Loading...
5.5. SR 03-20-1995~lk Ri FROM: Pat Klaers, City Administrator DATE: March 20, 1995 SUBJECT: Concord Street This item may be moved to "Open Mike" as property owners on Concord Street may be present. Attached for your review is the latest update on this project from the City Engineer. This update discusses a neighborhood meeting held this past winter. The City Engineer will be prepared to verbally review the "bare bones" project that could happen on Concord. This would be a 20' gravel driving surface with no drainage improvements and this would be the least expensive project. Also, the City Attorney will be able to address the timing issues for condemning property, the expenses for this process, and issues with defending assessment amounts. • ITEM 5.5. MEMORANDUM V~~ TO: Mayor & City Council 13065 Orono Parkway • P.O. Box 490 • Elk River, MN SS330 • (612) 441-7420 • Fax: (612) 441-7425 DEC 3 ~ ~9s~ NIS ' I'OISi~L1'Itilil EtiGI~EERS 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1.800.888-2923 Fax: 612-644-9446 CIVIL ENGINEERING: ENVIRONMENTAL MUNICIPAL .CANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: ~11NNEAPOIIS PRIOR LAKE December 21, 1994 File: 230-212-53 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: CONCORD STREET Il1~IPROVEMENTS Dear Council Members: On Thursday evening, December 15, 1994, Council Member John Dietz and I attended an informational meeting held at the Nelson residence on Concord Street. The purpose of the meeting was to provide a forum for the neighbors to discuss the proposed street improvement. For your reference, I have attached an exhibit, previously presented, which shows Concord Street and the owners of each individual property. Those in attendance at Thursday's meeting included Madden, Ward, Ostien, Johnson, Zehowski, Schaefer, Nelson, Smith, and Haaland. Those not attending Thursday's meeting included Palmer, Carlson, and Sohns. At the beginning of the meeting, Council Member Dietz and I gave an update on the status of the project. We indicated that the City had made an attempt to acquire easements. As indicated by the attached drawing, there are still seven easements outstanding. We indicated that three of them were not necessary to go forward with the project. Those include McCarty, Johnson, and Zehowski. We did indicate that the other four Ward, Palmer, Carlson, and Sohns were necessary in order for the City to proceed. We told those in attendance that it would be highly unlikely that the City would consider condemnation proceedings against those four properties, since, that is a costly process. The cost of which, would need to be assessed back against the owners of the property on Concord Street. We gave a brief description of the improvement project process, with emphasis on the assessment hearing, and the fact that if there were major appeals to the assessment process, once again, the City could choose to not move forward with the project, rather than take their chances fighting an appeal in the courts. We also briefly discussed the gravel road alternative, which was presented in the feasibility study. We indicated that a gravel road alternative could likely be constructed with a 25-35 % reduction in the assessment to each property. We did indicate that this had not been considered by the entire Council, and if the neighbors were to choose to move forward with a gravel road alternative, it would have to be presented to the City Council for their approval. ST. PAUL WASECA Honorable Mayor and Council Members December 21, 1994 - Page Two The discussion amongst the property owners in attendance indicated that at least three property owners Ward, Carlson, and Sohns are adamantly opposed to any type of public takeover and improvement of the road. One additional property owner, Zehowski had serious questions relative to drainage affecting his property, and the overall need for a public improvement on the road. They never did clearly state whether or not they would stand in opposition to the project. At the time that we left the meeting, it appeared that the neighbors were dead-locked on whether or not to move forward. We indicated that we would prepare this summary of the meeting, and that they could come to some majority conclusion amongst themselves, they should feel free to come back and present their recommendation to the Ciry Council for the Council's consideration and reaction. If you have any questions, or would like me to do any additional work on this project, please do not hesitate to call. Sincerely, • MSA, CONSULTING ENGINEERS ~,~ Te J.~ Maurer P.E. nY TJM:pd Attachment 212-1913.dec 4.° EASEMENTS SIGNED ::::;;: EASEMENTS SIGNED BUT ••••••• RETURNED AT PROPERTY ::::;:: OWNERS REWEST M coi~a~e ~c~s CONCORD STREET EASEMENT STATU S COUNCIL MEET1NG 11 /7/94 ~~ Elk 'ver