Loading...
5.1. SR 12-17-2007Elk REQUEST FOR ACTION ~. River To Ci Council Item Number 5.1. Agenda Section Public Works Meeting Date December 17, 2007 Prepared by Ter Maurer, Public Works Director Item Description Consider Resolution Accepting Bid and Authorizing Execution Reviewed by Lori ohnson, Ci Administrator of Contract in the Matter of the Wastewater Treatment Plant Reviewed by Phase II Improvement Action Requested Adoption of the attached resolution accepting the bid of Gridor Construction, Inc. and authorizing the execution of the contract for the Wastewater Treatment Plant Phase II Improvement. Background/Discussion In August, the City Council authorized plans for the Phase II Improvements at the W~UTP. The major components of the project include a new building with a mercury reduction filter, a new garage stall to house the existing jet truck, replacement of the ultraviolet treatment equipment and standby generation to run the entire plant, along with other minor miscellaneous improvements. The original estimate including a 15 percent contingency was $4.3 million. The low bid received by Gridor Construction, Inc. was $3,594,700. There were a total of nine bids received. The following table lists the bidders and the total bid amount. Bidder Amount Gridor Construction, Inc. $3,594,700 ohn T. ones Construction Co. 3,610,000 Ma ne Construction, Inc. 3,689,600 Rice Lake Construction 3,764,000 Sheeh Construction Com an 3,833,300 Munici al Builders, Inc. 3,840,660 Staab Construction Co oration 3,843,000 Madsen- ohnson Co oration 4,028,600 Knutson Construction 4,245,000 Gridor Construction, Inc. has previously successfully completed two major projects at our Wastewater Treatment Plant. Therefore, we are prepared to recommend award to them as the lowest responsible bidder. Financial Impact The total project cost including engineering (approximately $680,000) and project contingency ($180,000) is $4,454,700 (excluding yet to be determined building permit cost). The total project cost will be funded by existing sewer reserves which have been accumulated over the years from Sewer Availability Charges (SAC) payments. Attachments • Resolution Accepting Bid and Authorizing Execution of Contract Action Motion by Second by Vote Follow Up S:\EngineerImprovProj\2007 Improvement Projects\WWT'P Phase II\12 17 07 cc memo.doc RESOLUTION 07- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE WASTEWATER TREATMENT PLANT PHASE II IMPROVEMENT OF 2007 WHEREAS pursuant to a City Council Resolution 07-70, passed at the August 6, 2007 meeting, competitive bids were solicited and received for the Wastewater Treatment Plant Phase II Improvements; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and .determined that Gridor Construction, Inc. is the lowest responsible bidder. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with Gridor Construction, Inc., as is approved by the City Attorney, for the completion of the Wastewater Treatment Plant Phase II Improvements according to the approved plans and specifications designed by City Council Resolution. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract specified above. Passed and adopted this 17~ day of December, 2007. Stephanie A. Klinzing, Mayor ATTEST: Tina Allard, City Clerk •,} •