5.1. PCSR 03-11-2008'' Elk\~~--~-~ REQUEST FOR ACTION ver To Item Number Plannin Commission 5.1 Agenda Section Meeting Date Prepared by Planning Items March 11, 2008 Sheila Cartney, Senior Planner Item Description Reviewed by Request by Great River Energy for a building addition case# erem Barnhart, Plannin Mana er CU 08-05 Reviewed by Action Requested Staff recommends that the Planning Commission recommend approval of the Conditional Use Permit for a building replacement, as illustrated on drawings dated received February 26, 2008, with the following conditions: 1. All comments of the City Engineer's memo dated February 27, 2008 shall be addressed. 2. As a Conditional Use Permit is not a Building Permit, the applicant shall apply for all require permits. 3. A NPDES permit is required prior to final approval of construction drawings. 4. Parking lot landscape be installed as illustrated. 5. Any trees removed for the fire lane shall be replaced on site. Bac kgrou nd/Discussion Amcon Construction is proposing to replace an existing high bay garage area, parking area, and office area, with a 43,000 square foot building of the same nature. This is an update for Great River Energy's campus in Elk River. Attachments • Location Map • Memo from City Engineer dated February 27, 2008. • Applicant's Narrative • Site Plan(s) dated received February 26, 2008 • Architectural Drawing(s) dated received February 26, 2008 General Information Case File: CU 08-OS Page 2 GRh: Addition Amcon Construction A licant Amon Construction (GRE) 60 Day Rule The application has been deemed complete as of February 26, 2008. The City must take action by A ri128, 2008 Re nested Action Conditional Use Permit Location and Size GRE campus east of TH 169. Location Existing Use Land Use Plan Designation Current Zoning Subject GRE Light Industrial I1 Property NOrth Multi family and Light Industrial/Old Town R3 commercial SOUth Commercial ROW C3 East Commercial and Highway Business PUD, BP, C3 office/warehouse West River NA NA Overview The existing high bay garage area and office will be removed as part of this project; one parking stall will be gained with the new building. Applicable Regulations Conditional Use Permit The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: 7. 1Vill not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate ~ncinity or the public health, safety, morals, comfort, convenience orgeneral welfare of the neighborhood or the city. 2. Dill be consistent with the comprehensive plan. 3. 1-Ylill not impede the normal and orderly development and improvement of surrounding vacant property. 4. 1-Ylill be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks and schools; and will not, in particular, create tra~c congestion or interference with tra~c on adjacent and neighboring public thoroughfares. S:\PLANNING MAIN\Case Files\CUP\CU 08-05 GRE addition\PC report.doc Case File: CU 08-05 Page 3 GRE Addition Amcon Construction 5. Will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons or property because of excessive tra~c, noise, smoke, fumes, glare, odors, dust or vibrations. 6. Will not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. 7. 1-iVill fully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license or permit to establish and operate the proposed use in the city. If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. In the review of the standards for CUP as outlined, it appears that the request is consistent with all of these standards. Analysis A 43,000 square foot building is being proposed to replace and existing high bay garage area, the parking lot will also be revised and will consist of 101 parking stalls which is consistent with what is there already with one additional stall. A Conditional Use Permit is required for new buildings on this site. Although the request is to replace an existing building, staff reviews the site for any improvements that may be necessary. The new parking lot configuration plan does not show landscaping in the parking lot. Staff has suggested that some type of landscaping be planted in front of the building to break up the parking lot. The applicant indicated in his correspondence that is not feasible due to truck traffic and maneuvering. With that in mind staff suggests some type of landscaping in the parking lot to break up the parking lot of 101 parking stalls. The building will be finished in precast concrete wall panels to match the other building on the campus. A new fire lane is proposed northwest of the building. Sidewalk and trees will be removed for this drive. Any trees that are removed should be replaced on site. Recommendation Staff recommends approval of the Conditional Use Permit as presented with the five conditions listed. Action Motion by Second by Vote Follow Up S:\PLANNING MAIN\Case Files\CUP\CU 08-05 GRE addition\PC report.doc - __._ ~~ 1 ~~~~~ T~H ~~ ~ ~~TH __ _ _ ~_ z_~ r ,_-- - -_. . ~~' ~' ;,- ~ ~-- ----~ ~, Private Drives ~ ' J' Location Map cry or N El -~.-_. R1Ver Case Number: CU 08-05 GRE \~---- ~~~AMCON DESIGN/BUILD I CONSTRUCTION MANAGEMENT I GENERAL CONTRACTING January 28, 2008 Mr. Jeremy Barnhart, Planning Manager City of Elk River 13065 Orono Pkwy Elk River, MN 55330 Re: Great River Energy Dear Mr. Barnhart: Amcon Construction is proposing to build a 43,000 square foot combination office, garage, and high bay garage area facility on Great River Energy's existing campus in Elk River. The construction process will include the demolition of an existing high bay garage area, parking area, and office area. The proposed site will result in a net gain of (1) one parking stall. There are no proposed signs for this building other than door and parking signage. There are no plans for any building screening. The new facility will be constructed with 12" insulated Fabcon precast panels matching the style and color of the warehouse/garage/office facility built on this campus in 2005. The roof lines will vary in height was the tallest wall panel at 34' which is the same height as the 2005 project. Great River Energy will have 31 employees using this facility during normal working hours. - Should you have any questions or comments, I can be reached at 952-200-4740. Regards, AMC CONSTRUC .ON COMPANY a utson Project Manager 1715 Yankee Doodle Road, Suite 200 I Eagan, Minnesota 55121-1616 I Tel: 651.379.9090 ~ Fax: 651.379.9091 Email: custserv@amconconstruction.com I Website: www.amconconstruction.com MEMO To: Sheila Cartney From: John Anderson Great River Energy Subject: High Bay Addition Date: February 27, 2008 I have reviewed the construction plans dated February 22, 2008 and Storm water management plan dated February 22, 2008 prepared by Hakanson Anderson Inc 1. The plan meets the City of Elk River standards for Storm Water management. 2. A NPDES Construction permit will be required for this work. As part of that permit a Storm Water Pollution Prevention Plan (SWPPP) will be required. The SWPPP should be provided to the City of Elk River for Review prior to submittal to the MPCA. The SWPPP and NPDES permit must be completed prior to issuing a building permit for this work. Also all perimeter controls and construction entrances need to be inplace prior to issuing a building permit for the site. 3. A permit from the Minnesota Department of Health may be required for the relocation of the watermain on the site. 4. Asbuilts and GIS data will be required to be provided to the city of all storm sewer, sanitary sewer, watermain and services installed or modified in conjunction with this project. C:\Users\scartney\AppData\Local\Microsoft\Windows\Temporary Internet Files\OLK1C46\MEM-2-27-08 GRE high bay addn.doc ~~ 3t .~.~ p- ~IvB~ ~~ ~~ L~i ~i ~pY. p m I 4~ ~~~ ~a~ Fi t~ ion _;~`~