will aid in creating a positive image of downtown Elk River. City of Elk River, Minnesota [Q) ~ffi\~u Capital Improvement Plan 2008 thru 2012 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2008 2009 2010 2011 2012 Total iInfrastructure Improvements I 193rd Avenue Extension to CR13 11-18 2 3,556,500 3,556,500 Trott Brook Road Crossing 11-20 3 250,000 250,000 Rail Road Crossing Quiet Zones 11-21 3 500,000 500,000 1,000,000 Jackson Rd/School St. Intersection Modifications 11-22 3 350,000 350,000 Main Street Right Tum Lane 11-23 3 175,000 175,000 Right tum lane on North Bound Proctor Avenue 11-24 3 150,000 150,000 Detached Trail on 197/198th Avenue 11-25 3 225,000 225,000 TH 169 Land Acqu isition LA-01 5 250,000 250,000 500,000 Land Acquisition for CSAH 33 LA-02 3 600,000 600,000 Assessable Street Overlay Projects OV-03 3 500,000 550,000 600,000 1,650,000 Pavement Management Program PM-01 2 1,250,000 1,250,000 Annual Street Sealcoat Program SC-02 3 120,000 125,000 130,000 135,000 140,000 650,000 Street Light Replacement HWY 10 (Downtown Area) SL-04 3 100,000 100,000 Signal Light Painting SL-09 3 20,000 20,000 40,000 Highway 10 Geometric/Environmental Study TP-02 3 500,000 500,000 . Infrastructure Improvements Total 5,726,500 820,000 1,180,000 1,805,000 1,465,000 10,996,500 Grand Total 5,726,500 820,000 1,180,000 1,805,000 1,465,000 10,996,500 2006 CIP Draft 05/30/06 Page 1 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Contact Engineer Department Infrastructure Improvements Project # 11-18 Project Name 193rd Avenue Extension to CR13 Type Infrastructure Useful Life 25 years Category Street Construction PriOl"ity 2 High Priority Description I Extend 193rd Avenue to connect to CSAH 13 to create East/West corridor including land acquisition. Justification I Needed connection according to Transportation Plan Aug 2004 Expenditures 2008 2009 2010 2011 2012 Total Planning/Design 75,000 75,000 Land Acquisition 1,250,000 1,250,000 Construction/Maintenance 2,200,000 2,200,000 Other 31,500 31,500 Total 3,556,500 3,556,500 Funding Sources 2008 2009 2010 2011 2012 Total Federal Grants 996,000 996,000 Municipal State Aid 600,000 600,000 600,000 600,000 285,500 2,685,500 Total 600,000 600,000 1,596,000 600,000 285,500 3,681,500 2006 CIP Draft 05/30/06 Page 2 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Contact Engineer Department Infrastructure Improvements Project # II-20 Project Name Trott Brook Road Crossing . Type Infrastructure Useful Life 25 years Category Street Construction Priority 3 Important Description I Construct road crossing (bridge) of Trott Brook between River Park Addition and Twin Lake Estates. Justification I The link will c;onnect three major residential areas, Trott Brook Farms, Twin Lake Estates, and River Park so movements between them do not have to go out on the County road system. It will enhance emergency vehicle access and maintenance activities. Expenditures 2008 Construction/Maintenance 2009 2010 2011 2012 250,000 250,000 Total 250,000 250,000 Total Funding Sources 2008 Street Improvement Reserve 2009 2010 2011 2012 250,000 250,000 Total 250,000 250,000 Total 2006 elP Draft 05/30/06 Page 3 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Contact Engineer Department Infrastructure Improvements Project # 11-21 Project Name Rail Road Crossing Quiet Zones Type Infrastructure Useful Life 25 years Category Street Construction Priority 3 Important Description I Construct quiet zones @ 10 railroad crossings (6 city, 3 county and 1 private) within city. Justification I This may reduce the train whistles through the City. Expenditures 2008 Construction/Maintenance Total 2009 500,000 500,000 2010 500,000 500,000 2011 2012 Total 1,000,000 1,000,000 Funding Sources 2008 Street Improvement Reserve Total 2009 500,000 500,000 2010 500,000 500,000 2011 2012 Total 1,000,000 1,000,000 2006 CIP Draft 05/30/06 Page 4 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Contact Engineer Department Infrastructure Improvements Project # 11-22 Project Name Jackson Rd/School St. Intersection Modifications Type Maintenance Useful Life 20 years Category Street Maintenance Priority 3 Important I>escription I Add a.southbound right turn lane from Jackson Road to Westbound School St. Also, add turn arrows to the existing signal system for south bound Jackson Road and west bound School Street Justification I . With increased traffic through the intersection the proposed improvements will help the intersection operate more efficiently. Expenditures Construction/Maintenance 2008 350,000 350,000 2009 2010 2011 2012 Total 350,000 350,000 Total Funding Sources Street Improvement Reserve 2008 350,000 350,000 2009 2010 2011 2012 Total 350,000 350,000 Total 2006 CIP Draft 05/30/06 Page 5 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # 11-23 Project Name Main Street Right Turn Lane Description Extend the length of existing right turn lanes on Main St at TH 169 Contact Engineer Department Infrastructure Improvements Type Infrastructure Useful Life 20 years Category Street Maintenance Priority 3 Important Justification At times, the queue of traffic moving through the intersection prohibits right turning vehicles from entering the turn lane. By lengthening the right turn lane this situation will be improved. Expenditures 2008 Construction/Maintenance 2010 2011 Total 2009 175,000 175,000 Funding Sources 2008 Street Improvement Reserve 2010 2011 Total 2009 175,000 175,000 2006 C/P Draft 05/30/06 Page 6 2012 Total 175,000 175,000 2012 Total 175.000 175,000 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # 11-24 Project Name Right turn lane on North Bound Proctor Avenue Description Widen North bound Proctor Ave at THl 0 to allow right turn lane Contact Engineer Department Infrastructure Improvements Type Infrastructure Useful Life 20 years Category Street Maintenance Priority 3 Important Justification Widen the road and establishing a right turn lane will allow vehicles to make a right turn on "red" after stopping. Expenditures 2008 Construction/Maintenance 2009 2010 Total Funding Sources 2008 Street Improvement Reserve 2009 2010 Total 2006 CfP Draft 05/30/06 Page 7 2011 150,000 150,000 2011 150,000 150,000 2012 Total 150,000 150,000 2012 Total 150,000 150,000 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Contact Engineer Department Infrastructure Improvements Project # 11-25 Project Name Detached Trail on 197/198th Avenue Type Infrastructure Useful Life 20 years Category Street Maintenance Priority 3 Important Description I Construct a 10ft wide detached bituminous trail along 197/198th Avenue from TH 169 to Tyler St. Justification I A detached trail will get pedestrians off of the roadway . Expenditures 2008 Construction/Maintenance 2009 2010 2011 2012 225,000 225,000 Total 225,000 225,000 Total Funding Sources 2008 Street Improvement Reserve 2009 2010 2011 2012 225,000 225,000 Total 225,000 225,000 Total 2006 CIP Draft 05/30/06 Page 8 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # LA-Ol Project Name TH 169 Land Acquisition Contact Engineer Department Infrastructure Improvements Type Land Useful Life Unassigned Category Street Construction Priority 5 Future Consideration Description I Acquire land, whenever possible, for use by MNDOT in the future for expansion of TH169 to a freeway standard. Justification I Utilize MNDOT approved (future) geometric layout for chosen alternative for TH169. Acquired land can be used towards the City's future cost participation for improvements on TH 169. 2010 Expenditures Land Acquisition 2008 2009 2011 250,000 250,000 Total 2012 250,000 250,0~0 Total 500,000 500,000 Funding Sources 2008 Street Improvement Reserve 2009 2010 2011 250,000 250,000 Total 2012 250,000 250,000 Total 500,000 500,000 2006 CIP Draft 05/30/06 Page 9 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Contact Engineer Department Infrastructure Improvements Project # LA-02 Project Name Land Acquisition for CSAH 33 Type Land Useful Life Unassigned Category Street Construction Priority 3 Important Description I Land acquisition for Sherburne County reconstruction/realignment of CSAH 33 from TH169 to east City limits. (assume .75 mile by 100ft @ $65,OOO/Ac) Justification I As Sherburne County plans for a realignment of CSAH 33 to eliminate the sharp curves; their cost participation policy requires the City to acquire the Right of Way. Expenditures Land Acquisition 2008 600,000 Total 600,000 2009 2010 2011 2012 Total 600,000 600,000 Funding Sources Street Improvement Reserve 2008 600,000 600,000 2009 2010 2011 2012 Total 600,000 600,000 Total 2006 elP Draft 05/30/06 Page 10 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # OV-03 Project Name Assessable Street Overlay Projects Type Improvement Useful Life 15 years Category Street Maintenance Priority 3 Important Contact Engineer Department Infrastructure Improvements Description I Street overlay projects or other street rehabilitation procedures that are assessable to benefitting properties. Justification I An overlay of streets starting to show surface wear will extend their useful life and postpone the need for a much more expensive reconstruction project. Expenditures Construction/Maintenance Total Funding Sources Capital Projects - Assessment Total I Op=tionW hnp~~ 2008 500,000 500,000 2009 2010 550,000 550,000 2011 2012 600,000 600,000 Total 1,650,000 1 ;650,000 2008 500,000 500,000 2009 2010 550,000 550,000 2011 2012 600,000 600,000 Total 1,650,000 1,650,000 2006 CIP Draft 05/30/06 Page 1'1 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # PM-Ol Project Name Pavement Management Program . Contact Engineer Department Infrastructure Improvements Type Improvement Useful Life 25 years Category Street & Utility Construction Priority 2 High Priority Description I Replace aged and deteriorated streets, water mains, sewer mains, storm drainage, and pedestrian pathways. Justification I Method of improvement for aging infrastructure that cannot be rehabilitated by other methods. 2010 2012 Total 1,250,000 1,250,000 Expenditures 2008 Construction/Maintenance 2009 2011 1,250,000 1,250,000 Total Funding Sources 2008 Special Assessments Street Improvement Reserve Tax Supported Bond Issue 2009 2010 2011 416,666 416,667 416,667 1,250,000 Total 2012 Total 416,666 416,667 416,667 1,250,000 2006 elP Draft 05/30/06 Page 12 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # SC-02 Project Name Annual Street Seale oat Program Description Sealcoat streets as identified by Street Superintendent and City Engineer. Justification Method of maintaining the surface condition of the City street infrastructure. Expenditures Construction/Maintenance 2008 120,000 120,000 2009 125,000 125,000 2010 130,000 130,000 Total 2011 135,000 135,000 Contact Street Supt. Department Infrastructure Improvements Type Improvement Useful Life 10 years Category Street Maintenance Priority 3 Important 2012 140,000 140,000 Total 650,000 650,000 Funding Sources 2008 2009 2010 2011 2012 Total General Fund Operating 100,000 110,000 115,000 120,000 125,000 570,000 SealCoat Reserves 20,000 15,000 15,000 15,000 15,000 80,000 Total 120,000 125,000 130,000 135,000 140,000 650,000 2006 CIP Draft 05/30/06 Page 13 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Contact Engineer Department Infrastructure Improvements Project # SL-04 Project Name Street Light Replacement HWY 10 (Downtown Area) Type Maintenance Useful Life 25 years Category Street Maintenance Priority 3 Important Description I Replace Highway 10 lighting Justification I The highway lighting is deteriorating and by agreement with MNDOT is the responsibility of the City to replace. Expenditures Construction/Maintenance 2008 100,000 100,000 2009 2010 2011 2012 Total 100,000 100,000 Total Funding Sources MnDOT Cooperative Funds Street Improvement Reserve 2008 25,000 75,000 100,000 2009 2010 2011 2012 Total 25,000 75,000 100,000 Total 2006 elP Draft 05/30/06 Page 14 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # SL-09 Project Name Signal Light Painting Description Paint signal systems I Contact Engineer Department Infrastructure Improvements Type Improvement Useful Life 20 years Category Street Maintenance Priority 3 Important Justification I According to MNDOT/City signal agreements it is the responsibility of the City to repaint signal systems as needed. With the age of the signal systems repainting will be required in the foreseeable future. 2010 2012 Total 40,000 40,000 Expenditures 2008 Construction/Maintenance 2009 20,000 20,000 2011 20,000 20,000 Total Funding Sources 2008 Street Improvement Reserve 2009 20,000 20,000 2010 2011 20,000 20,000 Total 2012 Total 40,000 40,000 2006 elP Draft 05/30/06 Page 15 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Contact Engineer Department Infrastructure Improvements Project # TP-02 Project Name Highway 10 Geometric/Environmental Study Type Study UsefnlLife Unassigned Category Street Construction Priority 3 Important Description I Continue study ofTHlO between TH169/l01 and Proctor Avenue to obtain chosen alternative and environmental clearances. Justification I Continuation ofMNDOT IRC study of2002 in downtown area of Elk River. The alternate highway configuration was left unanswered in the IRe study. Expenditures Planning/Design 2008 500,000 Total 500,000 2009 2010 2011 2012 Total 500,000 500,000 Funding Sources Street Improvement Reserve 2008 500,000 500,000 2009 2010 2011 2012 Total 500,000 500,000 Total 2006 CIP Draft 05/30/06 Page 16 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Contact Engineer Department Infrastructure Improvements Project # TP-03 Project Name Highway 169 Geometric/Environmental Study Type Study Useful Life Unassigned Category Street Construction Priority 3 Important Description I Continue ofMNDOT study ofHwy 169. Interest free loan being soughtfrom MNDOT. Justification I Funding Sources Municipal State Aid 2008 200,000 Total 200,000 2009 200,000 200,000 2010 200,000 200,000 2011 200,000 200,000 2012 200,000 200,000 Total 1,000,000 1,000,000 2006 CIP Draft 05/30/06 Page 17