Loading...
5.2. SR 08-20-2007 REQUEST FOR ACTION To Ci Council Agenda Section Administration Meeting Date August 20, 2007 Item Number 5.2. Prepared by Bill Maertz, Parks and Recreation Director Reviewed by Lori ohnson, Ci Administrator Reviewed by Item Description Award Bid Package 01:YMCA Project Action Requested Award Bid Package 1: YMCA Project Background/Discussion Bid package 01 included precast wall panels, precast plank and structural steel. . Five bids were received for structural steel. The low bid was Camelot Steel with a base bid of $298,000. . Two Bids were received for precast plank. The low bid was Hanson Structural Precast with a base bid of $172,765. . Two bids were received for precast wall panels. The low bid, Wells Concrete Products, was unable to meet the delivery schedule; therefore, dleir bid was deemed non-responsive and invalid. The other bidder, Hanson Structural Precast, ha~ indicated that they can deliver the product within the schedule parameters. The base bid fnpm Hanson Structural Precast was $645,937. Financial Impact Structural Steel $298,000 Precast Plank $172,765 Precast Wall Panels $645,937 As per the terms of the Contract Documents, the awarq of these contracts at this time only allows the contractors to proceed with the shop drawings. The fiscal exposure to the City of Elk River by awarding these contracts at this time is $83,708. Attachments · Memorandum and Bid Results from RJM Construction Action Motion by _ Second by _ Vote Follow Up C\Documents and Settings\jmiller\Local Settings\Temporary Internet Files\OLK3E\Bid Package 1 Award YMCA (2).doc \J 13,2007 M~. of Elk River Orono MN 55330 Re: River YMCA for A ward of Contract - Bid Dear Bid Hanson P.O. Box PreG{1st MN 55311 Bid 3B~.. 11 8id Camelot Metals 2500 West MN B Endoscd above. of the bids received on a scope revIew Based on the resulls of these the eontraets as Base Bid Cancellation Cost: s s I Cancellation Cost: $! Base Bid Amount: Cancellation Cost S $ bid. Bid Ilsted was the low bidder for to meet thc dates frir until over two months it is the date for the we propose that the therefore Hanson the As per the terms of the Contract allows the contractors to with the of the Council awards the to the of Elk River the award of these contracts at this time shop The appmval to will not be to contmetors for 17, 2007, The contracts at this IS If you should have free to contact me, co Elk Bid Package OJ . Bid Results Precast Walls, PrCccllst Plank, Structural Steel !lid Date: .July 26,2007 Bid Time: 2:00 I'M Precast Wall Panels Wells Concrete Products Hanson Structural Precast $12,000 $13,000 $84,300 515,000