Loading...
INFORMATION #3 03-20-1995-~~r ~~ ~~ ity of ~~ MEMORANDUM River TO: Councilmember Dietz lk • FROM: Phil Hals, Street/Park Superintendent DATE: March 20, 1995 SUBJECT: Lion's Park Maintenance Issues In 1993 and 1994, City Street/Park staff mowed the Lion's Park an average of 18 times at an annual cost of $4,914; $1,890 for labor, and $3,024 for equipment, calculated at $12.00 per hour, based on a mower cost of $24,000 depreciated over six years, plus fuel and repairs. The other major contributions by the City for Lion's Park development not counting the LAWCON Grant have been: Ice rink development Ice rink flooding Soil corrections for basketball courts Soil corrections for bandshell Soil corrections for Lion's Shelter 5 The sliding hill has been constructed under City supervision by contractors disposing of material from various projects without direct cost to the City. Enclosed you will find two plans of Lion's Park. Plan number 1 shows areas of the park that are too wet to mow, and areas that are wet but moveable. Plan number 2 shows a proposed waterway system that we feel would eliminate the water problem. The cost would be an estimated $2,000 for dozer rental plus another $2,000 for culverts, grass seed, and geotextile fabric. 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 • • • • r~ LJ • • • •