7.6. SR 12-17-2007REQUEST FOR ACTION To Item Number Ci Council 7.6.. Agenda Section Meeting Date Prepared by Administration December 17, 2007 Tim Simon, Finance Director Item Description Reviewed by Approval of the 2008-2012. Capital Improvement Plan Reviewed by Action Requested Consider approval of the 2008-2012 Capital Improvement Plan (CIP). Background/Discussion Over the past several months, City staff and the Council have been reviewing the proposed 2008-2012 CIP leading up to its adoption. During various work sessions, we reviewed the costs, funding sources, and the general purpose of the projects. The CIP is a revolving document that is re-evaluated on an annual basis; upon each annual update some projects will be deleted, added, or even delayed, reflecting community needs and financial ability to fund the project. One item that Council directed staff to review was reallocating the $1,000,000 in railroad quiet zones. City staff is recommending that the funds be reallocated to the pavement management program in 2009 for street rehabilitation. The Ice Arena lobby expansion has been left in the CIP in year 2009, but as Council continues the discussion, it will be adjusted as determined. The planning commission reviewed the CIP to ensure it meets the objectives of the comprehensive plan. The planning commission reviewed and approved the CIP on November 13, 2007. Financial Impact See various funding sources identified in the 2008-2012 CIP. The 2008 items have been discussed and incorporated in the 2008 budget. Attachments ^ 2008-2012 Capital Improvement Plan ACtlon Motion by Second by Vote Follow Up S:\Council\Tim\2008capitalimprovementplan.doc City E Capital Improvement Plan 2008 - 2012 City Of Elk River CAPITAL IMPROVEMENT PLAN 2008-2012 Enclosed is the City of Elk River's Capital Improvement Plan (CIP) for the years 2008- 2012. The document has been prepared for the City Council and Community to anticipate major expenditures in advance of the year they may become budget requests. The CIP is a planning tool that forecasts the City's capital needs over afive-year period based on the City's long-range plans, goals, and policies. City staff estimates the amount of funding that is needed for projects to be completed in the next five years. Projects listed in the first year axe included in the budget and upon each annual update of the CIP some projects will be deleted, added, or even delayed reflecting community needs and financial ability to fund the project. Approval of the CIP by Council does not authorize spending or initiation of a given project nor allocate funding for any of the projects; it simply states the Council's support and acknowledgement of the Capital Improvement Plan as a planning tool. Capital improvements to streets, parks, buildings, equipment, software, and vehicles are included in the CIP. This plan shows the estimated project costs and the anticipated funding source. Specific information is shown on each project within this document. The CIP does not put specific designation on the priority of the projects. The uniqueness of the type of project generally is associated with a funding source. Cash flow estimates are done frequently to review cash reserve levels associated with the project funds. City of Elk River, Minnesota Capital Improvement Plan 2008 thru 2012 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2008 2009 2010 2011 2012 Total Activity Center Cooling System Condenser & Controls AC-01 nla 26,000 26,000 Activity Center Total 2s,ooo 2s,ooo Gar~rntnettt Kuildi»tis Ilc~~en,c 26,060 26,000 Activity Center Total 26.000 26,000 -- - - - ~Building & Environmental Vehicle Replacement BZ-01 nla 25,000 52,000 26,000 103,000 Scanning Equipment BZ-02 n/a 30,000 30,000 Building & Environmental Total 30,000 25,000 52,000 26,000 133,000 Capita/ Dutl[lt' Relervc 20,000 25,000 52,000 26,000 123~Op0 General 1~ittttl Operatirt,~ 10'0'00 10'000 Building cPc E~;nvirontnental Total 30,000 25,000 52,000 26,000 133,000 City Hall Chiller Replacement CH-01 nla 70,000 70,000 Boiler Replacement CH-02 nla 25,000 25,000 Vehicle addition CH-04 nla 32,000 32,000 Water Heaters CH-05 nla 8,500 8,500 City Hall Total 110,500 25,000 135,500 General l nud O/~cru/iit~ 32.600 ?2,000 Gnr•ernnrettt 13ttilc/in,~ c Rccc~rvc, ~°~ 506 25,060 10.3.560 Cily Hall Total 110,500 25,000 135,500 -- _ -- -- ~Emergency Management OutdoorWaming Sirens EP-01 nla 14,700 14,900 15,100 15,300 15,500 75,500 Emergency Management Total 14,700 14,900 15,100 15,300 15,500 75,500 2008 CIP .Report Paee 1 Department Project# Priority 2008 2009 2010 2011 2012 Total I:mcr;ertc~t~ .U~rnu•~ttrtettl F~unrl 14,.00 14.900 15.100 15.3u0 15,500 75,500 Emergency Alanagement Total 14,700 14,900 15,100 15,300 15.500 75,500 Equipment Services Large vehicle floor hoist EO-02 n/a 30,000 30,000 Fleet Software EO-03 n/a 35,000 35,000 Equipment Services Total 65,000 65,000 C'rlpital ~)udlll• Kesc~n~e 35.OD0 35,000 Geueru! I un~l Operulit~~r 30.OOG '0,000 Equipment Setvices Totul 65,000 65,000 Finance ~ Software FN-01 n/a 70,000 70,000 Finance Total 70,000 70,000 ('upitnT Duflrtl' Rescue 70,C'~)u 70,004 Finance Total 70:000 70,000 Fire - ~~~ Vehicle Replacement FD-01 nla 40,000 40,000 Fire Truck Replacement -Grass Rigs FD-02 nla 50,000 50,000 Fire Truck Replacement -Tankers FD-04 n/a 26,000 26,000 Fire Truck Replacement -Other FD-05 nla 240,000 240,000 Fire Total 26,000 240,000 50,000 40,000 356,000 C ~zpifrt/ Outluf' Ke'~c~r~'c, 2o,0v0 50,000 4D 00(i 113,000 F_~lui/unenl Ccrlificulcs ?4U 000 240.000 Fire Tolaj 26.000 240,000 50,OD0 40.000 356,000 ;Ice Arena Ice Arena Equipment IA-01 n/a 100,000 100,000 Ice Arena Major Building Repair IA-02 nla 100,000 100,000 Ice Arena Non-Major Building Repair & Maintenance IA-03 nla 55,000 55,000 Ice Arena Lobby Remodel/Expansion IA-04 n/a 2,500,000 2,500,000 Ice Arena Total 100,000 2,600,000 55,000 2,755,000 2008 CJP Report Page 2 Department Project# Priority 2008 2009 2010 2011 2012 Total Capita! Urrtla~~ Reser~~t~ 55.000 55,000 L igtrar l~iutd 100.000 100000 200,000 7uxSttppnrlyd Bend Issue 2,500,000 2.500,000 !ce Arena Total 10D,000 2,6D0,000 55,000 (Infrastructure Improvements 193rd Avenue Extension to CR13 II-18 nla 3,556,500 Trott Brook Road Crossing II-20 n/a Jackson RdlSchool St. Intersection Modifications II-22 n/a 350,000 Main Street Right Turn Lane II-23 nla 175,000 Right tum lane on North Bound Proctor Avenue II-24 nla Detached Trail on 1971198th Avenue II-25 n/a TH10 Parking Lot II-26 nla 80,000 TH 169 Land Acquisition LA-01 n/a Land Acquisition for CSAH 33 LA-02 nla 440,000 Assessable Street Overlay Projects OV-03 n/a 500,000 MainSUJackson Ave Overlay OV-04 nla 430,000 Pavement Management Program PM-01 nla 1,000,000 Annual Street Sealcoat Program SC-02 n/a 120,000 125,000 Street Light Replacement HWY 10 (Downtown Area) SL-04 nla 100,000 Signal Light Painting SL-09 n/a 20,000 Highway 10 GeometriclEnvironmental Study TP-02 n/a 500,000 Infrastructure Improvements Total 6,076,500 1,320,000 680,000 1,805,000 1,465,000 11,346,500 Capital Projetis - ~1ssc~ssutc~nr Keventtc 50o,o0u 550,000 3x0000 1,65o,GOD l~cderal Grantc R56,C~00 590,000 (~f'tlc'r(111'nnd l)pcrutnt; 100.000 110.000 115~G00 1?0,000 125,000 570,000 11ttD(JT C~nnpcrutirc~ /~iutds 25,000 25.000 lltutic~ipa/ Strttc° .1 id 800,Ou0 ED0.000 300 UOD X00,000 485,500 3.655,5;;0 SruK'uul Kesrrrrs 20.0?+J 15000 15,000 15.000 15.000 EO OOU .Special .t ssessnrc tt[s 333,333 416.060 749,948 Strte'1 /ntpru~~cnteat Iles~'rre 1,675.000 523333 83o,b07 i25,D00 3.955,000 7~u.r Supported Band Issttc. 333,334 410667 %50,001 Infrastructure Improvements Total 3,32D,000 2,12D,000 2,476,000 2,605.000 1,950,500 12,471,500 !Library Floor Scrubber LB-02 n/a 5,400 5,400 Library Total 5,400 5,400 L16rur~~ 5,400 5A0~~~ 2,755,000. 3,556,500 250,000 250,000 350,000 175,000 150,000 150,000 225,000 225,000 80,000 250,000 250,000 500,000 440,000 550,000 600,000 1,650,000 430,000 1,250,000 2,250,000 130,000 135,000 140,000 650,000 100,000 20,000 40,000 500,000 2008 CIP Report Paee 3 Department Project# Priority 2008 2009 2010 2011 2012 Total Library TOtaj 5,400 5,400 Liquor Fund -` Northbound Building Maintenance LS-01 n/a 15,000 20,000 67,000 102,000 Liquor Fund Total 15,000 zo,ooo s7,ooo 1oz,ooo Lirtuur Frrtrt! 15 oao zo~aoo 67,000 to2,oo0 Liquor Fund Total 15,000 20,000 67,000 102,000 ~rk Development & Improvement Land Acquisition PF-90 nla 273,542 265,295 238,048 175,412 1,590,000 2,542,297 Big Tooth Ridge Park PR-06 n/a 54,000 54,000 Camp Cozy Park PR-08 n/a 192,333 192,333 Great Northern Trail PR-18 nla 300,000 300,000 Lions Park PR-35 nla 5,000 5,000 Meadowvale Heights PR-38 nla 50,000 65,250 115,250 Orono Park PR~8 nla 295,000 295,000 Woodland Trails Park PR-66 n/a 471,250 471,250 Pazk Development & Improvement Total 323,542 265,295 243,048 475,412 2,667,833 3,975,130 l~~ctlernl Grants 100_QDO 10u OG0 Purh /h~dication 278,542 220,255 154,048 336,412 1,872,833 2,9CD,130 HI)F Pupmetrt itt Lieu of Tars /lesen~e 45,000 45,600 d5 C00 45,000 755,060 915,000 Purk Development & Improvement Total 323,542 265,295 243,048 475;412 2,667.833 3,975,130 Park Maintenance 2009 Park Maintenance Equipment PK-09 nla 66,675 66,675 2010 Park Maintenance Equipment PK-10 n/a 148,470 148,470 2011 Park Maintenance Equipment PK-11 n/a 59,400 59,400 2012 Park Maintenance Equipment PK-12 nla 43,450 43,450 Park Maintenance Total 66,675 148,470 59,400 43,450 317,995 Capiful l)rttltr~~ Resen~c, 65,675 145.470 59,400 43,450 317.595 Yark Muintenance Total 66,675 148,470 59,400 43,450 317,995 Police Marked Squad Replacement & Additions PD-01 nla 99,000 132,000 132,000 99,000 140,000 602,000 Unmarked Squad Replacement & Additions PD-02 nla 21,000 21,000 21,000 21,000 84,000 CSO Vehicle Replacement & Additions PD-03 n/a 25,000 64,000 34,000 123,000 2008 C'tP Report Page 4 Department Project# Priority 2008 2009 2010 2011 2012 Total Police Department -Other Equipment PD-04 nla 19,000 13,000 6,000 6,000 6,000 50,000 In-carvideoequipment PD-05 n/a 18,000 6,000 18,000 24,000 66,000 Police Public Safety Building PD-O6 nla 10,000 10,000 Police Total 171,000 166,000 229,000 144,000 225,000 935,000 (~u/ri~ctl Dutluy Re~c~rv~ 50,OOD 166,000 229,000 144,000 225,000 S23,D00 Gt~nc~rul Fun!! Opc~rulin,g 102,000 102.000 Gn~~crnuteut Krrildirt,,.~ Rcsen~e 10,000 1u,000 Police Total 171,000 166,000 229,000 144,000 225,000 935,000 blic Buildings Concrete floor in cold storage building BL-08 nla 20,000 20,000 Public Buildings Total zo,ooo zo,ooo G~n~~~nr~rurfrt Kuildin„s Rc~srrre 20,00E 2n.Onp Public Buildings Total 20,000 20,000 Sewer Department Lift Station Rehabilitation WW-02 n/a 60,000 50,000 50,000 160,000 Vehicle Replacement WW-06 nla 30,000 30,000 60,000 Upgrade Boiler WW-14 nla 125,000 125,000 Replace Generators WW-15 nla 110,000 110,000 Plant Expansion Master Plan WW-17 n/a 4,300,000 4,300,000 Sewer Lining WW-20 n/a 30,000 30,000 60,000 Sewer Department Total 4,300,000 30,000 215,000 190,000 80,000 4,815,000 Se~t~er Fund 4,300,000 3~J~D00 215-600 190000 80,000 4 015 OG') Setil~er Department Total 4,300,000 30,000 215,000 190,000 80,000 4,815,000 ~Streets~ Vehicle Replacement -pickup trucks ST-01 n/a 85,000 90,000 30,000 205,000 Dump Truck Replacement ST-02 n/a 160,000 185,000 195,000 175,000 210,000 925,000 Heavy Equipment Replacement ST-03 n/a 175,000 200,000 45,000 200,000 620,000 Other Equipment Replacement ST-04 nla 35,000 25,000 50,000 110,000 Public Works Complex ST-09 nla 50,000 50,000 7,000,000 7,100,000 Streets Total 420,000 345,000 7,485,000 300,000 410,000 8,960,000 C'trpitul lurproi~eruc~ut Baurls C~xpital Uutln~~ Keser~~e 3,100.000 3.100,000 335,600 295000 485,u60 .360,000 41U,06G 1,825,DD0 2008 CIP Report Page 5 Department Project# Priority 2008 2009 2010 2011 2012 Total General fiord Uperati~i~ 35,G00 35~0~}0 Gnrerir~nc•nt I3uildiihs Recervc 50,000 50,000 1,900000 2000,000 /.rgnur F~tntrl 2,000,000 2000,000 Streets Total 420,000 345,000 7,485,(?Ofl 300,000 410,000 8,960,000 Technology/Communications Annual Technology Upgrades TC-01 nla 50,000 80,000 50,000 52,500 182,500 415,000 Technology/Communications Total 50,000 80,000 50,000 52,500 182,500 415,000 (.~rrpita! Dutlu~~ Re.~er~~c ~1,OC0 0~ COr 50.000 02,500 102500 85,000 General /~~und Operalin,~ 30.000 O u00 TechnvlogyiCorn~m~nicatio~zs Total 50,000 80,000 50,000 52,500 182,500 415,000 Grand Total 11,782,642 4,978,870 9,432,618 3,091,612 5,222,283 34,508,025 2008 CIP Report Page 6 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # f~C-O1 Project Name Cooling System Condenser & Controls Type Equipment Useful Life 15 yeazs Category Buildings Priority n/a Contact Gary Lore Department Activity Center Description ['he old library building is in need of a new cooling system condenser and controls. Justification the current controls are outdated and in-operatable. Expenditures 2008 2009 2010 2011 2012 Total Equipment 26,000 26,000 Total 26,000 26,000 Funding Sources 2008 2009 2010 2011 2012 Total Government Buildings Reserve 26,000 26,000 Total 26,000 26,000 Page 7 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ject # B~01 ject Name Vehicle Replacement Type Vehicle Priority n/a Useful Life 10 years Contact Building & Env. Admin. Category Vehicles Department Building & Environmental Description Replacement vehicles for building inspectors/environmental division based on 10 year useful life, mileage and general condition. 2009 - 1997 Lumina (expected to be replaced with hybrid vehicle) -Environmental Division 2010 - 1999 Ford Pickup & 2000 Chevy pickup 2012 - 2001 Chevy pickup 2014 - 2004 Dodge pickup Justification Expenditures 2008 2009 2010 2011 2012 Total Vehicles 25,000 52,000 26,000 103,000 Total Funding Sources 2008 25,000 2009 52,000 2010 2011 26,000 2012 103,000 Total Capital Outlay Reserve 25,000 52,000 26,000 103,000 Total 25,000 52,000 26,000 703,000 Page 8 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # $Z-02 Project Name Scanning Equipment Type Equipment Priority n/a Useful Life 25 years Contact Building & Env. Admin. Category Office Equipment Department Building & Environmental Scanning equipment that includes two different size scanners, software and hardware to run the scanning equipment. Justification storing all residential and commercial files for ease and efficiency of retrieval as well as space savings. Expenditures 2008 2009 2010 2011 2012 Total Equipment 30,000 30,000 TOta1 30,000 30,000 Funding Sources 2008 2009 2010 2011 2012 Total Capital Outlay Reserve 20,000 20,000 General Fund Operating 10,000 10,000 TOtal 30,000 30,000 Page 9 Capital Improvement Plan City of Elk River, Minnesota Project # CH-Ol Project Name Chiller Replacement Type Building Useful Life 15 years Category Building Maintenance 2008 thru 2012 Priority n/a Contact Building Maintenance Supv. Department City Hall or TBD - Replace roof top liquor chiller Justification 15 year life expectancy will end in 2009 Expenditures 2008 2009 2010 2011 2012 Total Building Maintenance 70,000 70,000 Total 70,000 ~o,ooo Funding Sources 2008 2009 2010 2011 2012 Total Government Buildings Reserve 70,000 70,000 Total ~o,ooo _ _ __. _ 70,000 Page 10 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # CH-02 Project Name goiter Replacement Type Building Priority n/a Useful Life Unassigned Contact Gary Lore Category Building Maintenance Department City Hall 4 hot water boilers used for heating. Justification These were not replaced during remodeling. Expenditures 2008 2009 2010 2011 2012 Total Building Maintenance 25,000 25,000 Total 25,000 25,000 Funding Sources 2008 2009 2010 2011 2012 Total Government Buildings Reserve 25,000 25,000 Total 25,000 25,000 Page 11 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 sect # CH-04 jest Name Vehicle addition Type Vehicle Priority n/a Useful Life 10 years Contact Building Maintenance Supv. Category Vehicles Department City Hall Description ['his new truck with a plow would be used for various routine equipment hauling, supplies and general maintenance bound the City. In addition, the plow attachment would be used for moving snow at City Hall. Justification The City's 1993 Chevy Blazer was sold in 2007. Expenditures 2008 2009 2010 2011 2012 Total Vehicles 32,000 32,000 TOta1 Funding Sources 32,000 2008 2009 2010 2011 32,000 2012 Total General Fund Operating 32,000 32,000 Total 32,000 32,000 Page 12 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # CH-OS Project Name water Heaters Type Building Useful Life 10 yeazs Category Buildings Description City hall domestic water heaters Priority n/a Contact Gary Lore Department City Hall Justification wer life expectancy which is between 1-0 & 15 years. Expenditures 2008 2009 2010 2011 2012 Total Equipment 8,500 8,500 Total 8,500 8,500 Funding Sources 2008 2009 2010 2011 2012 Total Government Buildings Reserve 8,500 8,500 Total 8,500 8,500 Page 13 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 jest # EP-O1 ject Name Outdoor Warning Sirens Type Equipment Priority n/a Useful Life 15 yeazs Contact Fire Chief Category Equipment Department Emergency Management Description annual Siren Replacement -Old Thunderbeam Sirens ?008 Mississippi Road & Rawlins ?009 - 181st and Fillmore ?010-2014 -Location to be determined Justification Che old Thunderbeam sirens are now becoming a maintenance problem. They are planned to be replaced one per year mtil they are all replaced. Expenditures 2008 2009 2010 2011 2012 Total Equipment 14,700 14,900 15,100 15,300 15,500 .75,500 Total 14,700 14,900 15,100 15,300 15,500 75,500 Funding Sources 2008 2009 2010 2011 2012 Total Emergency Management Fund 14,700 14,900 15,100 15,300 15,500 75,500 Total 14,700 14,900 15,100 15,300 15,500 75,500 Page 14 Capital Improvement Plan City of Elk River, Minnesota ZOOM thru 2012 jest # EQ-02 jest Name Large vehicle floor hoist Type Improvement Priority n/a Useful Life 20 yeazs Contact Engineer Category Shop Equipment Department Equipment Services Description door hoist for larger vehicles in the City's fleet. Justification ~ity currently has no hoist in the mechanics service area capable of lifting the larger vehicles in the fleet while servicing ~r making a repair. Expenditures 2008 2009 2010 2011 2012 Total Equipment 30,000 30,000 Total 30,000 30,000 Funding Sources 2008 2009 2010 2011 2012 Total General Fund Operating 30,000 30,000 Total 30,000 30,000 Page 15 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # EQ-03 Project Name Fleet Software Type Technology Useful Life 20 years Category. Shop Equipment DCSC11pt10II Priority n/a Contact Engineer Department Equipment Services and training to computerize fleet management including repairs, service, parts inventory and scheduling. Justification ~urrent system is all paper with no good way to track the repair cost history of a vehicle or manage inventory and scheduling. The City's fleet committee has made a recommendation that fleet management software be purchased. Expenditures 2008 2009 2010 2011 2012 Total Software 35,000 35,000 TOtsl 35,000 35,000 Funding Sources 2008 2009 2010 2011 2012 Total Capital Outlay Reserve 35,000 35,000 Total 35,000 35,000 Page 16 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # FN-Ol Project Name Software Type Technology Priority n/a Useful Life Unassigned Contact Finance Director Category Technology/Communiciations Department Finance new financial, payroll, and related software as new and improved software becomes available as needs require. Justification The City has a number of computer systems running and various license agreements. When the current financial system (Fund Balance) was initially designed is was tailored for smaller cities and Elk River has grown to a medium size city. A new system will streamline processes, allow scanning of items for data retention, virtual city hall and many more features. Expenditures 2008 2009 2010 2011 2012 Total Equipment 70,000 70,000 Total ~o,ooo ~o,ooo Funding Sources 2008 2009 2010 2011 2012 Total Capital Outlay Reserve 70,000 70,000 Total 70,000 70,000 Page 17 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 jest # FD-Ol jest Name Vehicle Replacement Type Vehicle Useful Life 9 years Category Vehicles Priority n/a Contact Fire Chief Department Fire replace fire chief and inspector vehicles as follows: 012 - SiJV -Inspector 1 017 - SiJV -Inspector 2 013 - SUV -Chief Justification Che fire chief and fire inspector's vehicles are used for everyday general use along with response to emergency ncidents. After a period of 7-9 years, safety for emergency response becomes an issue with the vehicles. Expenditures 2008 2009 2010 2011 2012 Total Vehicles 40,000 40,000 Total Funding Sources 2008 40,000 2009 2010 2011 2012 ao,ooo Total Capital Outlay Reserve 40,000 40,000 Total 40,000 40,000 Page 18 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # FD-02 Project Name Fire Truck Replacement -Grass Rigs Type Equipment Priority n/a Useful Life 15 years Contact Fire Chief Category Vehicles Department Fire Description 3rass Rig replacements as follows: ?011 -Grass Rig 3 ?018 -Grass Rig 2 (repl. 2003) ? 020 -Grass Rig 1 (rep. 2006) Justification The grass rigs are 4X4 1-ton vehicles that are used during emergency response for various responses besides grass fires. The emergency response and safety become a factor during the expected life of the vehicles. Expenditures 2008 2009 2010 2011 2012 Total Vehicles 50,000 50,000 Total 50,000 50,000 Funding Sources 2008 2009 2010 2011 2012 Total Capital Outlay Reserve 50,000 50,000 Total 50,000 50,000 Page 19 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ', Project # FD-04 Project Name Fire Truck Replacement -Tankers Type Vehicle Priority n/a Useful Life 20 years Contact Fire Chief Category Vehicles Department Fire Description ?ire Tanker replacement as follows: ?009 -Tanker 1 -Refurbish (tank only) ?015 -Tanker 2 Justification f possible, tanker 1 will be refurbished (tank only) instead of purchasing a new tanker. Expenditures 2008 2009 2010 2011 2012 Total Vehicles 26,000 26,000 Total Funding Sources 2008 2s,ooo 2009 2010 2011 2s,ooo 2012 Total. Capital Outlay Reserve 26,000 26,000 Total 26,000 26,000 Page 20 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ject # FD-OS ject Name Fire Truck Replacement -Other Type Vehicle Priority n/a Useful Life 25 years Contact Fire Chief Category Vehicles Department Fire Description ether Fire Truck replacement as follows: ?010 -Rescue 1 014 -Aerial Ladder ~ ~ Justification ,,Rescue 1 may be moved to station 2 as part of a change in the department's response with pumpers also serving as rescue units. This enables the designated rescue trucks to become more of an equipment unit. Expenditures 2008 2009 2010 2011 2012 Total Vehicles 240,000 240,000 Total 240,000 240,000 Funding Sources 2008 2009 2010 2011 2012 Total Equipment Certificates 240,000 240,000 Total zao,ooo 2ao,ooo R i~_... ~; - ~~ :-~ . Page 21 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 sect # IA-O1 leer Name Ice Arena Equipment Type Equipment Useful Life Unassigned Category Equipment Description ?008 -Electric Ice Resurfacer Priority n/a Contact Park & Rec. Duector Department Ice Arena Justification Che existing Electric Machine will have over 5,000 hours of use on it, and the back up machine (old blue) will need a najor over haul. By establishing an Ice Resurfacing purchasing plan the Arena will operate smoothly without Inexpected problems arising. Expenditures 2008 2009 2010 2011 2012 Total Vehicles 100,000 100,000 Total 100,000 100,000 Funding Sources 2008 2009 2010 2011 2012 Total Liquor Fund 100,000 100,000 Total 100,000 100,000 Page 22 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 jest # IA-02 iectNan'e Ice Arena Major Building Repair Type Building Useful Life 20 years Category Building Maintenance Description ?009 -Replace Barn roof; Priority n/a Contact Ice Arena Manager Department Ice Arena Justification Che Barn's roof was installed in the early 70's and is well past its life expectancy. The arena is starting to experience several leaks on the south end. Expenditures 2008 2009 2010 2011 2012 Total Buildings 100,000 100,000 Total 100,000 100,000 Funding Sources 2008 2009 2010 2011 2012 Total Liquor Fund 100,000 100,000 Total 100,000 100,000 Page 23 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 jest # IA-03 ject Name Ice Arena Non-Major Building Repair & Maintenance Type Improvement Priority n/a Useful Life Unassigned Contact Park & Rec. Director Category Building Maintenance Department Ice Arena 10 - Re-skin low pressure receivers on ice plants 10 -Replace Co Ray Vac pipes in Barn Justification Che Barn' condenser will be at the end of its life expectancy and should be replaced before any major problems azise. Che Co Ray Vac system that is used in the Barn to heat the bleacher azea is rusting and needs to be replaced. The system is a radiant system that is a series of heaters that are connected by a tube. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 55,000 55,000 Total Funding Sources 2008 55,000 2009 2010 2011 55,000 2012 Total Capital Outlay Reserve 55,000 55,000 Total 55,000 55,000 Page 24 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # jA-04 Project Name Ice Arena Lobby Remodel/Expansion Type Building Priority n/a Useful Life 25 years Contact Ice Arena Manager Category Buildings Department Ice Arena Description Che addition is about 9,500 square feet that includes, the remodeling of the concession stand, updated bathrooms, a neeting room, a larger entrance, storage room, janitor sink area, up-dated office area, skate sharpening room, and an ;xpanded lobby. Justification front portion of the Arena is very small. It consists of a hallway where the bathrooms and concessions are iected. During busy times it is very congested. There is not an area where people can sit down, making it very pealing to eat or enjoy a cup of coffee from the concession stand. Staff meetings have to be held in one of the Boni rooms and Youth Hockey and other customers hold their monthly board meetings off site due to the fact that is no meeting room at the Arena. There is no janitor sink or storage area to store cleaning products in the front making it labor intensive to clean. The office are as well as the skate sharpening room are small and are not Amer friendly. Expenditures 2008 2009 2010 2011 2012 Total Planning/Design 300,000 300,000 Buildings 2,200,000 2,200,000 Total 2,500,000 2,500,000 Funding Sources 2008 2009 2010 2011 2012 Total Tax Supported Bond Issue 2,500,000 2,500,000 Total 2,500,000 2,500,000 Page 25 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 'jest # II-18 eject Name 193rd Avenue Extension to CR13 Type Infrastructure Priority n/a Useful Life 25 years Contact Engineer Category Street Construction Department Infrastructure Improvements Description Extend 193rd Avenue to connect to CSAH 13 to create East/West corridor including land acquisition. Justification Deeded connection according to Transportation Plan Aug 2004 Expenditures 2008 2009 2010 2011 2012 Total Planning/Design 75,000 75,000 Land Acquisition 1,250,000 1,250,000 Construction/Maintenance 2,200,000 2,200,000 Other 31,500 31,500 Total _ __.3,556,500 3,556,500 Funding Sources 2008 2009 2010 2011 2012 Total Federal Grants 996,000 996,000 Municipal State Aid 600,000 600,000 600,000 600,000 285,500 2,685,500 Total 600,000 600,000 1,596,000 600,000 285,500 3,681,500 Page 26 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 jest # II-20 jest Name Trott Brook Road Crossing Type Infrastructure Priority n/a Useful Life 25 yeazs Contact Engineer Category Street Construction Department Infrastructure Improvements Description ~onstruct road crossing (bridge) of Trott Brook between River Park Addition and Twin Lake Estates. Justification Che link will connect three major residential areas, Trott Brook Farms, Twin Lake Estates, and River Park so novements between them do not have to go out on the County road system. It will enhance emergency vehicle access Ind maintenance activities. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 250,000 250,000 Total 250,000 250,000 Funding Sources 2008 2009 2010 2011 2012 Total Street Improvement Reserve 250,000 250,000 Total 250,000 250,000 Page 27 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ', Project # II-22 ', Projeet Name Jackson Rd/School St. Intersection Modifications Type Maintenance Priority n/a Useful Life 20 years Contact Engineer Category Street Maintenance Department Infrastructure Improvements Description Add a southbound right turn lane .from Jackson Road to Westbound School St. Also, add turn arrows to the existing signal system for south bound Jackson Road and west bound School Street Justification JVith increased traffic through the intersection the proposed improvements will help the intersection operate more ;fficiently. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 350,000 350,000 Total Funding Sources 350,000 2008 2009 350,000 2010 2011 2012 Total Street Improvement Reserve 350,000 350,000 Total 350,000 350,000 Page 28 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project# II-23 Project Name Main Street Right Turn Lane Type Infrastmcture Friority n/a Useful Life 20 years Contact Engineer Category Street Maintenance Department Infrastructure Improvements Description ~ Extend the length of existing right turn lanes on Main St at TH 169 Justification At times, the queue of traffic moving through the intersection prohibits right turning vehicles from entering the turn ane. By lengthening the right turn lane this situation will be improved. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 175,000 175,000 Total 175,000 175,000 Funding Sources 2008 2009 2010 2011 2012 Total Street Improvement Reserve 175,000. 175;000 Total 175,000 175,000 Page 29 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ', Project # II-24 Project Name Right turn lane on North Bound Proctor Avenue Type Infrastructure Priority n/a Useful Life 20 years Contact Engineer Category Street Maintenance Department Infrastructure Improvements Description -~Viden North bound Proctor Ave at TH10 to allow right turn lane Justification Widen the road and establishing a right turn lane will allow vehicles to make a right turn on "red" after stopping. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 150,000 150,000 TOt81 150,000 150,000 Funding Sources 2008 2009 2010 2011 2012 Total Street Improvement Reserve 150,000 150,000 Total 150,000 150,000 Page 30 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ject # II-25 ject Name Detached Trail on 197/198th Avenue Type Infrastructure Priority n/a Useful Life 20 years Contact Engineer Category Street Maintenance Department Infrastructure Improvements Description ~onstruct a l Oft wide detached bituminous trail along 197/198th Avenue from TH 169 to Tyler St. Justification ~ detached trail will get pedestrians off of the roadway Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 225,000 225,000 TOtel 225,000 225,000 Funding Sources 2008 2009 ZO10 2011 2012 Total Street Improvement Reserve 225,000 225,000 Total 225,000 225,000 Page 31 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ect # jI-26 ect Name TH10 Parking Lot Type Improvement Priority n/a Useful Life 20 years Contact Engineer Category Street Construction Department Inliastructure Improvements Description [deconstruct bituminous surface, restrip and add lighting to the TH10 parking lot in downtown. Justification Che parking lot along the north side of TH10 is becoming more important with the opening of the two new buildings iowntown. The bituminous surface has deteriorated to the point where reconstruction is the only option. Along with ~estriping, lighting will be added at no cost by the Elk River Municiapl Utilities to provide added safety. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 80,000 80,000 Total Funding Sources so,ooo 2008 2009 80,000 2010 2011 2012 Total Street Improvement Reserve 80,000 80,000 Total so,ooo 80,000 Page 32 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # LA-O1 Project Name TH 169 Land Acquisition Type Land Priority n/a Useful Life Unassigned Contact Engineer Category Street Construction Department Infrastructure Improvements land, whenever possible, for use by MNDOT in the future for expansion of TH169 to a freeway standard. Justification Utilize MNDOT approved (future) geometric layout for chosen alternative for TH169. Acquired land can be used towards the City's future cost participation for improvements on TH 169. Expenditures 2008 2009 2010 2011 2012. Total Land Acquisition 250,000 250,000 500,000 Total Funding Sources 2008 250,000 2009 2010 2011 250,000 2012 500,000 Total Street Improvement Reserve 250,000 250,000 500,000 Total 250,000 250,000 500,000 Page 33 Capital Improvement Plan City of Elk River, Minnesota ZOOS thru 2012 Project # LA-02 Project Name Land Acquisition for CSAH 33 Type Land Priority n/a Useful Life Unassigned Contact Engineer Category Street Construction Department Infrastructure Improvements acquisition for Sherburne County reconstruction/realignment of CSAH 33 from TH169 to east City limits. Justification ~s Sherburne County plans for a realignment of CSAH 33 to eliminate the sharp curves; their cost participation policy •equires the City to acquire the Right of Way. Expenditures 2008 2009 2010 2011 2012 Total Land Acquisition 440,000 440,000 Total 440,000 440,000 Funding Sources 2008 2009 2010 2011 2012 Total Street Improvement Reserve 440,000 440,000 Total 440,000 440,000 Page 34 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # OV-03 Project Name Assessable Street Overlay Projects Type Improvement Priority n/a Useful Life 15 yeazs Contact Engineer Category Street Maintenance Department Infrastructure Improvements Street overlay projects or other street rehabilitation procedures that are assessable to benefitting properties. Justification ~n overlay of streets starting to show surface wear will extend their useful life and postpone the need for a much more ;xpensive reconstruction project. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 500,000 550,000 600,000 1,650,000 TOta1 500,000 550,000 600,000 1,650,000 Funding Sources 2008 2009 2010 2011 2012 Total Capital Projects -Assessment 500,000 550,000 600,000 1,650,000 Total 500,000 550,000 600,000 1,650,000 Page 35 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # OV-04 Project Name MainSt/Jackson Ave Overlay Type Maintenance Priority n/a Useful Life 15 years Contact Engineer Category Street Maintenance Department Infrastructure Improvements Description Milling and overlay of Main St. from TH10 to Lowell Avenue and Jackson Avenue from TH10 to Main Street. The project will also include decorative cross walks and bump outs at Main Street and Jackson Avenue. Justification After the construction activities of two new buildings, a remodeled expanded building and a city park the condition of he streets is poor due to open cuts for utility connects and construction activities. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 430,000. 430,000 Total 430,000 430,000 Funding Sources 2008 2009 2010 2011 2012 Total Street Improvement Reserve 430,000 430,000 Total 430,000 430,000 Page 36 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # pM-O1 Project Name pavement Management Program Type Improvement Useful Life 25 years Category Street & Utility Construction Description Priority n/a Contact Engineer Department Infrastructure Improvements aged and deteriorated streets, water mains, sewer mains, storm drainage, and pedestrian pathways. Justification Method of improvement for aging infrastructure that cannot be rehabilitated by other methods. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 1,000,000 1,250,000 2,250,000 Total 1,000,000 1,250,000 2,250,000 Funding Sources 2008 2009 2010 2011 2012 Total Special Assessments 333,333 416,666 749,999 Street Improvement Reserve 333,333 416,667 750,000 Tax Supported Bond Issue 333,334 416,667 750,001 Total 1,000,000 1,250,000 2,250,000 Page 37 Capital Improvement Plan City of Elk River, Minnesota 2008 thrtd 2012 ', Project # SC-02 Project rra°'e Annual Street Sealcoat Program Type Improvement Priority n/a Useful Life IO years Contact Street Supt. Category Street Maintenance Department Infrastructure Improvements Description Sealcoat streets as identified by Street Superintendent and City Engineer. Justification Method of maintaining the surface condition of the City street infrastructure. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 120,000 125,000 130,000 135,000 140,000 650,000 Total Funding Sources 120,000 2008 125,000 2009 130,000 2010 135,000 2011 740,000 2012 650,000 Total General Fund Operating Sealcoat Reserves 100,000 20,000 110,000 15,000 115,000 15,000 120,000 15,000 125,000 15,000 570,000 80,000 Total 720,000 125,000 130,000 135,000 140,000 650,000 Page 38 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 sect # SL-04 jest Name Street Light Replacement HWY 10 (Downtown Area) Type Maintenance Useful Life 25 years Category Street Maintenance Description Zeplace Highway l O lighting Priority n/a Contact Engineer Department Infrastructure Improvements Justification Che highway lighting is deteriorating and by agreement with MNDOT is the responsibility of the City to replace. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 100,000 100,000 Total 100,000 Funding Sources 2008 2009 2010 2011 2012 Total MnDOT Cooperative Funds 25,000 25,000 Street Improvement Reserve 75,000 75,000. Total 100,000 100,000 100,000 Page 39 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ect # SL-09 ect Name Signal Light Painting Type Improvement Useful Life 20 yeazs Category .Street Maintenance Description 'aint signal systems Priority n/a Contact Engineer Department Infrastructure Improvements Justification according to MNDOT/City signal agreements it is the responsibility of the City to repaint signal systems as needed. -~Vith the age of the signal systems repainting will be required in the foreseeable future. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 20,000 20,000 40,000 Total Funding Sources 2008 20,000 2009 2010 20,000 2011 2012 40,000 Total Street Improvement Reserve 20,000 20,000 40,000 Total 20,000 20,000 40,000 Page 40 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ject # TP-02 ject Name Highway 10 Geometric/Environmental Study Type Study Priority n/a Useful Life Unassigned Contact Engineer. Category Street Construction Department Infrastructure Improvements Description ~ontinue study of TH10 between TH169/101 and Proctor Avenue to obtain chosen alternative and environmental Justification Continuation of MNDOT IRC study of 2002 in downtown area of Elk River. The alternate highway configuration was left unanswered in the IRC study. Expenditures 2008 2009 2010 2011 2012 Total Planning/Design 500,000 500,000 Total 500,000 500,000 Funding Sources 2008 2009 2010 2011 2012 Total Street Improvement Reserve 500,000 500,000 Total 500,000 500,000 Page 41 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 oject # TP-03 oject Name Highway 169 Geometric/Environmental Study Type Study Priority n/a Useful Life Unassigned Contact Engineer Category Street Construction Department Infrastructure Improvements Description ~ontinue of MNDOT study of Hwy 169. Interest free loan being sought from MNDOT. Justification Funding Sources 2008 2009 2010 2011 2012 Total Municipal State Aid 200,000 200,000 200,000 200,000 200,000 1,000,000 Total 200,000 200,000 200,000 200,000 200,000 ~,ooo,ooo Page 42 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ject # LB-02 ject Name Floor Scrubber Type Equipment Useful Life 10 years Category Equipment Description door Scrubber Priority n/a Contact Gary Lore Department Library Justification Co meet cleaning demands in new library and other locations as needed. Expenditures 2008 2009 2010 2011 2012 Total Equipment 5,400 5,400 Funding Sources Total 5,400 2008 2009 2010 2011 5,400 2012 Total Library 5,400 5,400 Z'pta] 5,400 5,400 Page 43 Capital Impmvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # LS-O1 Project Na°'e Northbound Building Maintenance Type Maintenance Priority n/a Useful Life 10 years Contact Liquor Store Manager Category Building Maintenance Department Liquor Fund ~ Description Remodel Restrooms (flooring, fixtures, tile, and paint) - 2009 Remodel checkout/cashwrap/flooring - 2010 Rooftop HVAC - 2012 Refrigeration - 2012 Walkin Cooler display doors - 2012 Justification The remodel and repairs are the original items from when the store opened in 1997. Due to normal course of use and life of the equipment it is critical to replace and remodel in a timely manner. Expenditures 2008 2009 2010 2011 2012 Total Equipment Building Maintenance 15,000 20,000 67,000 67,000 35,000 Total Funding Sources 2008 15,000 2009 20,000 2010 2011 67,000 2012 102,000 Total Liquor Fund 15,000 20,000 67,000 102,000 Total 15,000 20,000 67,000 102,000 Page 44 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 oject # pF-90 oject Name Land Acquisition Type Land Useful Life Unlimited Category Land Description ?006 - Barsody Property ?006 -Pinewood Golf Course ?007 - Malmstrom Property Priority n/a Contact Park & Rec. Director Department Pazk Development & Improve Justification the Malmstrom property is a key parcel that connects the 360 acre Woodland Trails Park to the east, creating access :rom the Brentwood, Ridgewood and Lafayette Woods neighborhoods. This parcel has been a park target in the park naster plan since 1989. Expenditures 2008 2009 2010 2011 2012 Total Land Acquisition 273,542 265,295 238,048 175,412 1,590,000 2,542,297 TOta1 Funding Sources 273,542 2008 265,295 2009 238,048 2010 175,412 2011 1,590,000 2012 2,542,297 Total Park Dedication RDF Payment in Lieu of Tax R 228,542 45,000 220,295 45,000 193,048 45,000 130,412 45,000 795,000 795,000 1,567,297 975,000 Total 273,542 265,295 238,048 175,412 1,590,000 2,542,297 Page 45 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # pR-06 Project Name Big Tooth Ridge Park Type Improvement Priority n/a Useful Life Unassigned Contact Park & Rec. Director Category Park Improvements Department Park Development & Improve Description ?012 Improvements (Wood chip trail, Paved Trail, Entrance sign, Site Amenities, Shelter) Justification ~urrently underutilized park due to lack of trail or entrance marker. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 54,000 54,000 Total Funding Sources 2008 54,000 2009 2010 2011 2012 54,000 Total Park Dedication 54,000 54,000 Total 54,000 54,000 Page 46 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 jest # PR-08 ject Name Camp Cozy Park Type. Improvement Priority n/a Useful Life Unassigned Contact Park & Rec. Director Category Park Improvements Department Park Development & Improve Description ?012 -Construct Parking 20 stalls, Park Identification sign, Play structure, Shelter, Site Amenities Justification 10 acre parcel on the Elk River is a underutilized asset due to lack of parking and amenities. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 192,333 192,333 Total 192,333 192,333 Funding Sources 2008 2009 2010 2011 2012 Total Park Dedication 192,333 192,333 Total 192,333 192,333 Page 47 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # pR-18 Project Name Great Northern Trail Type Improvement Usefnl Life Unassigned Category Park Improvements 11 -North of 33 Justification Priority n/a Contact Park & Rec. Director Department Park Development & Improve ~~ 7i~; i ~ i •~ - { :ion of trail to the city limits. Part of regional trail leading to Princeton, MN. Federal grant money has been for 2011. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 300,000 300,000 Total 300,000 300,000 Funding Sources 2008 2009 2010 2011 2012 Total Federal Grants 100,000 100,000 Park Dedication 200,000 200,000 Total 300,000 300,000 Page 48 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ject # pR-35 ject Name Lions Park Type Improvement Priority n/a Useful Life Unassigned Contact Park & Rec. Director Category Park Improvements Department Park Development & Improve 10 -Lions Park basketball court life of Court, appearance. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 5,000 5,000 TOta1 Funding Sources 2008 5,000 2009 2010 2011 5,000 2012 Total Park Dedication 5,000 5,000 Total 5,000 5,000 Page 49 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # pR-38 Project Name Meadowvale Heights Type Improvement Useful Life Unassigned Category Park Improvements 08 -Playground equipment 12-TBD Priority n/a Contact Park & Rec. Dvector Department Park Development & Improve Justification ~ Nearest play structure is across CR 1 with no good crossing point. Park serves several neighborhoods without play structures. Expenditures 2008 2009 2010 2011 2012 Total Equipment 50,000 65,250 115,250 TOtSl 50,000 65,250 115,250 Funding Sources 2008 2009 2010 2011 2012 Total Park Dedication 50,000 65,250 115,250 Total 50,000 65,250 115,250 Page 50 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 lest # PR-48 feet Name Orono Park Type Improvement Priority n/a Useful Life Unassigned Contact Park & Rec. Director Category Park Improvements Department Park Development & Improve Description X012 -Various improvements such as Splashpad, Parking, Bathroom Justification ~ Orono Park is aging and needs an upgrade. The YMCA project will bring many people to this area and the park is lacking in amenities. Parking lot and roads have all reached the end of their economic life. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 295,000 295,000 Total 295,000 295,000 Funding Sources 2008 2009 2010 2011 2012 Total Park Dedication 295,000 295,000 Total 295,000 295,000 Page 51 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ', Project # pR-66 Project Name Woodland Trails Park Type Improvement Priority n/a Useful Life Unassigned Contact Park & Rec. Director Category Park Improvements Department Park Development & Improve Description ?012 -Interpretive Center, Playground, Sand based pool + bathhouse, Trails, Sign, Interpretive Package Justification Zegional type park has few amenities. Central location makes it ideal for a multifaceted community park. No viable outdoor swimming options in Elk River Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 471,250 471,250 Total 471,250 471,250 Funding Sources 2008 2009 2010 2011 2012 Total Park Dedication 471,250 471,250 Total 471,250 471,250 Page 52 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # PK-09 Project Name 2009 Park Maintenance Equipment Type Equipment Useful Life Unassigned Category Equipment Description 1994 JD 5200 Tractor $51,450 2002 Ski-doo $8,400 1995 John Deere Gator $6,825 Priority n/a Contact Park & Rec. Director Department Park Maintenance Justification The 1994 JD Tractor, has 2,838 hours and 52 Horse power which doesn't have the power needed to run some of the le 2002 Ski-doo is starting to show its age and is not as reliable as it was. Last year, the park department was not able use it at times because of breakdowns. 1995 John Deere Gator is showing its age (1358 hours). The park department uses it for paint striping athletic s. When it has maintenance problems we have no backup. Expenditures 2008 2009 2010 2011 2012 Total Equipment 66,675 66,675 TOt81 66,675 66,675 Funding Sources 2008 2009 2010 2011 2012 Total Capital Outlay Reserve 66,675 66,675 TOtel 66,675 66,675 Page 53 Capital Improvement Plan City of Elk River, Minnesota Project # PK-10 Project 1Vame 2010 Park Maintenance Equipment Type Equipment Useful Life Unassigned Category Equipment Description 1991 4 Wheel Cushman $9,450 2001 Jacobsen 5111 Mower $47,250 1998 Toro GM 328 Mower $18,900 2006 Mower Trailer $4,620 1993 Trackless Sidewalk $68,250 Justification 2008 thru 2012 Priority n/a Contact Park & Rec. Director Department Park Maintenance 1991 4 Wheel Cushman -Showing its age, needs repairs every summer. 2001 Jacobsen 5111 Mower - 2592 hours 1998 Toro GM 328 Mower -Currently has 1670 hours and will be 12 years old, which is high for a mower. 1993 Trackless Sidewalk - If Eastern Developments are added in the next couple of years we would need to use this machine fora 2nd side walk route, where we use this machine for sweeping ice rinks and trails. Expenditures 2008 2009 2010 2011 2012 Total Equipment 148,470 148,470 Total 148,470 148,470 Funding Sources 2008 2009 2010 2011 2012 Total Capital Outlay Reserve 148,470 148,470 TOt81 148,470 148,470 Page 54 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # pK-11 Project Name 2011 Park Maintenance Equipment Type Equipment Useful Life Unassigned Category Equipment Description 1991 Chevy C2500 3/4T Pickup $22,000 1994 Ford F250 Pickup $22,000 1998 4 Wheel Cushman Jr. $15,400 Justification Priority Contact Department 1991 Chevy C2500 -Over 15 year old 1994 Ford F250 Pickup -Over 15 years old 1998 4 Wheel Cushman Jr. -Over 13 years old n/a Park & Rec. Director Park Maintenance Expenditures 2008 2009 2010 2011 2012 Total Equipment 59,400 59,400 Total 59,400 59,400 Funding Sources 2008 2009 2010 2011 2012 Total Capital Outlay Reserve 59,400 59,400 TOtel 59,400 59,400 Page 55 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ', Project # pK-12 Project Name 2012 Park Maintenance Equipment Type Equipment Useful Life Unassigned Category Equipment Description ?002 Dodge Ram 2500 $27,500 ?005 Ski-doo $8,800 ?002 Cub Cadet Utility $7,150 Justification Priority n/a Contact Park & Rec. Director Department Park Maintenance Expenditures 2008 2009 2010 2011 2012 Total Equipment 43,450 43,450 Total Funding Sources 2008 2009 2010 2011 43,450 2012 43,450 Total Capital Outlay Reserve 43,450 43,450 Total 43,450 43,450 Page 56 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ject # PD-Ol ject Name Marked Squad Replacement & Additions Type Vehicle Priority n/a Useful Life 3 years Contact Police Chief Category Vehicles Department Police Description ~ Routine replacement of vehicles at or near 100,000 miles. Includes all equipment and setup. 2008 - 3 replacement 2009 - 4 replacement; 2010 - 3 replacement; 1 new 2011 - 3 replacement 2012 - 4 replacement ~ Justification ~ Annual replacement of vehicles with over 100,000 miles or high miles and excessive main. cost. 2010 addition is to accommodate additional officers/Admin sgt. Expenditures 2008 2009 2010 2011 2012 Total Vehicles 99,000 132,000 132,000 99,000 140,000 602,000 TOta1 Funding Sources 99,000 2008 132,000 2009 132,000 2010 99,000 2011 140,000 2012 602,000 Total Capital Outlay Reserve General Fund Operating 99,000 132,000 132,000 99,000 140,000 503,000 99,000 Total 99,000 132,000 132,000 99,000 140,000 602,000 Page 57 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ', Project # PD-02 ~ Projeet Name Unmarked Squad Replacement & Additions Type Vehicle Useful Life 3 years Category Vehicles 09 - 1 replacement 10 - 1 replacement 11 - 1 replacement 12 - 1 replacement Priority n/a Contact Police Chief Department Police Justification ~ annual replacement of high mileage unmarked vehicles. (100,000 plus or over 7-years old) Expenditures 2008 2009 2010 2011 2012 Total Vehicles 21,000 21,000 21,000 21,000 84,000 Total Funding Sources 2008 21,000 2009 21,000 2010 21,000 2011 21,000 2012 84,000 Total Capital Outlay Reserve 21,000 21,000 21,000 21,000 84,000 Total 21,000 21,000 21,000 21,000 84,000 Page 58 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 jest # pD-03 ject Name CSO Vehicle Replacement & Additions Type Vehicle Useful Life 3 years Category Vehicles Priority n/a Contact Police Chief Department Police Description ~SO vehicle replacement and additions as follows: ?008 -truck ?010 -truck replacement and new truck 012 -truck Justification Annual replacement of vehicles with over 100,000 miles or over 7-years old. Expenditures 2008 2009 2010 2011 2012 Total Vehicles 25,000 64,000 34,000 123,000 Total Funding Sources 25,000 2008 2009 64,000 2010 2011 34,000 2012 123,000 Total Capital Outlay Reserve 25,000 64,000 34,000 123,000 Total 25,000 64,000 34,000 123,000 Page 59 Capital Improvement Plan City of Elk River, Minnesota Project # pD-04 Project Name police Department -Other Equipment Type Equipment Priority n/a Useful Life 5 years Contact Police Chief Category Equipment Department Police 2008 thru 2012 2008 - 3 Mobile Computers 2009 - 2 Mobile Computers 2010 - 1 Mobile Computer 2011 - 1 Mobile Computer 2012 - 1 Mobile Computer Justification Annual replacement of computers that are over 5-7 years old Expenditures 2008 2009 2010 2011 2012 Total Equipment 19,000 13,000 6,000 6,000 6,000 50,000 Total Funding Sources 19,000 2008 13,000 2009 6,000 2010 6,000 2011 6,000 2012 50,000 Total Capital Outlay Reserve General Fund Operating 16,000 3,000 13,000 6,000 6,000 6,000 47,000 3,000 Total 19,000 13,000 6,000 6,000 6,000 50,000 Page 60 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # PD-OS Project Name In-car video equipment Type Equipment Useful Life 5 years Category Equipment Description [n-car video equipment. Priority n/a Contact Police Chief Department Police Justification Phase out of old VHS equipment -going to all digital systems. Systems have a useful life of 5-6 years. Expenditures 2008 2009 2010 2011 2012 Total Equipment 18,000 6,000 18,000 24,000 66,000 TOt81 18,000 6,000 18,000 24,000 66,000 Funding Sources 2008 2009 2010 2011 2012 Total Capital Outlay Reserve 18,000 6,000 18,000 24,000 66,000 Total 18,000 6,000 18,000 24,000 66,000 Page 61 Capital Improvement Plan City of Elk River, Minnesota 2008 rhru 2012 Project # pD-06 Project Name police Public Safety Building Type Improvement Useful Life 20 years Category Buildings Priority n/a Contact Police Chief Department Police Description Phase 1 of completion of 2nd story of the public safety building. Justification Jeed 2-additional offices and work counter for IT staff. They prefer to stay in the public safety building where the Ietwork is located. Adding two officers on the 2nd floor will free up two officers on the main floor. IT currently stores equipment upstairs -having offices nearby increases their efficiency. Expenditures 2008 2009 2010 2011 2012 Total Buildings 10,000 10,000 Total 10,000 10,000 Funding Sources 2008 2009 2010 2011 2012 Total Government Buildings Reserve 10,000 10,000 Total 10,000 10,000 Page 62 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # $L-08 Project Name Concrete floor in cold storage building Type Building Priority n/a Useful Life 20 years Contact Engineer Category Buildings Department Public Buildings Description ~omplete the concrete floor in the cold storage building. Justification due to budget overruns in the initial budget of the cold storage building the concrete floor in the building was not ;ompleted with the original construction. Expenditures 2008 2009 2010 2011 2012 Total Buildings 20,000 20,000 Total 20,000 20,000 Funding Sources 2008 2009 2010 2011. 2012 Total Government Buildings Reserve 20,000 20,000 Total 20,000 20,000 Page 63 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 ;eet # ww-o2 ject Name Lift Station Rehabilitation Type Improvement Useful Life 15 yeazs Category Utilities Priority n/a Contact Engineer Department Sewer Department 10 -Rehab the Xenia Area and Simonet area lift stations 11 -Oldest lib station (Westwood) 12 -Oldest lift station 14 -Oldest lift station Justification Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 60,000 50,000 50,000 160,000 Total so,ooo so,ooo 50,000 1so,ooo Funding Sources 2008 2009 2010 2011 2012 Total Sewer Fund 60,000 50,000 50,000 160,000 Total 60,000 50,000 50,000 160,000 Page 64 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project# WW_06 Project Name Vehicle Replacement Type Vehicle Useful Life 6 years Category Vehicles 10 -pickup replace 2004 truck 12 -pickup replace 2006 truck Priority n/a Contact Chief Wastewater Operator Department Sewer Department Justification annual replacement of vehicles after approximately 6 years. Expenditures 2008 2009 2010 2011 2012 Total Vehicles 30,000 30,000 60,000 Total Funding Sources 2008 30,000 2009 2010 2011 30,000 2012 60,000 Total Sewer Fund 30,000 30,000 60,000 Total 30,000 30,000 60,000 Page 65 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project# WW_14 Project Name Upgrade Boiler Type Equipment Useful Life 15 years Category Equipment DCSCI7ptlOII teplace current boiler for primary digester Justification Priority n/a Contact Chief Wastewater Operator Department Sewer Department Expenditures 2008 2009 2010 2011 2012 Total Equipment 125,000 125,000 Total Funding Sources 2008 125,000 2009 2010 2011 125,000 2012 Total Sewer Fund 125,000 125,000 Tote] 125,000 125,000 Page 66 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # ww_1 rJ Project Name Replace Generators Type Equipment Useful Life 10 years Category Equipment Description [ieplace 5 mobile generators. Justification Expenditures Priority n/a Contact Chief Wastewater Operator Department Sewer Department 2008 2009 2010 2011 2012 Total Equipment 110,000 110,000 Total 110,000 110,000 Funding Sources 2008 2009 2010 2011. 2012 Total Sewer Fund 110,000 110,000 Total 110,000 110,000 Page 67 Capital Improvement Plan 2008 rh,-u 2012 City of Elk River, Minnesota Project # WW_17 Project Name plant Expansion Master Plan Type Improvement Priority n/a Useful Life Unassigned Contact Engineer Category Plant Expansion Department Sewer Department Description Addition of a building and equipment for mercury reduction filter, replacement and expansion of LTV filter equipment, addition of stand by generation equipment sized for the ultimate capacity treatment plant, construction of an additional ;arage stall oversized to house the jet truck and misc. site work. Justification The new mercury filter and expanded iJV filter are in response to the renewal of our 5 year NPDES Permit issued by the VIPCA. The stand by generation equipment is an improvement anticipated in the WWTP master plan. The new garage ;tall is needed for equipment storage and is being oversized to house the existing jet truck which just barely fits into one ~f the current garage stalls. Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 4,300,000 4,300,000 Total 4,300,000 4,300,000 Funding Sources 2008 2009 2010 2011 2012 Total Sewer Fund 4,300,000 4,300,000 Total 4,300,000 4,300,000 Page 68 Capital Improvement Plan City of Elk River, Minnesota ZOOM thru 2012 Project # `7~7~7_20 Project Name Sewer Lining Type Infrastructure Priority n/a Useful Life Unassigned Contact Chief Wastewater Operator Category Utilities Department Sewer Department old sewer lines Justification Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 30,000 30,000 60,000 Total 30,000 30,000 60,000 Funding Sources 2008 2009 2010 2011 2012 Total Sewer Fund 30,000 30,000 60,000 Total 30,000 30,000 60,000 Page 69 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 jest # ST-Ol ject Name Vehicle Replacement -pickup trucks Type Vehicle Useful Life 10 years Category Vehicles Priority n/a Contact Street Supt. Department Streets Description Street department pickup truck replacements. '.009 -Pick up $25K (replaces 1994 FordF150); 1 ton truck $60K '.010 -Pick up $25K (replaces 1993 Dodge Dakota); 1 ton truck $65K '.011 -Pick up $30K (replaces 1998 Ford F150) Justification Expenditures 2008 2009 2010 2011 2012 Total Vehicles 85,000 90,000 30,000 205,000 Total Funding Sources 2008 85,000 2009 90,000 2010 30,000 2011 2012 205,000 Total Capital Outlay Reserve 85,000 90,000 30,000 205,000 Total 85,000 90,000 30,000 ..205,000 Page 70 Capital Improvement Plan City. of Elk River, Minnesota 2008 thru 2012 ;eet # sT-o2 ject Name Dump Truck Replacement Type Equipment Priority n/a Useful Life 15 years Contact Street Supt. Category Heavy Equipment Department Streets Description ~ Dump truck replacement and additions. Includes all plow equipment. 2008 - 1 Single Axle with plow (replaces 223) 2009 - 1 Tandem Axle with plow (replaces 224) 2010 - 1 Tandem Axle with plow (replaces 207) 2011 - 1 One Ton Sign Truck (replaces 225) 2012 - 1 Tandem Axle with plow (addition) Justification Expenditures 2008 2009 2010 2011 2012 Total Equipment 160,000 185,000 195,000 175,000 210,000 925,000 Total Funding Sources 160,000 2008 185,000 2009 195,000 2010 175,000 2011 210,000 2012 925,000 Total Capital Outlay Reserve 160,000 185,000 195,000 175,000 210,000 925,000 TOt81 160,000 185,000 195,000 175,000 210,000 925,000 Page 71 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 jest # ST-03 ject Name Heavy Equipment Replacement Type Equipment Useful Life 15 years Category Vehicles Priority n/a Contact Street Supt. Department Streets Description Heavy Equipment replacements & additions as follows: 2008 -front end loader (replaces 305) -2010 -sweeper (replaces 302) 2011 -skid loader (replaces 056) 2012 -front end loader (replaces 312) Justification Expenditures 2008 2009 2010 2011 2012 Total Equipment 175,000 200,000 45,000 200,000 620,000 Total Funding Sources 175,000 2008 2009 200,000 2010 45,000 2011 200,000 2012 620,000 Total Capital Outlay Reserve 175,000 200,000 45,000 200,000 620,000 Total 175,000 200,000 45,000 200,000 szo,ooo Page 72 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 jest # ST-04 ject Name Other Equipment Replacement Type Equipment Useful Life 10 years Category Equipment Priority n/a Contact Street Supt. Department Streets place other Street Department equipment as follows: 08 -steel roller l OK; skid loader trailer 15K; crack router l OK 09 -cold mi1125k 11 -air compressor SOk (replaces 055); split between parks and streets Justification Expenditures 2008 2009 2010 2011 2012 Total Equipment 35,000 25,000 50,000 110,000 TOte1 Funding Sources 35,000 2008 25,000 2009 2010 50,000 2011 2012 110,000 Total Capital Outlay Reserve General Fund Operating 35,000 25,000 50,000 75,000 35,000 TOte1 35,000 25,000 50,000 110,000 Page 73 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # ST-09 Projeet Name public Works Complex Type Building Useful Life 50 years Category Buildings Description ?ublic Works Expansion Project Justification Priority n/a Contact Street Supt. Department Streets Expenditures 2008 2009 2010 2011 2012 Total Planning/Design 50,000 50,000 100,000 Buildings 7,000,000 7,000,000 Total 50,000 50,000 7,000,000 7,100,000 Funding Sources 2008 2009 2010 2011 2012 Total Capital Improvement Bonds 3,100,000 3,100,000 Government Buildings Reserve 50,000 50,000 1,900,000 2,000,000 Liquor Fund 2,000,000 2,000,000 Total 50,000 50,000 7,000,000 7,100,000 Page 74 Capital Improvement Plan City of Elk River, Minnesota 2008 thru 2012 Project # TC-Ol Project Name Annual Technology Upgrades Type Equipment Useful Life 5 years Category Technology/Communiciations Priority n/a Contact IT Coordinator Department Technology/Communications Description ?008 -Software Maintenance & Server Upgrades ?009 -Software Maintenance, Server Upgrages, and Storage Area Network ?O10 -Software Maintenance & Server Upgrades ?011 -Software Maintenance & Server Upgrades ?012 -Software Maintenance, Server Upgrades, and Phone System Replacement Justification Expenditures 2008 2009 2010 2011 2012 Total Equipment 50,000 80,000 50,000 52,500 182,500 415,000 Total 50,000 80,000 50,000 52,500 182,500 415,000 Funding Sources 2008 2009 2010 2011 2012 Total Capital Outlay Reserve 20,000 80,000 50,000 52,500 182,500 385,000 General Fund Operating 30,000 30,000 Total 50,000 80,000 50,000 52,500 182,500 415,000 Page 75