7.1. SR 10-15-2007REQUEST FOR ACTION
To Item Number
Ma rox and Ci CouncIl 7.1.
Agenda Section Meeting Date Prepared by
Public Works October 15, 2007 Tet Maurer, Public Works Director
Item Description. Reviewed by
Consider Resolution Ordering the Preparation of Plans and Loxi ohnson, Cit Administrator
Specifications in the Matter of the Downtown Overlay and Reviewed by
Intersection Geometric Improvement of 2008
Action Requested
Adoption of the attached resolution authorizing the preparation of plans and specifications fox the
Downtown Overlay and Geometric Improvements.
Background/Discussion
As directed by the Ciry Council, I have held two informational meetings concerning the proposed
geometric improvements to the Main Street/Jackson Avenue intersection. The first was held on Monday,
August 27"' at 3:30 p.m. and the second was held on Tuesday, August 28~' at 8:00 a.m. Attached is a
memo I prepared to the City Administrator dated August 30, 2007, describing those two informational
meetings. I also met with the Rivers Edge Group on Wednesday, October 10, 2007. The general tone of
those in attendance at the Rivers Edge Group was supportive of the full intersection improvement. They
thought it would make the downtown area much more pedestrian friendly; however, they were concerned
about maintenance of traffic during the period of the intersection closure. The information I provided to
them showed a more detailed wank plan with a shutdown of the intersection of 12 days, starting on
Monday of the first week and opening back up by the Friday of the second week, so that only one
weekend would be impacted.
Fox your information also attached are e-mails I received from Wendy Simenson and Patty Hipsag
regarding the proposed improvements.
Financial Impact
The total project cost including the overlay and geometric improvements is estimated at $430,000. The
proposed 2008 Streets Capital Improvement Plan (CIP) has $350,000 programmed fox this project. The
CIP would need to be changed to provide additional funding fox this increased cost.
Attachments
• Resolution Authorizing Preparation of Plans and Specifications
• August 30, 2007 memo to Loxi Johnson, Ciry Administrator
• Patty Hipsag e-mail
• Wendy Simenson e-mail
• Proposed Geometric Layout (from August 13, 2007 presentation)
• Proposed Overlay Axea (from August 13, 2007 presentation)
Action blohon by Second 6y Vo[e
Follow Up
S:\LngineerImprovProj\2007Improvement Projects\main street overlay\70 15 07 memo CC.doc
RESOLUTION 07-
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION ORDERING THE PREPARATION OF
PLANS AND SPECIFICATIONS IN THE MATTER OF THE
DOWNTOWN OVERLAY AND INTERSECTION GEOMETRIC
IMPROVEMENT OF 2008
WHEREAS there has been recent investment in the downtown area consisting of three buildings and a
public park; and
WHEREAS the public streets in the downtown area are approximately 20 years old; and
WHEREAS many more pedestrians axe expected in the downtown area with events programmed at the
park and new residential units opening.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of F.lk River, Minnesota:
1. The overlay improvements on Main Street from Lowell Avenue to the Parrish Avenue Bridge and on
Jackson Avenue from TH10 to Main Street together with intersection improvements described in
the PowerPoint presentation to the City Council on August 13, 2007, are hereby ordered.
2. 't'erry Maurer, P.P. is hereby designed as project engineer for this improvement The pxojecY
engineer is duetted to prepare plans and speciFications for the making of the improvement and the
solicitation of competitive bids.
Passed and adopted this 15°h day of October, 2007.
Stephanie A. Klinzing, Mayor
ATTES'L':
Tina Allard, City Clerk
S:ARnhrineerimprovPn~jA2007 tmprovemeot Projects\main street overlayV12csolutionsVOrdenng Plans & Spers.doc
MEMORANDUM
TO: Lori Johnson, City Administrator
FROM: Terry Maurer, Public Works Director
DATE: August 30, 2007
SUBJECT: Main StreetJJackson Avenue Proposed Geometric
Improvements
As directed by the City Council, I have held two public meetings fox the downtown
property/business owners regarding the proposed geometric improvements to the
intersection of Main Stteet and Jackson Avenue. Attached is the letter that was sent out on
August 17, 2007 and the mailing list it was sent to. The two meetings were scheduled fox
Monday, August 27`s at 3:30 p.m. and Tuesday, August 28'~ at 8:D0 a.m. There were five
people in attendance at the Monday meeting and no attendance at the Tuesday meeting.
Attached is the sign-in sheet from Monday's meeting. Beyond the attendance at the Monday
afternoon meeting, I did receive one phone call from Dx. Rafferty who could not make
either meeting, but after discussing the proposed improvements, he was in favor as long as
there was no charge to the businesses and no loss of parking.
At the Monday afternoon meeting, I went through the same PowerPoint presentation that
was presented to the Council at the workshop where the Street C.LP. was discussed. All of
those in attendance thought that the improvements would be a good finishing touch to the
downtown redevelopment projects cuttently underway. Pat Dwyer made a comment that he
has been in attendance at each of the downtown park concert series and indicated there has
been a significant number of pedestrians crossing the intersection. John Babcock trade a
similar comment and also indicated that he has biked downtown with his children and
supported a smaller intersection to cross as a pedestrian and a larger cornet which could be
used far a bike rack location adjacent to the park. Fred McCoy was in support of it and
indicated when questioned that he could deal with deliveries to his establishment with the
intersection closed during construction. Wendy Simonson asked if I would be willing to
appear at the Downtown River's Edge Group and I indicated that would be fine to schedule
me fox the October meeting.
I would suggest that this item, if appropriate, be put back on the City Council agenda fox the
third Monday in October which would be after the River's Edge meeting, at which time I
can report back to the Council and look fox direction on how to proceed. As a side note, I
S' \En~nee~\2007 memos\08 30 07 LJ Mvn&Jacksoadoc
have had a discussion with Dennis Anderson from Flanuexy Construction about their use of
Jackson Avenue and Main Street for the Jackson Place project He indicated it would be at
least the end of September and maybe into eatlp October before he was done utilizing the
street and had restored the concrete curb and sidewalk adjacent to the building. With this
timing, it would be mp recommendation that even if only an overlay of Jackson Avenue and
Main Street is to proceed, it would be best done is the spring of the peaz.
If you have anp questions xegazding this issue, please contact me.
S:\Enginea\2007 manos\OB 30 07 LJ Main&Jackson.doc
I am writing to you on behalf of a few downtown merchants that I have spoken to in the last couple of days
regazding the issue of the intersection at Main and Jackson. We understand the desire to beautify
downtown ,and to make it as aesthetically pleasing as possible. But at what cost?? As a group we have
endured some extreme hardships in the past year. Some of us barely hanging on. As for myself, I had a
new business that was thriving for 3 years, right up until the fast road closure. I watched each month as the
numbers fell. Businesses closed, owners had to take out loans for payroll, another business is now
"throwing in the towel", and a lot of mental anguish was felt by all of us.
Downtown Elk River is just now becoming a destination again. The park has brought people back here.
There are smiles, laughter and people having fun, I love seeing it all on Thursday evenings. It is truly a
bright spot in this whole constmction period. And I, unlike many people, actually think that the new
buildings aze very nice! I hope that the housing and retail will be fully occupied. This will bring a new life
to downtown that is very much needed. I don't yet see that the new construction has had a positive impact
on the existing businesses ,with the exception of the pazk, but hopefully that will come.
Now, my point to this letter. If you close the intersection at main and Jackson for 3 weeks, it will cause
further hardship to us. We are just now starting to see business improving. I know that customers will be
able to get here, and will have to turn around in the street, but most people don't want to deal with
construction areas of any kind. My customers have voiced that over and over this past year. It is a hassle.
And many people come here on a time budget. When I tallced to some of my downtown neighbors, and
explained to them what was going to happen, I got some very heavy sighs and "not again" responses.
Please reconsider your plan. There has to be a way to beautify the area without affecting traffic to this
degree.
Sincerely,
Patti Hipsag
The Bead Bag
Maurer, Terry
From: Wendy Simenson
Sent: Wednesday, August 2 , 2007 11:02 AM
To: Maurer, Terry; Mehelich, Catherine
Subject: Downtown Street Reconfiguration
Hi Terry, I think that your plans for the street by RiversEdge Commons Park are very
aesthetically pleasing. I did not say much at the meeting on Tuesday night because I
needed to weigh having the street closed for that length of time versus having it look
nice. I don't want to seem short sighted becauseI think there is definitely value in what
you are proposing. However, the downtown businesses are still pretty beat up from the
street closures and traffic disruptions that have adversely affected our businesses during
the last year. We all live in dread of having to live through that again. The project
would probably be more palatable if it didn't require closing the intersection and thus
the streets. What other ways of handling the project have you considered - maybe forgoing
cement in the middle of the intersection - that would still provide the pavers and changed
street width without having to close the streets and steering our customers away from
downtown?
Wendy Simenson
~~