Loading...
5.1. PCSR 04-08-2008/,i City of El .-~-. River REQUEST FOR ACTION To Item Number Plannin Commission 5.1 Agenda Section Meeting Date Prepared by Planxun Items Aril 8, 2008 Chris Leeseber ,Park Planner Item Description Reviewed by Request by E&O Tool & Plastics for Conditional Use Permit to erem Barnhart, Plannin Mana er Allow Outdoor Storage (Tanks), Public Hearing -Case No. Reviewed by CU 08-0 Action Requested Staff recommends that the Planning Commission recommend approval of the Above Ground Storage Tank Conditional Use Permit request, as illustrated on drawings dated 3/28/08, with the following conditions: 1. All comments of the Ciry Engineer's memo dated Apri13, 2008 shall be addressed. 2. A 3'-4' undulating berm along the southern property line shall be created with a minimum 3:1 slope. 3. There shall be no access to the Portside subdivision via Naples street. Background/Discussion In February 2008, Portside addition was approved with two buildable lots. There are currently two separate projects the Ciry is reviewing, one fox each lot. This proposal (on Lot 2) requires a Conditional Use Permit as it has outdoor storage tanks, while the other proposal (on Lot 1) is an administrative review. Attachments • Location Map • Memo from City Engineer dated April 3, 2008 • Applicant's Narrative • Memo from Environmental Technician dated March 4, 2008 • Site Plan(s) • Architectural Drawing(s) Case File: CU 08-07 Page 2 General Information E&O Tool ]ay Caswell Applicant E&O Tool -Jay Caswell 60 Day Rule The application has been deemed complete as of March 6 2008. The City must take action by A ril 25, 2008 Requested Action Above Ground Storage Tank Conditional Use Pernut Location and Size Approximately 7.3-acres west of County Courthouse. Location Existing Use Land Use Plan Designation Current Zoning Subject Property Vacant Light Industrial BP-Business Park North Right-of--way Urban Residential R1b-Residential South Residential Urban Residential R1b-Residential East Industrial Light Industrial BP-Business Park West Sherburne County Public/Semi Public BP-Business Park Overview The applicant will be constructing a 56,000-square foot facility on Lot 2 of Portside Addition. Two above ground storage tanks are needed for the operation of their business. The Business Park Zoning District requires a Conditional Use Permit for above ground storage tanksn Other than the proposed storage tanks, the proposed use is consistent with a permitted use on the BP zoning district. Applicable Regulations Conditional Use Permit The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: 7. Will not endanger, injury or detrimentally affect the use and enjoyment of otherproperty in the immediate vicinity or the public health, safety, morals, comfort, convenience orgeneral welfare of the neighborhood or the ~y. 2. I-Vill be consistent with the comprehensive plan. 3. lYlill not impede the normal and orderly development and improvement of surrounding vacant property. 4. I-Ylill be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks and schools; and S:\PLANNING MAIN\Case Files\CUP\CU 08-07 E&O Tool\CU 08-07_PC.doc Case File: CU 08-07 Page 3 E&O Tool Jay Caswell will not, in particular, create traffic congestion or interference with tra~c on adjacent and neighboring public thoroughfares 5. mill not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons or propery because of excessive tra~c, noise, smoke, fumes, glare, odors, dust or vibrations. 6. 1Vill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. 7. Weill fully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license or permit to establish and operate the proposed use in the city. If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. In the review of the standards for CUP as outlined, it appears that the request is consistent with all of these standards. Analysis The two above ground storage tanks are 12-feet in diameter and 24-feet tall which is 4-feet shorter than the shortest portion of the building. The two tanks are proposed to be located on the east side of the building. The tanks will be painted? The tanks will be screened by the building from most of the properties of the Sandpiper Estates. The Country Crossing Town home area, which is east of the proposed building, will not be screened by the building. Staff is recommending berming to help further screen the tanks from the residential areas. Based on the possible future expansion area and view angles, the building will provide additional screening from Sandpiper Estates. Building design: Comprehensive Plan The Comprehensive Plan designates this area as Light Industrial. The Light Industrial category includes industrial uses that are lower in intensity of activity. These uses limit the potential for adverse impacts on adjacent land uses due to factors such as noise and odor. Examples of Light Industrial uses include offices, enclosed storage and warehousing, research laboratories and light manufacturing. Transportation Access to the site will be off of Business Center Drive at two locations; one near the east property line, the other near the west property line. Staff reviewed the number of access along BCD, but felt that shaming of drives was unnecessary due to the lack of conflicting movements across the street, S:\PLANNING MAIN\Case Files\CUP\CU 08-07 E&O Tool\CU 08-07_PC.doc Case File: CU OS-U7 Page 4 E&0 Tool )ay Caswell The cul-de-sac at the north end of Naples Street will be removed from the property. Naples Street will dead end at the property line and will have no access to the subject property. No new cul-de-sac will be rebuilt. Grading/Drainage Grading, Drainage and Utilities are addressed in the City Engineer's memo dated Apri13, 2008. Landscaping Generally, the largest concerns in developments adjacent to residential include concerns with noise, light, and traffic. As noted above, no access is provided to the residential development. To alleviate light and noise, staff is recommending a a low berm and substantial landscaping. A low berm would provide year round interest, but will not be substantial enough to provide adequate screening. Significant landscaping: a mix of coniferous, ornamental, and overstory (shade) will help buffer the industrial component of the building from the established residential properties to the south. The required number of proposed trees meets the ordinance requirements. To help buffer the proposed building for the adjacent residential neighborhood, staff recommends that a 3'-4' undulating berm along the southern property line shall be created with a minimum 3:1 slope. The berm should have a majority of coniferous trees but provide a mix of ornamental also. This may require reordering of the proposed trees. The berm shall be designed so it does not create any potential flooding on the adjacent properties. If there is a potential for flooding, it may be appropriate to provide breaks in the berm. The Bern design recommendation from staff is consistent with the recommendation to the property to the west, and is being incorporated into the plans. Action Motion by Second by Vote Follow Up S:\PLANNING MAIN\Case Files\CUP\CU 08-07 E&O Tool\CU 08-07_PC.doc 'SITE ~~ ,~~ ~, 4 ~ ~r fi ~ ~,, Private Drives ~ Location Map N cty or El -.~. R1Ver Case Number: CU 08-07 E&O TOOL G City E t~ver MEMORANDUM TO: Chris Leeseberg, Planner FROM: Terry Maurer, Public April 3, 2008 Works Director , DATE: SUBJECT: E&O Tool and Plastics Revised Site Plan Review 226-195P As requested, I have reviewed the revised final Portside Addition and the revised site plans for the E&O Tool and Plastics facilityto be located on Lot 2, Portside Addition. The revised plans were dated March 26, 2008. Based upon our review, I believe all the necessary easements have been added or revised on the final plat and therefore the final plat should be approvable from an engineering standpoint. The site plan has been revised to include or correct the comments that were made in my earlier memo dated March 10, 2008. There are still a few items that cannot be corrected on the site plan but must be accomplished prior to construction, such as the NPDES permit and the Stormwater Pollution Prevention Plan. Also, the note added about rip-rap at the storm sewer end section does not meet the City standards for the class of rip-rap. This also can be corrected in the final construction plans. The watermain encircling the building should be looped with the Metalcraft site to the west (lot 1 Portside Addition) to provide for a better system. Also, watermains on the south side of the building should be moved out of the future expansion area to eluiunate the need to relocate it in the future. Finally, hydrant locations will need to be approved bythe fire chief in the final design phase, prior to construction. Finally, record drawings need to be provided at the conclusion of the construction along with GIS data on the constructed utilities including field-surveyed locations of water, storm sewer and sanitary sewer (X, Y, Z) on the county coordinates system. If you have any questions regarding any of these comments, please contact me. S:Engineering/04 03 08 E&OToolandPlasticsRevisedSitePlan.doc E & O Tool & Plastics, lac. Complete Tooling & Molding Capabilities ISO 9001 • 2000 Registered 19178 Industrial Blvd., Elk River, MN 55330 (763) 441-6100 • Fax (763) 441-6452 E & O Conditional Use Permit Narrative E&O Tool and Plastics seeks to construct a modern manufacturing facility that will allow them the ability to compete in the highly competitive medical device market. The building will serve as the new headquarters and will house all domestic operations for the company. The SS,000sq ft facility will be of tilt-up construction with material and reveal patterns to give the appearance of a varied and architecturally pleasing structure. Wall heights vary from 28 to 32 ft, with a prominent glass entry in the NW corner of the building which will face the entry of the Metal Craft building. E & O will have signage on the buildings north elevation facing Hwy 10, and will provide 97 parking spaces on the sites north side with 2 access points on to Business Center Drive for the approximately 125 employees that operate the company presses 24 hours per day, 7 days per week. The building will also have 6 docks, and 1 drive in door, 2 material storage silos, and 1 chiller cooling unit all of which are on the east side of the building facing Faribault Foods. The 2 silos stand approximately 30 ft high. The chiller unit stands approximately 13 feet high. The silos and the chiller unit are located adjacent to the building on the east side. The silos are for material storage only. The material is pumped into the silos via vacuum pump so there is no external mess. There is also no fumes or odiferous result associated with either the silos or the chiller. Silos are typically filled during day hours between 8:OOam and S:OOpm and will be screened from view to residents on the south by a row of evergreens as shown in the landscape plan. Thank you for your consideration. Sincerely, Jay Caswell CFO /Partner E & O Tool and Plastics, Inc. t~~,ll, ~p ~„ ~~ c~~~ ,~- ~~~ ~ ~~ ~. ~,~ti. ~- tver MEMORANDUM TO: Chris Leesberg, Planner FROM: Nicola Blake-Bradley, Environmental Technician DATE: March 4, 2008 SUBJECT: Concerns regarding the Site Plan Reviews for: E8~0 Tool Outdoor Storage - 0008-07 Metal Craff - SP08-04 During review of the plans for each of the items listed above (E&O Tool and Metal Craft), two items of concern were noted for each site. The following concerns were identified: Due to the amount of grading and excavation that will occur on each of the sites, an NPDES (National Pollutant Discharge Elimination System) permit will be necessary for each project with a SWPPP (Storm Water Pollution Prevention Plan). The NPDES permit map be obtained from the Minnesota Pollution Control Agency prior to or concurrent with application to the City, but must be obtained prior to any grading taking place on the project. 2. The City's Archaeological Model indicates a moderate to high potential for an archaeological site in both project areas. Staff recommends that the standard condition listed below is placed upon each request: a. "Any item or condition found that indicates the site is likely to yield information important to prehistory or history shall be reported to the City immediately. Further, the City reserves the right to stop work authorized in its approval until the site is appropriately investigated and work is authorized to continue by the City." O:\Lentl Prolecto\8722-11\dwg\PREL18722-11 ~PSITE.dwg, PSITE, 3/2&2008 11:14:39 AM, DMGean D I I~'. - 6 I J I ~m m~ I - c ~ I x~ o ~_Il O I'E ------= 1 i Zo rJ I o ~ ~ II ~ - G1 m X _ Z -I m I ~ I ~ /~ .'; o ~ -: ' , e - ~ - o D ~ A~ ~o z o _ rTl I O ~ I ly ~rW~ I ' I I ~m ~\ / .~ •" I -- ~,~ I ~ I fn T r/' ~ ~ rTl \-~ _ ~- .-- 1 ~ :; ~ I I; ° m rTn Z I ,~ _ y I I / ' T -- i .~~ N00°55'43"W 557.37 /„/ ~~ ~ ~ o I l , \-~ I .- ( ~ ~- _ ------------ e ~ ,~ I ~-~ mh ~ ; _- I rrl-I-I-I-1111ZZZTTTT 'i-r~P~~~i ~ "s ; ~ TTT I IIII ~ IIIIIIIIIIIIIII~IIIIIIIIIIIIII I I I I I I I I I I I I I I INI I I I f0 I I I t I I I I o - - '~ I> Ins z ~' r r , m ~,': - V I I /'': f.i'+ ~- I ~..~~~~' I I .~ v>1~~~" "' ~.. ~L',y Vt;i~' `, t.n . J . ,. hi'i'a 1 1" f I .. I o ~~ mlm mw Ps, - `' I - :~ ~ 0 3 1~>• A °, __ ~~ ~ ~ I I I I I 11 1 I ~I ~. I I I II I I I I I I I I / 1'~ I I I I I I I I nl l I I I I I I I I I I I I I I I I I I I I I .: a\ e ° _ / ~-~~~ / L1=1_1 IJJJJ 1 111 l-L J_LLLLLI I_I I-I ~ Q i - \ ~ I _ _ _ _ \ J i ~r-, -- Exlsrl~- ' I , I ------- r- I I I I " p I >+ r - - I - ~ `.\ \ . .\:\ ` . , ,.-~. ~ l\`.\ ~ ~ \ ~ \~ \ ~ ~ ..,~ ~ a~ ae s - T I BUII DING t ~~ d ' l ; ~ ~ .,- _ - - - - 89.4 _ I I ~ \ - T J I I I t o ~ 4 i I I I I I C I ~ ~ I IN I I I ' p ~ .: ~~ ~ - - CA ~ I 224.4' ~~`~ ? -A ` \ ~ 225.0' ~ NAPLES rn _ I I I 9 ~ ~ ' ~,K ~ O10 ~° '" m " ` R'tun ohs ~~ ~ ~ ,~: v \ a ~ h DO ~ _ _ - _ .I ~ I I r ~ ' to ~ \ 107 9' I STREE~ N. VV. I /~ I ~ ~ c ,~} : ` - ~ ~ r \ ~ . ~ ~ 1 W 7 ~ I I I ~ ' ~ I 7 ~~~ ~~ I `.~ o ~ H ~ 3 s' ~ - _1___ EXISTING , BUILDING III el I I ~ °I m 1 , ~yy,, ~ 11: ~ ';: \ ~ N Z ~ .~' \ . 21.5 30.4 1. ' o L-----f l I v ~ \~ \ l I~~ gl , i~ ~~ \~ ° . € ~- ? I i INI ul h~f::~ \ ~\\'~ ~\\\ ]~ 1 A\n \~F`~\I~~~ is ~ ~ \~~\.~:\ `. ~ ' w .: I ~ ~ I ~~ -------- ~ ; I . _ .. . 9.0 o I I ; ~ : --, _v I I III ~ '-. ;: ~, m I~ _ - a = -- ~ r T , ~~c; I~ 12 • Im c ma i-, - I I ~~ ~ /IZ / o o "~'~ I I I'i ~ U ~ ~ ~ p _ ~~ ~ 8G - _ . I~~x ~.' I ~ °a _ I~ / I L~ I w - -- L__ g---- ---- _-- --------- - -- - - _- ---- --- __ ----- - _---__-- ---~~2-f~~ -___-- - I n _ _ --_=7 m ~ O . _ N00°35'51"W 557.66 ~ ~ Do o ~_ Etlge of Gras s _ J - - , ~ - _ - \ / \ I~ I-1-r\ \ / \ r\ r ` ( J > 1 t= _ / ~ -- ~~ f'r 1-i L I 1 I ~/ •/ I I I \ I 1 f ! Y •/ I v I I \ I f r 1 I ~/ I 1 •/ ~/ ~/ I I \ I I - I v •/ LJ \/ ~/ I I - i / v L- ~/ ~/ _ • r'- A I ~,~ r- r\ 'I~ I l l r\ r~ A r r I -I- I /\ A I , ` -~ 4\~ Jn~ 2 )~ --\ ~ \/ D•-I\I 11--F( L_ 1 v 1 L- I \ I f~IF(I I ~\1 I 1 I I I \ L/ /-\ L 11 I II II\I 11 / L/ I I 1 \/ I • a\ ~ ~~ -- ~ \ '~ \~ . . 1~ I A m 0 m q TX Z ~,-~ ~~-DDDD-~}--DDDD r~-... --120-29 --~ 1 cx ~~ 2z ~~ I I I I ~~ I lol I' I joI ~® / ` / // / m I ~ / I // -DD- ~rDD / // / ~ / 1]B Im X o ~ I ~~~~ ~~'i' 1 ~ j/ j ~ ° I / / ~/ ... n' ~~ \\ /,/ "+ / / ~/ = ~:/ rn ~ y~i° ~ '^` ~l5 R .r .1 i N ~ N \~ Z ~' _ ~a ~ tvo~ f _ o a S{ ~ A A { Troy St. n N m Ul m " S o ~ ' _ z ~ m rn m ~ ~ OU< n 51. s _ ~ 4 '~ -I Ogden+ Q'~ 3 A vaeca o..' o y ~Sl. NW I\ o < ti z n " ~~ >- q a v a No les St. NW N° lea Joplin 51. NW ~~~0~_ ~, K ~ ~ ~~ ~ r : IX~~. >k~ ~~ r > ; r i ~ ` ,'r D ltl N ~ . ' ~ ~ ~ ~ ~ P ~ ~ G~ 0 ~ ~ n o~~ Cd 0 m cn b d ~ lp D w ~ G ~ 'w. ~ w. ~ 5 ~. n a y x~ % ~' n 0 7 r m n p o 0 5. rn 4 R ~, ... .-, 7 0 n 2 zo-3 z ~a x l7 c ~ ~n~ M~ a w C u z a O iv O 0 3 H rn LOT 2, BLOCK I, PORTSIDE ADDITION John Oliver & Associates, ~/~~.'. I here Y certify that this pion, specif- catio report was prepared by me DATE: 02 25 OS REV NO. DATE DESCRIPTION ti ELK RIVER MN ci./a a,.g,,,«ra.g, ~°.w, sti.,-I,<yi..g, tons Pw..ni,.g or nde~ direct supervision and DESIGN BY: LPC DLC 1 3 26 08 CITY COMMENTS z , 580 Dodqe Avenue that I Err{ I Licensed Professional Y DRAWN BY: DM o p FOR E[k River, Minnesota 55330 Engineer u Std e of Minnesota ~ ~' '763-441-2072 FAX 763-441-5665 Statutes Sectio 326.15. ~j~ CHECKED BY: WJM E & 0 TOOL & PLASTICS INC. , / f I \ , Offices in: E[k River & Burnsvi[[e, MN V Signature: DWG: 8722-1 1-PSITE.dw NON J PRELIMINARY SITE PLAN xXxXX x. xXxXxX, P TEXT: E Date: XX/XX/XXXX Lic. No. XX XX FILE NO.: 8722.11-03 I~ i ~I~ ~ a __ g4c~ I 4 - 0 0 0 0 0 z = z m z L~ ., O O O y 0 0 U 0 I ~; C; ~ ~' ~ ",' m k X m m m m X i `" ~`^I ` i`^i `-i `-~ i ~ z ~ ~ ~ c c~ i r ~ 2 Z Z i n v n ~ ~ a ,_ ' i << n n x m ~ m n m 2 ~1 A n ~ C ~ ~' z ~ -, ~ m 2 O a~< 3 ^ n 2 W o ~- z C y n ~ L, J G L "~D o ~ r m Z 0 Jm~t~1 ~ aFOy ti Q6g Ib~ o O{ g~g R~ O 1'!~>R° ^ vii ~ ~ „ ~ oPF{ ,0 ~ F 41 3 .^ ~ y M ... ~ ~ ~ ~ ~ ~~~ a~ 'i ,~ AO ~ I ~° ~~ o I r ,,~ _. O I I I I I l l I I ~ C I ,,; ~ f ~ ~ I %, ~., ~ Z '1,. I ~ ( -, ,__~ l ~ ~L, I =; 1 ~ _-; I I m ~:. a T , r"~I I .ZI w / ~I_ =w 111 I i1! ~I /, ~ O~ I ~ NI O Imo ` rrrl-I-Ir-1-I~-1=rc~~-T=-rT- - ~~~'~ m '~~\ ~1S'1r~ ~---------- ~ ~~ 'llllllllllllllllllllllllllllll '~ m I I I I I I I I, I I I I I I I I I I I b I i l l l l l l r r ~ ?~~ II ft ` l,hk,-~~.~s},: '~'~..t , a~ lht)~'~i ~ >Yi~, m o ~, 3 I V I I it lit ` l l I{ A \ r? -1~. i%~i °I ~ I I I I I I I I I }~I 1 1 1 1 1 1 ml 1 1 1 1 1 1 1 .1 ~ {I ~I J II I I I I I I I I ~ Yi'' I I I I I I I I I I I I I I I I I I v R P ~qJ i-_ --, LI_I 11-IJJJJ 1111 LLLLLLLLLLLI I_I pO0 RN _- I ~r'r >~% - ~ 'oo I r---==_-- -- VC ~ / I ~` t \~\ I/ ~ ~0 s I r r n Q I I jl`~~ fll ~';, l' I I~ 1 I~,~ N I i>, f V 1 O z.\ a, -4 - - ~.l I t r~. ~ O . APLES ~ ~ O I Y - Q D 1t 0'~ 1 ~ mm ~ ~\~~ ~p l11 r N l ,1 N m ~ 11 \ N O ~ ~ I ~ I I~'~ ~ O N n wo\\` ~ O ~ I I I I l! i; r \ ~ '~\` OD pN _I_ _ _ ~ I a,' .~~ N Z v\ BUILGING V~" ~ al r ~ \ \\ I \ I ~. I I 1 L-------- ~ -- 1 \ .. r I~ ~~ V~ ~~~ O o1Nn ~ I \I m 11IJ h` .. - ~ ~~ ~ ~}~~ O I --~ y'L2+. ~~b's~ O e ~Iw ,..\ p I a0 b ~~ 1 1 1 L:\ .f(J N 0 0 \/ I SIN III" O \../ Flu /'v v"rv~~~,ryy~.. I v/vwv~ J ,,io ,io 1'~0 '~ ~ / a n n m - - ;IN rlw ~ J ~~ I Edge of Grass J _ -- ~ 1 1 1 1 1% 1 i H! Y I` h l 1 1 I I\ 1~ ~- ~ <~ I~ 4-4> 1 ~- i _. / .i .. 1 v 1 I~ I --•i 11`r .'r I I • .. -- v v .i I I ~ ~ Q'''JC, I . r - . - ` I ~a .... 1 h- 1\I I h- F! I h~ I r! I \I l~\ 1 `I i `I I I I I `I 1\I a __ __\ •i ~_ I v l v- 1 ~ ' r 111 ~ ~i I-~ ~i li 1 1 1 •i ' v // \\\ ~ I m ~O® / N n n A I fpm o0 ~ A~ - ~ I I 1 u I ~ I H N 0 ~o zo ono ~°a `~ O ; N WOS n~Z~D ~ f ~ ~ ~n~ ; I I y on rAN~ m2 c m _ m I~i ~ ~W ° Q D°~O nDy ZNr 0~2 j ~F~ y x F~ Dy~eJA w yo i ~ ~ ~y C ~ 1 O~ ~ ~ ~ZO~ ~~OO ~~ ~ V Q ~ °° -D 1'l to -Ix O ~~ Q ~~ ° -i °~O ~N--° ~< to D ° R° Z ° z o~z v ~ m~A z s g ° A ~ n~ ~o °~ z ~~ ~~ ~ S~ o r o m ~ ~ ~ m ~m ~ z~ - - ~ ~O _ I ~ v_ x m ~ ~ ~ -~- ~ ~ -1 A :U O O .A .1) O p 0 o ~ m ~ 1 ~~\~, ud c> 3'-0" MIN. 3'-0" MIN. ~ \ \ \ ~~o~ og °- n; ?~ ~ °ow°oI\I$1 \l~ v~~o~~nn\l~ n~~~~~ °m~D~ $ ~o~ i Om~~ CN X ~twn °° +~ ~m ~N ~ ~~O?-VN DC~G]~w ~~~ f N~m N C° mCm ~ ~C ~g B NCH bbb ~zz,,OD~~ Z2AOV~ ~~ ~ ~O~ ~O~nn g~ B~ x~ coin s ~Fo ° io~~'o? c^upi~x kc=i ~ os 6 ~`^F°~ ° uQ sA ~ _ °~ =~ <z °O~,j - ur yip I ~~ R ~°~m ~~ ~~ ° ti °~~ H yDy U~~Z° /]~f ~n~~ fly _ y~y > SZ~ A N °~ ~ n~4~~ ~~~ ~m N 1)Z° ~m; x ~° ° ~P•°•Ow °z ~ A ~ ~~ 9 ~* x ~-1w ~O N m Dy f m' m ~ v~5 \ ulm ~ z~ _ ~zo n i> N _ m ~_ ~o ~~ ~~~~ ~~^~ ~ ~ ~ O ~ V ~ ~~= 8= NA m ° ~ ~ ° ~° ~~ q ~-I~ o~kii m °~ ~~ ~ V z In ~ ~ O ~ ~ z 5 ~oo ~ Vl O Q m m~ N 0 ]! ~ ! ~ 1 ly m V I ° N ~ ~ m x m A ~ V Q_ m~ ~m ° m~> A Z~ ~ I-I+ O y> b ~ N ° O y 2~ r OZ yA ~ ~ m F~ m ~ ~ ~ ~ ~ ~ ° m ° z 0 q ~ 02Z ff ~ O ~ n D m A ~~SCoJ ~o i ~ ;you ~ _~ fm~l~ OO ~ ~ y O m I~j~ T ~ ~~ OO ~ C O~ mm.~U ~A A 5 A ~ m~ Q ~ o z~ ~ Q ~ ~c o ~ m 8 c ~ goo mm~ ~ czi y °z F xr~ ° °m ~ z 8 o$°SF Z N y ~ A ~ o ~ ~ "O C m Z x m w ~ z ~ z 0 zvAUl ~ F ~ x o ~ m ° n °5om.. po~~ o~ oomA ~B~o~ ~ °f~" y~`~ ~xA ~ ~° ~ ~ 9 ti NO ~Z A~ mm UI 8ci~ z~ ~ ~xom ~ E m m~~y ~~ hoc' mp}( ~c~ ~"°'>~!>>"~Bp o ~pOZ ° p~ r~~2~ ~ oZ° Z°~ Vlz x A N ° ° N c s ~i ucmi ~-Y~~~ ~ ~z° ~o~z m Dg 01.1y >> xN° Z N ;O° m0 '9r Z N ~A A m ~ opo ~f DA ~ ~ vYo ~~ ~jm ~~nn ~~ m ~ o l mo Drn ~ o~ ~ '1° o ~~^ ° ~ 9g4~ ~ m~~m m ~~ I ~~ ~ s ~' m~ ~~~~ m<_° ~ ~ ~~ ~~Fs z ° i 8 yzm ~_ ~ ~z ~~~~ ~ ~ ~~ ~ F ~ ~ < ~ ° \ A ~ ~ !°mn A N K Z2 ~ ~ ~(<O1 ~3'yO1C° Z O ~O ZN 2O m sL ~1A~N ~ ~ >~ K A VI ° o m 1': O ° m~ N °~ 4Nm~ o ~ z ~, m g ~ In o ~~ ~ m ~~ m~cmiz 6' ~ ~ c? 3;x o ° ~i ocmc~~ yy ~ czi On ~ A E ° A x S °;off Fi m ~ K~g~ ~ N o ~ TI f = = Z D m G<D jv c~il0 ZO n0 D~ Cm~ ma ~n0 ~~ A.~-zn cz cn No ~~ x~ Zgm -1z z~f DA o {DN Np OyN ~~ CA 11m AND Nm m~< ~D ~ r':Um -NpZ C"•1 ZN AO DD ADS nA O~~ r•IZ Z Jcm-I X10 m~ oD c N .yp n< zDD .Z1 _r \ nm zf D\ ~~ ~~ rnD nm ~\ pZ~ Dz o Fm NA ~ inm z~ °~m z~ ? oo\ >~ n DD OD N D\ ~\ O~ pn N \ () ~ F~ N = or In VCi N r f m A mF ~ D \ "'_ \ Z O (n D Ip U' J J W - b w J VI ~ m j r m - - m OI N N N N N N N N N ti = 17 O O A () A m Z ~ r r r r r r n n D D r r m m m m mp m m m m m 'v Ib ~ Ib ~ ~ ~ ~ Oc Oc ~ p GJr G~r~ ~ D~ Dp O Z O f m n n m v m ~ i N `L A VI O DZ c0 mr c f~- zlr cx N p ~ Z m z0 ND D ~Z ~ pD pZ pmp ZCZ N ~ ZZ Dj Nm DA -C ~ nm ~c O tin D Inmr D mrm Ao O Dj O C~ ~m 20 ;Z ~ m Sm A Dj Dn 0 Z O m . fN~1 \ ~ m T] O 2 - Z Z r p \ \ N\ Z\ ~ C D 2 A O -! D N D ti D (~ ' p~ m D f*1 D N ~~ D Z1 n r (A Z n N 2 m D A f ~ \ a ~ _ N N O N O \ m N I N - - - D D y v O v O cn w I D D °z z z ~ -1 -7 °z ' -~ r D Z (n C7 D m rn rn Z ~' (TI m LOT 2, BLOCK I, PORTSIDE ADDITION /Ohn Oliver & Associates, ~/iC. I here certify that this plan, specif- cotio report was prepared by me DATE: 02 25 08 REV NO. DATE DESCRIPTION \ Z o p ~' ELK RIVER, MN OR E & 0 TOOL & PLASTICS INC Civi[ Sxgtineering, Land Surveyi»g, Lnnd PWn»ing 580 Dodge Avenue Elk River, Minnesota 55330 763-441-2072 FAX 763-441-5665 or nde direct supervision and that I I Licensed Professiona Y Engineer u S e of Minnesota Statutes Sectio q2 326.15. !/1 _, / I / DESIGN BY: LPC DLC l DRAWN BY: DM CHECKED BY: WJM 1 3 26 OS CITY COMMENTS \ , . Offic¢s tin: Elk River & Burnsville, MN / V Signature: DWG: 8722-11-PLAND.dw TEXT: NONE v PRELIMINARY LANDSCAPE PLAN x%%%% x. x%%%%%, P Date: XX/XX/XXXX Lic. No. XX XX FILE NO.: 8722.11-03 E&O TOOL & PL Es Knn,4RCH E R6s MN ASTICS, INC. HERITAGE ~~CONSTNUCTION•COMVANlES•1. LC COLORED ELEVATIONS - - ~.. ~., ARCHITECTS, INC ITECTS, INC ~~~J~ ~~~~~~~~ w.... ~z~ i°~"