Loading...
7.1. SR 03-17-2008REQUEST FOR ACTION To Item Number Ma or and Ci Council 7.1. Agenda Section Meeting Date Prepared by Public Works March 17, 2008 Te Mauxex, Public Works Director Item Description Reviewed by Downtown Overlay and Intersection Geometric Improvements together with the TH 10 Parking Lot Improvement Reviewed by Action Requested Consider adoption of the Resolution Accepting the Bid and Authorizing the Execution of Contract in the Matter of the Downtown Overlay and Intersection Geometric Improvement, combined with the TH 10 Parking Lot Improvement. As directed by the City Council, the concrete in the center of the intersection of Main Street and Jackson Avenue was bid as an altemate; therefore, adoption of the resolution should be specific relative to portions of the project that are being awarded. Background/Discussio n On Wednesday, March 11, 2008, bids were opened fox both improvements. There were a total of seven bids received. The following table provides the bidder, base bid, and alternate bid. A complete bid tabulation is attached. Bidders Base Bid Alternate Bid 1 Astech As halt Surface Technolo 'es $198,912.05 $9,890.50 2 Knife River, Co $205,286.37 7,821.63 3 Hardrives, Inc. $210,774.29 10,500.60 4 North Valle ,Inc. $219,554.06 8,211.00 5 Rum River Contractin Co. $220,941.02 8,826.50 6 Northwest As halt, Inc. $222,662.04 5,168.25 7 American Libe Construction $232,174.84 7,149.55 As you can see from the above table, the alternate bid for the concrete in the center of the intersection is $9,890.50. Further analyzing the base bid, the cost of the paver crosswalks fox all three directions of the intersection are $10,680.75. Park and Recreation Director Bill Maertz asked that concrete curbing he has budgeted around the play area at Meadowvale Park be added to this bid process. It was added as altemate bid #2. The bid price is $3,085.05. Mr. Maertz stated this is well within his budgeted amount and he requested that this also be awarded. Astech Asphalt Surface Technologies has previously successfully completed similar type of paving and concrete projects within the City of Elk River. Therefore, we are prepared to recommend award to them as the lowest responsible bidder. Financial Impact The 2008 CIP has $430,000 programmed for the downtown overlay and intersection geometric improvements, along with $80,000 programmed for the TH 10 parking lot improvements. The total bid submitted by Astech Asphalt Surface Technologies, together with associated overhead, will be significantly under the total budget monies in the CIP. Attachments • Resolution accepting the bid and authorizing the execution of the contract • Bid tabulation Action Motion by Second by Vote Follow Up S:\EngineerImprocProj\2008 Improvement Projects\Main & Jackson-No Hwy10 pkg lot\03 77 08 tt memo.doe RESOLUTION 08- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE DOWNTOWN OVERLAY AND INTERSECTION GEOMETRIC IMPROVEMENT WITH THE TH 10 PARKING LOT IMPROVEMENT OF 2008 WHEREAS pursuant to a City Council Resolution 08-16, passed at the February 19, 2008 meeting, competitive bids were solidted and received for the Downtown Overlay and Intersection Geometric Improvement with the TH 10 Parking Lot Improvement of 2008; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and has detertnined that Astech Asphalt Surface Technologies, is the lowest responsible bidder. NOW, THEREFORE, BE IT RESOLVED by the Ciry CouncIl of the City of Elk River, Minnesota: 1. The Mayor and City Admuustratox are authorized and directed to execute, on behalf of the City, such contract with Astech Asphalt Surface Technologies, as is approved by the City Attorney, for the completion of the Downtown Overlay and Intersection Geometric Improvement with the TH 10 Parking Lot Improvement of 2008, according to the approved plans and specifications designed by City Council Resolution. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract specified above. Passed and adopted this 17*x day of March, 2008. Stephanie A. Klinzing, Mayor ATTEST: Tina Allazd, City Clerk S:\EngineedmprovProj\2(108 improvement Projects\Main & Jackson-No Hwy10 pkg lot\Resolutions\Accept bid authorize contiactdoc HDM CONSULTING ENGIIVEERS, PLC MAIN STREET AND JACKSON AVENUE PROTECT N0.22fit79 BID TABULATION INTERSECTION IMPROVEMENTS ELK RNER, MN l~l MAIN STREET ANU JACKSON AVENUE BDM CONSULTING INGAll~l25, PLC PROTECT N0.226119 HID TABULATION INTERSECTIONIMPROVEMENTS ELK RNER, MN Note: numbers highlighted indifate mathimalical errors on eid farm ~7